1DOCUMENT_POSITIONENTY_CODEMETY_CODESVCPT_CODESORT_ORDERTEXT
2CONT_SUMADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
3CONT_SUMADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
4CONT_SUMADVERSARIALROTARYLP1plus purging on time and materials basis.
5CONT_SUMADVERSARIALROTARYMP1plus purging on time and materials basis.
6CONT_SUMADVERSARIALTURBINELP1plus purging on time and materials basis.
7CONT_SUMADVERSARIALTURBINEMP1plus purging on time and materials basis.
8CONT_SUMSTD REMOVEDIAPHRAGMLP1plus purging on time and materials basis.
9CONT_SUM_QAADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
10CONT_SUM_QAADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
11CONT_SUM_QAADVERSARIALROTARYLP1plus purging on time and materials basis.
12CONT_SUM_QAADVERSARIALROTARYMP1plus purging on time and materials basis.
13CONT_SUM_QAADVERSARIALTURBINELP1plus purging on time and materials basis.
14CONT_SUM_QAADVERSARIALTURBINEMP1plus purging on time and materials basis.
15CONT_SUM_QASTD REMOVEDIAPHRAGMLP1plus purging on time and materials basis.
16DESC_WORKADVERSARIALDIAPHRAGMLP1Purging of downstream pipework.
17DESC_WORKADVERSARIALDIAPHRAGMMP1Purging of downstream pipework.
18DESC_WORKADVERSARIALROTARYLP1Purging of downstream pipework.
19DESC_WORKADVERSARIALROTARYMP1Purging of downstream pipework.
20DESC_WORKADVERSARIALTURBINELP1Purging of downstream pipework.
21DESC_WORKADVERSARIALTURBINEMP1Purging of downstream pipework.
22DESC_WORKEXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
23DESC_WORKEXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
24DESC_WORKEXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
25DESC_WORKEXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
26DESC_WORKEXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27DESC_WORKEXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28DESC_WORKREMOVEDIAPHRAGMLP1Purging of downstream pipework.
29DESC_WORKREMOVEDIAPHRAGMMP1Purging of downstream pipework.
30DESC_WORKREMOVEROTARYLP1Purging of downstream pipework.
31DESC_WORKREMOVEROTARYMP1Purging of downstream pipework.
32DESC_WORKREMOVETURBINELP1Purging of downstream pipework.
33DESC_WORKREMOVETURBINEMP1Purging of downstream pipework.
34DESC_WORKSTD EXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
35DESC_WORKSTD EXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
36DESC_WORKSTD EXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
37DESC_WORKSTD EXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
38DESC_WORKSTD EXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39DESC_WORKSTD EXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40DESC_WORKSTD REMOVEDIAPHRAGMLP1Purging of downstream pipework.
41TERM_CONDADDONDIAPHRAGMLP1This quotation is based on there being a working LF connection on the existing meter.
42TERM_CONDADDONDIAPHRAGMLP2This quotation does not include for the provision of a separate instrumentation cabinet.
43TERM_CONDADDONDIAPHRAGMLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
44TERM_CONDADDONDIAPHRAGMMP1This quotation is based on there being a working LF connection on the existing meter.
45TERM_CONDADDONDIAPHRAGMMP2This quotation does not include for the provision of a separate instrumentation cabinet.
46TERM_CONDADDONDIAPHRAGMMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
47TERM_CONDADDONROTARYLP1This quotation is based on there being a working LF connection on the existing meter.
48TERM_CONDADDONROTARYLP2This quotation does not include for the provision of a separate instrumentation cabinet.
49TERM_CONDADDONROTARYLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
50TERM_CONDADDONROTARYMP1This quotation is based on there being a working LF connection on the existing meter.
51TERM_CONDADDONROTARYMP2This quotation does not include for the provision of a separate instrumentation cabinet.
52TERM_CONDADDONROTARYMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
53TERM_CONDADDONTURBINELP1This quotation is based on there being a working LF connection on the existing meter.
54TERM_CONDADDONTURBINELP2This quotation does not include for the provision of a separate instrumentation cabinet.
55TERM_CONDADDONTURBINELP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
56TERM_CONDADDONTURBINEMP1This quotation is based on there being a working LF connection on the existing meter.
57TERM_CONDADDONTURBINEMP2This quotation does not include for the provision of a separate instrumentation cabinet.
58TERM_CONDADDONTURBINEMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
59TERM_CONDADVERSARIALDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
60TERM_CONDADVERSARIALROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
61TERM_CONDADVERSARIALROTARYLP2Lifting gear if required will be charged at a rate of £400 per day.
62TERM_CONDADVERSARIALROTARYMP1Lifting gear if required will be charged at a rate of £400 per day.
63TERM_CONDADVERSARIALTURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64TERM_CONDADVERSARIALTURBINELP2Lifting gear if required will be charged at a rate of £400 per day.
65TERM_CONDADVERSARIALTURBINEMP1Lifting gear if required will be charged at a rate of £400 per day.
66TERM_CONDEXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
67TERM_CONDEXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
68TERM_CONDEXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
69TERM_CONDEXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
70TERM_CONDEXCHANGEDIAPHRAGMLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
71TERM_CONDEXCHANGEDIAPHRAGMLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
72TERM_CONDEXCHANGEDIAPHRAGMLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
73TERM_CONDEXCHANGEDIAPHRAGMLP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
74TERM_CONDEXCHANGEDIAPHRAGMLP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
75TERM_CONDEXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
76TERM_CONDEXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
77TERM_CONDEXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
78TERM_CONDEXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
79TERM_CONDEXCHANGEDIAPHRAGMMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
80TERM_CONDEXCHANGEDIAPHRAGMMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
81TERM_CONDEXCHANGEDIAPHRAGMMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
82TERM_CONDEXCHANGEDIAPHRAGMMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
83TERM_CONDEXCHANGEDIAPHRAGMMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
84TERM_CONDEXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
85TERM_CONDEXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
86TERM_CONDEXCHANGEROTARYLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
87TERM_CONDEXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
88TERM_CONDEXCHANGEROTARYLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
89TERM_CONDEXCHANGEROTARYLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
90TERM_CONDEXCHANGEROTARYLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
91TERM_CONDEXCHANGEROTARYLP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
92TERM_CONDEXCHANGEROTARYLP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
93TERM_CONDEXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
94TERM_CONDEXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
95TERM_CONDEXCHANGEROTARYMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
96TERM_CONDEXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
97TERM_CONDEXCHANGEROTARYMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
98TERM_CONDEXCHANGEROTARYMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
99TERM_CONDEXCHANGEROTARYMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
100TERM_CONDEXCHANGEROTARYMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
101TERM_CONDEXCHANGEROTARYMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
102TERM_CONDEXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
103TERM_CONDEXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
104TERM_CONDEXCHANGETURBINELP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
105TERM_CONDEXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
106TERM_CONDEXCHANGETURBINELP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
107TERM_CONDEXCHANGETURBINELP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
108TERM_CONDEXCHANGETURBINELP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
109TERM_CONDEXCHANGETURBINELP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
110TERM_CONDEXCHANGETURBINELP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
111TERM_CONDEXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
112TERM_CONDEXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
113TERM_CONDEXCHANGETURBINEMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
114TERM_CONDEXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
115TERM_CONDEXCHANGETURBINEMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
116TERM_CONDEXCHANGETURBINEMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
117TERM_CONDEXCHANGETURBINEMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
118TERM_CONDEXCHANGETURBINEMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
119TERM_CONDEXCHANGETURBINEMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
120TERM_CONDINSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
121TERM_CONDINSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
122TERM_CONDINSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
123TERM_CONDINSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
124TERM_CONDINSTALLDIAPHRAGMLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
125TERM_CONDINSTALLDIAPHRAGMLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126TERM_CONDINSTALLDIAPHRAGMLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
127TERM_CONDINSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
128TERM_CONDINSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
129TERM_CONDINSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
130TERM_CONDINSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
131TERM_CONDINSTALLDIAPHRAGMMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
132TERM_CONDINSTALLDIAPHRAGMMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
133TERM_CONDINSTALLDIAPHRAGMMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
134TERM_CONDINSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
135TERM_CONDINSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
136TERM_CONDINSTALLROTARYLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
137TERM_CONDINSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
138TERM_CONDINSTALLROTARYLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
139TERM_CONDINSTALLROTARYLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
140TERM_CONDINSTALLROTARYLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
141TERM_CONDINSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
142TERM_CONDINSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
143TERM_CONDINSTALLROTARYMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
144TERM_CONDINSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
145TERM_CONDINSTALLROTARYMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
146TERM_CONDINSTALLROTARYMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
147TERM_CONDINSTALLROTARYMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
148TERM_CONDINSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
149TERM_CONDINSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
150TERM_CONDINSTALLTURBINELP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
151TERM_CONDINSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
152TERM_CONDINSTALLTURBINELP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
153TERM_CONDINSTALLTURBINELP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
154TERM_CONDINSTALLTURBINELP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
155TERM_CONDINSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
156TERM_CONDINSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
157TERM_CONDINSTALLTURBINEMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
158TERM_CONDINSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
159TERM_CONDINSTALLTURBINEMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
160TERM_CONDINSTALLTURBINEMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
161TERM_CONDINSTALLTURBINEMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
162TERM_CONDOFMATDIAPHRAGMLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
163TERM_CONDOFMATDIAPHRAGMMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
164TERM_CONDOFMATROTARYLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
165TERM_CONDOFMATROTARYMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
166TERM_CONDOFMATTURBINELP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
167TERM_CONDOFMATTURBINEMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
168TERM_CONDREMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
169TERM_CONDREMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
170TERM_CONDREMOVEDIAPHRAGMMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
171TERM_CONDREMOVEROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
172TERM_CONDREMOVEROTARYLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
173TERM_CONDREMOVEROTARYMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
174TERM_CONDREMOVETURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
175TERM_CONDREMOVETURBINELP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
176TERM_CONDREMOVETURBINELP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
177TERM_CONDREMOVETURBINEMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
178TERM_CONDSTD EXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
179TERM_CONDSTD EXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
180TERM_CONDSTD EXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
181TERM_CONDSTD EXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
182TERM_CONDSTD EXCHANGEDIAPHRAGMLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
183TERM_CONDSTD EXCHANGEDIAPHRAGMLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
184TERM_CONDSTD EXCHANGEDIAPHRAGMLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
185TERM_CONDSTD EXCHANGEDIAPHRAGMLP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
186TERM_CONDSTD EXCHANGEDIAPHRAGMLP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
187TERM_CONDSTD EXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
188TERM_CONDSTD EXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
189TERM_CONDSTD EXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
190TERM_CONDSTD EXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
191TERM_CONDSTD EXCHANGEDIAPHRAGMMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a singlestream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
192TERM_CONDSTD EXCHANGEDIAPHRAGMMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
193TERM_CONDSTD EXCHANGEDIAPHRAGMMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
194TERM_CONDSTD EXCHANGEDIAPHRAGMMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
195TERM_CONDSTD EXCHANGEDIAPHRAGMMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
196TERM_CONDSTD EXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
197TERM_CONDSTD EXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
198TERM_CONDSTD EXCHANGEROTARYLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
199TERM_CONDSTD EXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
200TERM_CONDSTD EXCHANGEROTARYLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
201TERM_CONDSTD EXCHANGEROTARYLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
202TERM_CONDSTD EXCHANGEROTARYLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
203TERM_CONDSTD EXCHANGEROTARYLP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
204TERM_CONDSTD EXCHANGEROTARYLP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
205TERM_CONDSTD EXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
206TERM_CONDSTD EXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
207TERM_CONDSTD EXCHANGEROTARYMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
208TERM_CONDSTD EXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
209TERM_CONDSTD EXCHANGEROTARYMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
210TERM_CONDSTD EXCHANGEROTARYMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
211TERM_CONDSTD EXCHANGEROTARYMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
212TERM_CONDSTD EXCHANGEROTARYMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
213TERM_CONDSTD EXCHANGEROTARYMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
214TERM_CONDSTD EXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
215TERM_CONDSTD EXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
216TERM_CONDSTD EXCHANGETURBINELP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
217TERM_CONDSTD EXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
218TERM_CONDSTD EXCHANGETURBINELP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
219TERM_CONDSTD EXCHANGETURBINELP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
220TERM_CONDSTD EXCHANGETURBINELP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
221TERM_CONDSTD EXCHANGETURBINELP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
222TERM_CONDSTD EXCHANGETURBINELP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
223TERM_CONDSTD EXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
224TERM_CONDSTD EXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
225TERM_CONDSTD EXCHANGETURBINEMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed
226TERM_CONDSTD EXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
227TERM_CONDSTD EXCHANGETURBINEMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a single stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
228TERM_CONDSTD EXCHANGETURBINEMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
229TERM_CONDSTD EXCHANGETURBINEMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
230TERM_CONDSTD EXCHANGETURBINEMP8This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231TERM_CONDSTD EXCHANGETURBINEMP9Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
232TERM_CONDSTD INSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
233TERM_CONDSTD INSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
234TERM_CONDSTD INSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
235TERM_CONDSTD INSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
236TERM_CONDSTD INSTALLDIAPHRAGMLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
237TERM_CONDSTD INSTALLDIAPHRAGMLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
238TERM_CONDSTD INSTALLDIAPHRAGMLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
239TERM_CONDSTD INSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
240TERM_CONDSTD INSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
241TERM_CONDSTD INSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
242TERM_CONDSTD INSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
243TERM_CONDSTD INSTALLDIAPHRAGMMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
244TERM_CONDSTD INSTALLDIAPHRAGMMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
245TERM_CONDSTD INSTALLDIAPHRAGMMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
246TERM_CONDSTD INSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
247TERM_CONDSTD INSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
248TERM_CONDSTD INSTALLROTARYLP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
249TERM_CONDSTD INSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
250TERM_CONDSTD INSTALLROTARYLP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
251TERM_CONDSTD INSTALLROTARYLP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
252TERM_CONDSTD INSTALLROTARYLP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
253TERM_CONDSTD INSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
254TERM_CONDSTD INSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
255TERM_CONDSTD INSTALLROTARYMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
256TERM_CONDSTD INSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
257TERM_CONDSTD INSTALLROTARYMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
258TERM_CONDSTD INSTALLROTARYMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
259TERM_CONDSTD INSTALLROTARYMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
260TERM_CONDSTD INSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
261TERM_CONDSTD INSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
262TERM_CONDSTD INSTALLTURBINELP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
263TERM_CONDSTD INSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
264TERM_CONDSTD INSTALLTURBINELP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
265TERM_CONDSTD INSTALLTURBINELP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
266TERM_CONDSTD INSTALLTURBINELP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
267TERM_CONDSTD INSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
268TERM_CONDSTD INSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure to provide adequate housing will result in the job not being completed.
269TERM_CONDSTD INSTALLTURBINEMP3Minimum Base dimension requirements for this module are: L nnn mm x W nnn mm x H nnn mm . Failure not to provide accurate base will result in the job not being completed.
270TERM_CONDSTD INSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of nnn (insert design minimum pressure) mbar under Qmax load at the ECV outlet point.
271TERM_CONDSTD INSTALLTURBINEMP5This quotation is based on a xxxxxx (insert inlet orientation) inlet and xxxxxx (insert outlet orientation) outlet and the ECV being installed to the dimensions provided The meter module offered is a xxxx (twin/single) stream supply with only a nominal bypass facility. The bypass is only used during maintenance, and is only sized to maintain gas pressure downstream. Please note that during maintenance it will be necessary to disrupt supplies.
272TERM_CONDSTD INSTALLTURBINEMP6It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273TERM_CONDSTD INSTALLTURBINEMP7The proposed meter module has a Qmin of nnn kWh and is based on the requested Qmax of nnn kWh.
274TERM_CONDSTD REMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
275TERM_CONDSTD REMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.