Latest bulk load from NGM, includes typo fix for Caveats and a Change to the housing reference for a small number of modules

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@4811 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
PriestJ
2008-04-16 16:42:15 +00:00
parent b3ebbef545
commit 600e12a712
3 changed files with 65 additions and 65 deletions

View File

@@ -1,70 +1,70 @@
"DOCUMENT_POSITION","JOB TYPE","METER TYPE","SERVICE PRESSURE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
@@ -80,13 +80,13 @@
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
@@ -404,19 +404,19 @@
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
1 DOCUMENT_POSITION JOB TYPE METER TYPE SERVICE PRESSURE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
3 CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
5 CONT_SUM ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
6 CONT_SUM ADVERSARIAL ROTARY LP 2 excluding lifting gear changes excluding lifting gear charges
7 CONT_SUM ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
8 CONT_SUM ADVERSARIAL ROTARY MP 2 excluding lifting gear changes excluding lifting gear charges
9 CONT_SUM ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
10 CONT_SUM ADVERSARIAL TURBINE LP 2 excluding lifting gear changes excluding lifting gear charges
11 CONT_SUM ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
12 CONT_SUM ADVERSARIAL TURBINE MP 2 excluding lifting gear changes excluding lifting gear charges
13 CONT_SUM EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
14 CONT_SUM EXCHANGE ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
15 CONT_SUM EXCHANGE ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
16 CONT_SUM EXCHANGE TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
17 CONT_SUM EXCHANGE TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
18 CONT_SUM INSTALL DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
19 CONT_SUM INSTALL ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
20 CONT_SUM INSTALL ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
21 CONT_SUM INSTALL TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
22 CONT_SUM INSTALL TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
23 CONT_SUM REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
24 CONT_SUM REMOVE DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
25 CONT_SUM STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
26 CONT_SUM STD EXCHANGE ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
27 CONT_SUM STD EXCHANGE ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
28 CONT_SUM STD EXCHANGE TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
29 CONT_SUM STD EXCHANGE TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
30 CONT_SUM STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
31 CONT_SUM STD INSTALL ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
32 CONT_SUM STD INSTALL ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
33 CONT_SUM STD INSTALL TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
34 CONT_SUM STD INSTALL TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
35 CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
36 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
37 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
38 CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
39 CONT_SUM_QA ADVERSARIAL ROTARY LP 2 excluding lifting gear changes excluding lifting gear charges
40 CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
41 CONT_SUM_QA ADVERSARIAL ROTARY MP 2 excluding lifting gear changes excluding lifting gear charges
42 CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
43 CONT_SUM_QA ADVERSARIAL TURBINE LP 2 excluding lifting gear changes excluding lifting gear charges
44 CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
45 CONT_SUM_QA ADVERSARIAL TURBINE MP 2 excluding lifting gear changes excluding lifting gear charges
46 CONT_SUM_QA EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
47 CONT_SUM_QA EXCHANGE ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
48 CONT_SUM_QA EXCHANGE ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
49 CONT_SUM_QA EXCHANGE TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
50 CONT_SUM_QA EXCHANGE TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
51 CONT_SUM_QA INSTALL DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
52 CONT_SUM_QA INSTALL ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
53 CONT_SUM_QA INSTALL ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
54 CONT_SUM_QA INSTALL TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
55 CONT_SUM_QA INSTALL TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
56 CONT_SUM_QA REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
57 CONT_SUM_QA REMOVE DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
58 CONT_SUM_QA STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
59 CONT_SUM_QA STD EXCHANGE ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
60 CONT_SUM_QA STD EXCHANGE ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
61 CONT_SUM_QA STD EXCHANGE TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
62 CONT_SUM_QA STD EXCHANGE TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
63 CONT_SUM_QA STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes excluding lifting gear charges
64 CONT_SUM_QA STD INSTALL ROTARY LP 1 excluding lifting gear changes excluding lifting gear charges
65 CONT_SUM_QA STD INSTALL ROTARY MP 1 excluding lifting gear changes excluding lifting gear charges
66 CONT_SUM_QA STD INSTALL TURBINE LP 1 excluding lifting gear changes excluding lifting gear charges
67 CONT_SUM_QA STD INSTALL TURBINE MP 1 excluding lifting gear changes excluding lifting gear charges
68 DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
69 DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
70 DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
80 DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
81 DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
82 DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
83 DESC_WORK REMOVE ROTARY LP 2 excluding lifting gear changes excluding lifting gear charges
84 DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
85 DESC_WORK REMOVE ROTARY MP 2 excluding lifting gear changes excluding lifting gear charges
86 DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
87 DESC_WORK REMOVE TURBINE LP 2 excluding lifting gear changes excluding lifting gear charges
88 DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
89 DESC_WORK REMOVE TURBINE MP 2 excluding lifting gear changes excluding lifting gear charges
90 DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
91 DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
92 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
404 TERM_COND STD INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
405 TERM_COND STD INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
406 CONT_SUM STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
407 CONT_SUM STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
408 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
409 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes excluding lifting gear charges
410 DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
411 DESC_WORK STD REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
412 DESC_WORK STD REMOVE ROTARY LP 1 Purging of downstream pipework.
413 DESC_WORK STD REMOVE ROTARY LP 2 excluding lifting gear changes excluding lifting gear charges
414 DESC_WORK STD REMOVE ROTARY MP 1 Purging of downstream pipework.
415 DESC_WORK STD REMOVE ROTARY MP 2 excluding lifting gear changes excluding lifting gear charges
416 DESC_WORK STD REMOVE TURBINE LP 1 Purging of downstream pipework.
417 DESC_WORK STD REMOVE TURBINE LP 2 excluding lifting gear changes excluding lifting gear charges
418 DESC_WORK STD REMOVE TURBINE MP 1 Purging of downstream pipework.
419 DESC_WORK STD REMOVE TURBINE MP 2 excluding lifting gear changes excluding lifting gear charges
420 TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
421 TERM_COND STD REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
422 TERM_COND STD REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted