updated caveat text on BULK_LOAD.xls to include updated supply caveat. Updated CAVEATS.csv to the current caveat text.

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@3517 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
PriestJ
2008-02-12 11:34:36 +00:00
parent 0c5034b8c9
commit bf678428c8
2 changed files with 302 additions and 309 deletions

Binary file not shown.

View File

@@ -1,337 +1,330 @@
"DOCUMENT_POSITION","ENTY_CODE","METY_CODE","SVCPT_CODE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
DOCUMENT_POSITION,ENTY_CODE,METY_CODE,SVCPT_CODE,SORT_ORDER,TEXT
CONT_SUM,ADVERSARIAL,TURBINE,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,ROTARY,MP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,MP,2,plus purging on time and materials basis.
CONT_SUM,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,STD EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
TERM_COND,ADDON,DIAPHRAGM,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided.
TERM_COND,ADVERSARIAL,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND,EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
"
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
"
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
"
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
"
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
"
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
"
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
"
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,OFMAT,DIAPHRAGM,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,REMOVE,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided
TERM_COND,REMOVE,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,DIAPHRAGM,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,STD EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,STD EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,STD REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
1 DOCUMENT_POSITION ENTY_CODE METY_CODE SVCPT_CODE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL DIAPHRAGM TURBINE LP 1 plus purging on time and materials basis. excluding lifting gear changes
3 CONT_SUM ADVERSARIAL DIAPHRAGM MP LP 1 plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis. excluding lifting gear changes
5 CONT_SUM ADVERSARIAL ROTARY TURBINE MP LP 1 2 plus purging on time and materials basis.
6 CONT_SUM ADVERSARIAL TURBINE ROTARY LP 1 2 plus purging on time and materials basis.
7 CONT_SUM ADVERSARIAL TURBINE DIAPHRAGM MP 1 plus purging on time and materials basis.
8 CONT_SUM STD REMOVE ADVERSARIAL DIAPHRAGM ROTARY LP MP 1 plus purging on time and materials basis. excluding lifting gear changes
9 CONT_SUM_QA CONT_SUM ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 plus purging on time and materials basis. excluding lifting gear changes
10 CONT_SUM_QA CONT_SUM ADVERSARIAL DIAPHRAGM ROTARY MP 1 2 plus purging on time and materials basis.
11 CONT_SUM_QA CONT_SUM ADVERSARIAL ROTARY TURBINE LP MP 1 2 plus purging on time and materials basis.
12 CONT_SUM_QA CONT_SUM ADVERSARIAL STD REMOVE ROTARY DIAPHRAGM MP LP 1 plus purging on time and materials basis.
13 CONT_SUM_QA ADVERSARIAL TURBINE ROTARY LP 1 plus purging on time and materials basis.
14 CONT_SUM_QA ADVERSARIAL TURBINE DIAPHRAGM MP LP 1 plus purging on time and materials basis.
15 CONT_SUM_QA STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP 1 plus purging on time and materials basis.
16 DESC_WORK CONT_SUM_QA ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 Purging of downstream pipework. plus purging on time and materials basis.
17 DESC_WORK CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework. plus purging on time and materials basis.
18 DESC_WORK CONT_SUM_QA ADVERSARIAL ROTARY LP MP 1 Purging of downstream pipework. plus purging on time and materials basis.
19 DESC_WORK CONT_SUM_QA ADVERSARIAL STD REMOVE ROTARY DIAPHRAGM MP LP 1 Purging of downstream pipework. plus purging on time and materials basis.
20 DESC_WORK ADVERSARIAL TURBINE DIAPHRAGM LP 1 Purging of downstream pipework.
21 DESC_WORK ADVERSARIAL TURBINE MP LP 1 Purging of downstream pipework.
22 DESC_WORK EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
23 DESC_WORK EXCHANGE ADVERSARIAL DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
24 DESC_WORK EXCHANGE ADVERSARIAL ROTARY LP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
25 DESC_WORK EXCHANGE ADVERSARIAL ROTARY TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
26 DESC_WORK EXCHANGE TURBINE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27 DESC_WORK EXCHANGE TURBINE DIAPHRAGM MP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28 DESC_WORK REMOVE EXCHANGE DIAPHRAGM TURBINE LP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29 DESC_WORK REMOVE EXCHANGE DIAPHRAGM ROTARY MP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30 DESC_WORK REMOVE EXCHANGE ROTARY TURBINE LP MP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31 DESC_WORK REMOVE EXCHANGE ROTARY DIAPHRAGM MP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32 DESC_WORK REMOVE TURBINE DIAPHRAGM LP 1 Purging of downstream pipework.
33 DESC_WORK REMOVE TURBINE MP LP 1 Purging of downstream pipework.
34 DESC_WORK STD EXCHANGE REMOVE DIAPHRAGM ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
35 DESC_WORK STD EXCHANGE REMOVE DIAPHRAGM ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
36 DESC_WORK STD EXCHANGE REMOVE ROTARY DIAPHRAGM LP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
37 DESC_WORK STD EXCHANGE REMOVE ROTARY TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
38 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39 DESC_WORK STD EXCHANGE TURBINE DIAPHRAGM MP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40 DESC_WORK STD REMOVE STD EXCHANGE DIAPHRAGM ROTARY LP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41 TERM_COND DESC_WORK ADDON STD EXCHANGE DIAPHRAGM TURBINE LP MP 1 This quotation is based on there being a working LF connection on the existing meter. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42 TERM_COND DESC_WORK ADDON STD EXCHANGE DIAPHRAGM ROTARY LP MP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43 TERM_COND DESC_WORK ADDON STD EXCHANGE DIAPHRAGM LP MP 3 1 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44 TERM_COND DESC_WORK ADDON STD REMOVE DIAPHRAGM MP LP 1 This quotation is based on there being a working LF connection on the existing meter. Purging of downstream pipework.
45 TERM_COND ADDON DIAPHRAGM MP LP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. This quotation is based on there being a working LF connection on the existing meter.
46 TERM_COND ADDON DIAPHRAGM TURBINE MP LP 3 1 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation is based on there being a working LF connection on the existing meter.
47 TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
48 TERM_COND ADDON ROTARY DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
49 TERM_COND ADDON ROTARY TURBINE LP 3 2 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation does not include for the provision of a separate instrumentation cabinet.
50 TERM_COND ADDON ROTARY MP LP 1 2 This quotation is based on there being a working LF connection on the existing meter. This quotation does not include for the provision of a separate instrumentation cabinet.
51 TERM_COND ADDON ROTARY TURBINE MP LP 2 3 This quotation does not include for the provision of a separate instrumentation cabinet. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
52 TERM_COND ADDON ROTARY MP LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
53 TERM_COND ADDON TURBINE DIAPHRAGM LP 1 3 This quotation is based on there being a working LF connection on the existing meter. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54 TERM_COND ADDON TURBINE DIAPHRAGM LP MP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. This quotation is based on there being a working LF connection on the existing meter.
55 TERM_COND ADDON TURBINE ROTARY LP MP 3 1 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation is based on there being a working LF connection on the existing meter.
56 TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
57 TERM_COND ADDON TURBINE ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
58 TERM_COND ADDON TURBINE DIAPHRAGM MP 3 2 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation does not include for the provision of a separate instrumentation cabinet.
59 TERM_COND ADVERSARIAL ADDON DIAPHRAGM TURBINE LP MP 1 2 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation does not include for the provision of a separate instrumentation cabinet.
60 TERM_COND ADVERSARIAL ADDON ROTARY DIAPHRAGM LP MP 1 3 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
61 TERM_COND ADVERSARIAL ADDON ROTARY LP MP 2 3 Lifting gear if required will be charged at a rate of 400 per day. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
62 TERM_COND ADVERSARIAL ADDON ROTARY TURBINE MP 1 3 Lifting gear if required will be charged at a rate of 400 per day. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63 TERM_COND ADVERSARIAL TURBINE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64 TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
65 TERM_COND ADVERSARIAL TURBINE ROTARY LP 2 1 Lifting gear if required will be charged at a rate of 400 per day. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
66 TERM_COND ADVERSARIAL TURBINE MP LP 1 2 Lifting gear if required will be charged at a rate of 400 per day.
67 TERM_COND EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Lifting gear if required will be charged at a rate of 400 per day.
68 TERM_COND EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. Lifting gear if required will be charged at a rate of 400 per day.
69 TERM_COND EXCHANGE ADVERSARIAL DIAPHRAGM TURBINE LP MP 3 1 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. Lifting gear if required will be charged at a rate of 400 per day.
70 TERM_COND EXCHANGE DIAPHRAGM TURBINE LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
71 TERM_COND EXCHANGE DIAPHRAGM ROTARY LP 5 1 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
72 TERM_COND EXCHANGE DIAPHRAGM LP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
73 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
74 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
75 TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
76 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
77 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
78 TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
79 TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
80 TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
81 TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
82 TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
83 TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
84 TERM_COND EXCHANGE DIAPHRAGM TURBINE LP 7 5 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
85 TERM_COND EXCHANGE DIAPHRAGM ROTARY LP 8 6 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
86 TERM_COND EXCHANGE DIAPHRAGM TURBINE LP 9 6 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
87 TERM_COND EXCHANGE ROTARY DIAPHRAGM MP LP 3 6 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88 TERM_COND EXCHANGE ROTARY DIAPHRAGM MP LP 4 7 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
89 TERM_COND EXCHANGE ROTARY TURBINE MP LP 5 7 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
90 TERM_COND EXCHANGE TURBINE ROTARY MP LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
91 TERM_COND EXCHANGE TURBINE DIAPHRAGM MP LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
92 TERM_COND EXCHANGE TURBINE MP LP 9 8 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
93 TERM_COND INSTALL EXCHANGE DIAPHRAGM ROTARY LP 1 8 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
94 TERM_COND INSTALL EXCHANGE DIAPHRAGM TURBINE LP 2 9 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
95 TERM_COND INSTALL EXCHANGE DIAPHRAGM ROTARY LP 3 9 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96 TERM_COND INSTALL EXCHANGE DIAPHRAGM LP 4 9 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
97 TERM_COND INSTALL EXCHANGE DIAPHRAGM ROTARY LP MP 5 1 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98 TERM_COND INSTALL EXCHANGE DIAPHRAGM TURBINE LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
99 TERM_COND INSTALL EXCHANGE DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
100 TERM_COND INSTALL EXCHANGE DIAPHRAGM TURBINE MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
101 TERM_COND INSTALL EXCHANGE DIAPHRAGM ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
102 TERM_COND INSTALL EXCHANGE DIAPHRAGM MP 3 2 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
103 TERM_COND INSTALL EXCHANGE DIAPHRAGM ROTARY MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
104 TERM_COND INSTALL EXCHANGE DIAPHRAGM MP 5 3 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
105 TERM_COND INSTALL EXCHANGE DIAPHRAGM TURBINE MP 6 3 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
106 TERM_COND INSTALL EXCHANGE DIAPHRAGM TURBINE MP 7 4 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
107 TERM_COND INSTALL EXCHANGE ROTARY LP MP 1 4 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
108 TERM_COND INSTALL EXCHANGE ROTARY DIAPHRAGM LP MP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
109 TERM_COND INSTALL EXCHANGE ROTARY LP MP 3 5 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
110 TERM_COND INSTALL EXCHANGE ROTARY DIAPHRAGM LP MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
111 TERM_COND INSTALL EXCHANGE ROTARY TURBINE LP MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
112 TERM_COND INSTALL EXCHANGE ROTARY LP MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
113 TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
114 TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115 TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116 TERM_COND EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
117 TERM_COND INSTALL EXCHANGE ROTARY DIAPHRAGM LP MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
118 TERM_COND INSTALL EXCHANGE ROTARY DIAPHRAGM MP 1 8 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
119 TERM_COND INSTALL EXCHANGE ROTARY MP 2 8 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL TURBINE LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
120 TERM_COND INSTALL EXCHANGE TURBINE MP 5 8 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
121 TERM_COND INSTALL EXCHANGE TURBINE DIAPHRAGM MP 6 9 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
122 TERM_COND INSTALL EXCHANGE TURBINE ROTARY MP 7 9 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
123 TERM_COND STD EXCHANGE EXCHANGE DIAPHRAGM TURBINE LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
124 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
125 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM LP 3 1 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
126 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM TURBINE LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
127 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM LP 5 2 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
128 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP 6 2 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
129 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM TURBINE LP 7 2 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
130 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM TURBINE LP 8 3 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
131 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP 9 3 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
132 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM MP LP 1 3 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM MP LP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
134 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM TURBINE MP LP 3 4 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
135 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY MP LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
136 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY MP LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
137 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM TURBINE MP LP 6 5 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
138 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM MP LP 7 5 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
139 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM MP LP 8 6 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
140 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY MP LP 9 6 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141 TERM_COND STD EXCHANGE INSTALL ROTARY TURBINE LP 1 6 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
142 TERM_COND STD EXCHANGE INSTALL ROTARY TURBINE LP 2 7 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
143 TERM_COND STD EXCHANGE INSTALL ROTARY DIAPHRAGM LP 3 7 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144 TERM_COND STD EXCHANGE INSTALL ROTARY LP 4 7 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
145 TERM_COND STD EXCHANGE INSTALL ROTARY LP MP 5 1 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
146 TERM_COND STD EXCHANGE INSTALL ROTARY TURBINE LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
147 TERM_COND STD EXCHANGE INSTALL ROTARY DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148 TERM_COND STD EXCHANGE INSTALL ROTARY DIAPHRAGM LP MP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149 TERM_COND STD EXCHANGE INSTALL ROTARY TURBINE LP MP 9 2 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND STD EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND STD EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
150 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
151 TERM_COND STD EXCHANGE INSTALL TURBINE LP MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
152 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND STD EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
TERM_COND STD EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE TURBINE MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND STD EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND STD EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL DIAPHRAGM LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
153 TERM_COND STD INSTALL INSTALL DIAPHRAGM LP MP 7 3 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
154 TERM_COND STD INSTALL INSTALL DIAPHRAGM TURBINE MP 1 4 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
155 TERM_COND STD INSTALL INSTALL DIAPHRAGM ROTARY MP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL DIAPHRAGM MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND STD INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND STD INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND STD INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL ROTARY LP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL ROTARY LP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
TERM_COND STD INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
TERM_COND STD INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL ROTARY MP 5 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
TERM_COND STD INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL ROTARY MP 7 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
156 TERM_COND STD INSTALL INSTALL TURBINE DIAPHRAGM LP MP 1 4 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
157 TERM_COND STD INSTALL INSTALL TURBINE ROTARY LP MP 2 5 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
158 TERM_COND STD INSTALL INSTALL TURBINE DIAPHRAGM LP MP 3 5 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
159 TERM_COND STD INSTALL INSTALL TURBINE LP MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
160 TERM_COND STD INSTALL INSTALL TURBINE DIAPHRAGM LP MP 5 6 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
161 TERM_COND STD INSTALL INSTALL TURBINE ROTARY LP MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
162 TERM_COND STD INSTALL INSTALL TURBINE LP MP 7 6 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
163 TERM_COND STD INSTALL INSTALL TURBINE MP 1 7 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
164 TERM_COND STD INSTALL INSTALL TURBINE ROTARY MP 2 7 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
165 TERM_COND STD INSTALL INSTALL TURBINE DIAPHRAGM MP 3 7 Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166 TERM_COND STD INSTALL OFMAT TURBINE DIAPHRAGM MP LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
167 TERM_COND STD INSTALL OFMAT TURBINE ROTARY MP LP 5 1 This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
168 TERM_COND STD INSTALL OFMAT TURBINE MP LP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
169 TERM_COND STD INSTALL OFMAT TURBINE DIAPHRAGM MP 7 1 The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
170 TERM_COND STD REMOVE OFMAT DIAPHRAGM ROTARY LP MP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
171 TERM_COND STD REMOVE OFMAT DIAPHRAGM TURBINE LP MP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
172 TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
173 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
174 TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
175 TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
176 TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
177 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
178 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
179 TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
180 TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
181 TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
182 TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
183 TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
184 TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
185 TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
186 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
187 TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189 TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
190 TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
191 TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
192 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
193 TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
194 TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
195 TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
196 TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
197 TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
198 TERM_COND STD EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
199 TERM_COND STD EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
200 TERM_COND STD EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
201 TERM_COND STD EXCHANGE DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
202 TERM_COND STD EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
203 TERM_COND STD EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
204 TERM_COND STD EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
205 TERM_COND STD EXCHANGE DIAPHRAGM LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
206 TERM_COND STD EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
207 TERM_COND STD EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
208 TERM_COND STD EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
209 TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
210 TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211 TERM_COND STD EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
212 TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
213 TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
214 TERM_COND STD EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
215 TERM_COND STD EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
217 TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
218 TERM_COND STD EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
219 TERM_COND STD EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
220 TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
221 TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
222 TERM_COND STD EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
223 TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
224 TERM_COND STD EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
225 TERM_COND STD EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
226 TERM_COND STD EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227 TERM_COND STD EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228 TERM_COND STD EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
229 TERM_COND STD EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230 TERM_COND STD EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231 TERM_COND STD EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
232 TERM_COND STD EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
233 TERM_COND STD EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
234 TERM_COND STD EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
235 TERM_COND STD EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
236 TERM_COND STD INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
237 TERM_COND STD INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
238 TERM_COND STD INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
239 TERM_COND STD INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
240 TERM_COND STD INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
241 TERM_COND STD INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242 TERM_COND STD INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
243 TERM_COND STD INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
244 TERM_COND STD INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
245 TERM_COND STD INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
246 TERM_COND STD INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
247 TERM_COND STD INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248 TERM_COND STD INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
249 TERM_COND STD INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
250 TERM_COND STD INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
251 TERM_COND STD INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
252 TERM_COND STD INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
253 TERM_COND STD INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
254 TERM_COND STD INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
255 TERM_COND STD INSTALL ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
256 TERM_COND STD INSTALL TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
257 TERM_COND STD INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
258 TERM_COND STD INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
259 TERM_COND STD INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
260 TERM_COND STD INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
261 TERM_COND STD INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
262 TERM_COND STD INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
263 TERM_COND STD INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
264 TERM_COND STD INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
265 TERM_COND STD INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
266 TERM_COND STD INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
267 TERM_COND STD INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
268 TERM_COND STD INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
269 TERM_COND STD INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
270 TERM_COND STD INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
271 TERM_COND STD INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
272 TERM_COND STD INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273 TERM_COND STD INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
274 TERM_COND STD INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
275 TERM_COND STD INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
276 TERM_COND STD INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
277 TERM_COND STD INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
278 TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
279 TERM_COND STD REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330