Bulk load 2009 new data and changes, committing after initial testing in mip_bulk_load and mip_dev

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@10434 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
jamie.priest
2009-03-27 11:01:10 +00:00
parent d7ba74e6c3
commit 7c32d899ee
6 changed files with 272 additions and 376 deletions

View File

@@ -53,7 +53,6 @@
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
@@ -71,28 +70,22 @@
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","ROTARY","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","ROTARY","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","TURBINE","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","TURBINE","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",11,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","ROTARY","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","ROTARY","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","TURBINE","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","TURBINE","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
@@ -131,7 +124,7 @@
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on two visits, one to remove the exisiting meter, and one to install the new meter."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
@@ -405,17 +398,10 @@
"TERM_COND","STD INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
@@ -437,3 +423,11 @@
"TERM_COND","STD REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM_QA","REMOVE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","TURBINE","MP",1,"excluding lifting gear charges"
1 DOCUMENT_POSITION JOB TYPE METER TYPE SERVICE PRESSURE SORT_ORDER TEXT
53 CONT_SUM_QA INSTALL ROTARY MP 1 excluding lifting gear charges
54 CONT_SUM_QA INSTALL TURBINE LP 1 excluding lifting gear charges
55 CONT_SUM_QA INSTALL TURBINE MP 1 excluding lifting gear charges
CONT_SUM_QA REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
56 CONT_SUM_QA REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
57 CONT_SUM_QA STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear charges
58 CONT_SUM_QA STD EXCHANGE ROTARY LP 1 excluding lifting gear charges
70 DESC_WORK ADVERSARIAL ROTARY MP 1 Purging of downstream pipework.
71 DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
72 DESC_WORK ADVERSARIAL TURBINE MP 1 Purging of downstream pipework.
73 DESC_WORK TERM_COND EXCHANGE DIAPHRAGM LP 1 11 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
74 DESC_WORK TERM_COND EXCHANGE DIAPHRAGM MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
75 DESC_WORK TERM_COND EXCHANGE ROTARY LP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
76 DESC_WORK TERM_COND EXCHANGE ROTARY MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
77 DESC_WORK TERM_COND EXCHANGE TURBINE LP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
78 DESC_WORK TERM_COND EXCHANGE TURBINE MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
79 DESC_WORK REMOVE ROTARY LP 2 excluding lifting gear charges
DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
80 DESC_WORK REMOVE ROTARY MP 2 excluding lifting gear charges
DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
81 DESC_WORK REMOVE TURBINE LP 2 excluding lifting gear charges
DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
82 DESC_WORK REMOVE TURBINE MP 2 excluding lifting gear charges
83 DESC_WORK TERM_COND STD EXCHANGE DIAPHRAGM LP 1 11 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
84 DESC_WORK TERM_COND STD EXCHANGE DIAPHRAGM MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
85 DESC_WORK TERM_COND STD EXCHANGE ROTARY LP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
86 DESC_WORK TERM_COND STD EXCHANGE ROTARY MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
87 DESC_WORK TERM_COND STD EXCHANGE TURBINE LP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
88 DESC_WORK TERM_COND STD EXCHANGE TURBINE MP 1 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
89 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
90 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
91 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
124 TERM_COND EXCHANGE DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
125 TERM_COND EXCHANGE DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126 TERM_COND EXCHANGE DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
127 TERM_COND EXCHANGE DIAPHRAGM LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. This quotation is based on two visits, one to remove the exisiting meter, and one to install the new meter.
128 TERM_COND EXCHANGE DIAPHRAGM LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
129 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
130 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
398 TERM_COND STD INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
399 CONT_SUM STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
400 CONT_SUM STD REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
CONT_SUM_QA STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
401 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK STD REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK STD REMOVE ROTARY LP 1 Purging of downstream pipework.
402 DESC_WORK STD REMOVE ROTARY LP 2 excluding lifting gear charges
DESC_WORK STD REMOVE ROTARY MP 1 Purging of downstream pipework.
403 DESC_WORK STD REMOVE ROTARY MP 2 excluding lifting gear charges
DESC_WORK STD REMOVE TURBINE LP 1 Purging of downstream pipework.
404 DESC_WORK STD REMOVE TURBINE LP 2 excluding lifting gear charges
DESC_WORK STD REMOVE TURBINE MP 1 Purging of downstream pipework.
405 DESC_WORK STD REMOVE TURBINE MP 2 excluding lifting gear charges
406 TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
407 TERM_COND STD REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
423 TERM_COND STD REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
424 TERM_COND STD REMOVE TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
425 TERM_COND STD REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.
426 CONT_SUM_QA REMOVE ROTARY LP 1 excluding lifting gear charges
427 CONT_SUM_QA REMOVE ROTARY MP 1 excluding lifting gear charges
428 CONT_SUM_QA REMOVE TURBINE LP 1 excluding lifting gear charges
429 CONT_SUM_QA REMOVE TURBINE MP 1 excluding lifting gear charges
430 CONT_SUM_QA STD REMOVE ROTARY LP 1 excluding lifting gear charges
431 CONT_SUM_QA STD REMOVE ROTARY MP 1 excluding lifting gear charges
432 CONT_SUM_QA STD REMOVE TURBINE LP 1 excluding lifting gear charges
433 CONT_SUM_QA STD REMOVE TURBINE MP 1 excluding lifting gear charges