1DOCUMENT_POSITIONJOB TYPEMETER TYPESERVICE PRESSURESORT_ORDERTEXT
2CONT_SUMADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
3CONT_SUMADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
4CONT_SUMADVERSARIALDIAPHRAGMMP2excluding lifting gear changes
5CONT_SUMADVERSARIALROTARYLP1plus purging on time and materials basis.
6CONT_SUMADVERSARIALROTARYLP2excluding lifting gear changes
7CONT_SUMADVERSARIALROTARYMP1plus purging on time and materials basis.
8CONT_SUMADVERSARIALROTARYMP2excluding lifting gear changes
9CONT_SUMADVERSARIALTURBINELP1plus purging on time and materials basis.
10CONT_SUMADVERSARIALTURBINELP2excluding lifting gear changes
11CONT_SUMADVERSARIALTURBINEMP1plus purging on time and materials basis.
12CONT_SUMADVERSARIALTURBINEMP2excluding lifting gear changes
13CONT_SUMEXCHANGEDIAPHRAGMMP1excluding lifting gear changes
14CONT_SUMEXCHANGEROTARYLP1excluding lifting gear changes
15CONT_SUMEXCHANGEROTARYMP1excluding lifting gear changes
16CONT_SUMEXCHANGETURBINELP1excluding lifting gear changes
17CONT_SUMEXCHANGETURBINEMP1excluding lifting gear changes
18CONT_SUMINSTALLDIAPHRAGMMP1excluding lifting gear changes
19CONT_SUMINSTALLROTARYLP1excluding lifting gear changes
20CONT_SUMINSTALLROTARYMP1excluding lifting gear changes
21CONT_SUMINSTALLTURBINELP1excluding lifting gear changes
22CONT_SUMINSTALLTURBINEMP1excluding lifting gear changes
23CONT_SUMREMOVEDIAPHRAGMMP1plus purging on time and materials basis.
24CONT_SUMREMOVEDIAPHRAGMMP2excluding lifting gear changes
25CONT_SUMSTD EXCHANGEDIAPHRAGMMP1excluding lifting gear changes
26CONT_SUMSTD EXCHANGEROTARYLP1excluding lifting gear changes
27CONT_SUMSTD EXCHANGEROTARYMP1excluding lifting gear changes
28CONT_SUMSTD EXCHANGETURBINELP1excluding lifting gear changes
29CONT_SUMSTD EXCHANGETURBINEMP1excluding lifting gear changes
30CONT_SUMSTD INSTALLDIAPHRAGMMP1excluding lifting gear changes
31CONT_SUMSTD INSTALLROTARYLP1excluding lifting gear changes
32CONT_SUMSTD INSTALLROTARYMP1excluding lifting gear changes
33CONT_SUMSTD INSTALLTURBINELP1excluding lifting gear changes
34CONT_SUMSTD INSTALLTURBINEMP1excluding lifting gear changes
35CONT_SUM_QAADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
36CONT_SUM_QAADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
37CONT_SUM_QAADVERSARIALDIAPHRAGMMP2excluding lifting gear changes
38CONT_SUM_QAADVERSARIALROTARYLP1plus purging on time and materials basis.
39CONT_SUM_QAADVERSARIALROTARYLP2excluding lifting gear changes
40CONT_SUM_QAADVERSARIALROTARYMP1plus purging on time and materials basis.
41CONT_SUM_QAADVERSARIALROTARYMP2excluding lifting gear changes
42CONT_SUM_QAADVERSARIALTURBINELP1plus purging on time and materials basis.
43CONT_SUM_QAADVERSARIALTURBINELP2excluding lifting gear changes
44CONT_SUM_QAADVERSARIALTURBINEMP1plus purging on time and materials basis.
45CONT_SUM_QAADVERSARIALTURBINEMP2excluding lifting gear changes
46CONT_SUM_QAEXCHANGEDIAPHRAGMMP1excluding lifting gear changes
47CONT_SUM_QAEXCHANGEROTARYLP1excluding lifting gear changes
48CONT_SUM_QAEXCHANGEROTARYMP1excluding lifting gear changes
49CONT_SUM_QAEXCHANGETURBINELP1excluding lifting gear changes
50CONT_SUM_QAEXCHANGETURBINEMP1excluding lifting gear changes
51CONT_SUM_QAINSTALLDIAPHRAGMMP1excluding lifting gear changes
52CONT_SUM_QAINSTALLROTARYLP1excluding lifting gear changes
53CONT_SUM_QAINSTALLROTARYMP1excluding lifting gear changes
54CONT_SUM_QAINSTALLTURBINELP1excluding lifting gear changes
55CONT_SUM_QAINSTALLTURBINEMP1excluding lifting gear changes
56CONT_SUM_QAREMOVEDIAPHRAGMMP1plus purging on time and materials basis.
57CONT_SUM_QAREMOVEDIAPHRAGMMP2excluding lifting gear changes
58CONT_SUM_QASTD EXCHANGEDIAPHRAGMMP1excluding lifting gear changes
59CONT_SUM_QASTD EXCHANGEROTARYLP1excluding lifting gear changes
60CONT_SUM_QASTD EXCHANGEROTARYMP1excluding lifting gear changes
61CONT_SUM_QASTD EXCHANGETURBINELP1excluding lifting gear changes
62CONT_SUM_QASTD EXCHANGETURBINEMP1excluding lifting gear changes
63CONT_SUM_QASTD INSTALLDIAPHRAGMMP1excluding lifting gear changes
64CONT_SUM_QASTD INSTALLROTARYLP1excluding lifting gear changes
65CONT_SUM_QASTD INSTALLROTARYMP1excluding lifting gear changes
66CONT_SUM_QASTD INSTALLTURBINELP1excluding lifting gear changes
67CONT_SUM_QASTD INSTALLTURBINEMP1excluding lifting gear changes
68DESC_WORKADVERSARIALDIAPHRAGMLP1Purging of downstream pipework.
69DESC_WORKADVERSARIALDIAPHRAGMMP1Purging of downstream pipework.
70DESC_WORKADVERSARIALROTARYLP1Purging of downstream pipework.
71DESC_WORKADVERSARIALROTARYMP1Purging of downstream pipework.
72DESC_WORKADVERSARIALTURBINELP1Purging of downstream pipework.
73DESC_WORKADVERSARIALTURBINEMP1Purging of downstream pipework.
74DESC_WORKEXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
75DESC_WORKEXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
76DESC_WORKEXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
77DESC_WORKEXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
78DESC_WORKEXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
79DESC_WORKEXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
80DESC_WORKREMOVEDIAPHRAGMLP1Purging of downstream pipework.
81DESC_WORKREMOVEDIAPHRAGMMP1Purging of downstream pipework.
82DESC_WORKREMOVEROTARYLP1Purging of downstream pipework.
83DESC_WORKREMOVEROTARYLP2excluding lifting gear changes
84DESC_WORKREMOVEROTARYMP1Purging of downstream pipework.
85DESC_WORKREMOVEROTARYMP2excluding lifting gear changes
86DESC_WORKREMOVETURBINELP1Purging of downstream pipework.
87DESC_WORKREMOVETURBINELP2excluding lifting gear changes
88DESC_WORKREMOVETURBINEMP1Purging of downstream pipework.
89DESC_WORKREMOVETURBINEMP2excluding lifting gear changes
90DESC_WORKSTD EXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
91DESC_WORKSTD EXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
92DESC_WORKSTD EXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
93DESC_WORKSTD EXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
94DESC_WORKSTD EXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
95DESC_WORKSTD EXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
96TERM_CONDADDONDIAPHRAGMLP1This quotation is based on there being a working LF connection on the existing meter.
97TERM_CONDADDONDIAPHRAGMLP2This quotation does not include for the provision of a separate instrumentation cabinet.
98TERM_CONDADDONDIAPHRAGMLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
99TERM_CONDADDONDIAPHRAGMMP1This quotation is based on there being a working LF connection on the existing meter.
100TERM_CONDADDONDIAPHRAGMMP2This quotation does not include for the provision of a separate instrumentation cabinet.
101TERM_CONDADDONDIAPHRAGMMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
102TERM_CONDADDONROTARYLP1This quotation is based on there being a working LF connection on the existing meter.
103TERM_CONDADDONROTARYLP2This quotation does not include for the provision of a separate instrumentation cabinet.
104TERM_CONDADDONROTARYLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
105TERM_CONDADDONROTARYMP1This quotation is based on there being a working LF connection on the existing meter.
106TERM_CONDADDONROTARYMP2This quotation does not include for the provision of a separate instrumentation cabinet.
107TERM_CONDADDONROTARYMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
108TERM_CONDADDONTURBINELP1This quotation is based on there being a working LF connection on the existing meter.
109TERM_CONDADDONTURBINELP2This quotation does not include for the provision of a separate instrumentation cabinet.
110TERM_CONDADDONTURBINELP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
111TERM_CONDADDONTURBINEMP1This quotation is based on there being a working LF connection on the existing meter.
112TERM_CONDADDONTURBINEMP2This quotation does not include for the provision of a separate instrumentation cabinet.
113TERM_CONDADDONTURBINEMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
114TERM_CONDADVERSARIALDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
115TERM_CONDADVERSARIALDIAPHRAGMLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
116TERM_CONDADVERSARIALROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
117TERM_CONDADVERSARIALROTARYLP2Lifting gear if required will be charged at a rate of £400 per day.
118TERM_CONDADVERSARIALROTARYLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
119TERM_CONDADVERSARIALROTARYMP1Lifting gear if required will be charged at a rate of £400 per day.
120TERM_CONDADVERSARIALROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
121TERM_CONDADVERSARIALTURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
122TERM_CONDADVERSARIALTURBINELP2Lifting gear if required will be charged at a rate of £400 per day.
123TERM_CONDADVERSARIALTURBINELP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
124TERM_CONDADVERSARIALTURBINEMP1Lifting gear if required will be charged at a rate of £400 per day.
125TERM_CONDADVERSARIALTURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
126TERM_CONDEXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
127TERM_CONDEXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
128TERM_CONDEXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
129TERM_CONDEXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
130TERM_CONDEXCHANGEDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
131TERM_CONDEXCHANGEDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
132TERM_CONDEXCHANGEDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
133TERM_CONDEXCHANGEDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
134TERM_CONDEXCHANGEDIAPHRAGMLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
135TERM_CONDEXCHANGEDIAPHRAGMLP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
136TERM_CONDEXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
137TERM_CONDEXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
138TERM_CONDEXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
139TERM_CONDEXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
140TERM_CONDEXCHANGEDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
141TERM_CONDEXCHANGEDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
142TERM_CONDEXCHANGEDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
143TERM_CONDEXCHANGEDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144TERM_CONDEXCHANGEDIAPHRAGMMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
145TERM_CONDEXCHANGEDIAPHRAGMMP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
146TERM_CONDEXCHANGEDIAPHRAGMMP11Lifting gear if required will be charged at a rate of £400 per day.
147TERM_CONDEXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148TERM_CONDEXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149TERM_CONDEXCHANGEROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
150TERM_CONDEXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
151TERM_CONDEXCHANGEROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
152TERM_CONDEXCHANGEROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
153TERM_CONDEXCHANGEROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
154TERM_CONDEXCHANGEROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
155TERM_CONDEXCHANGEROTARYLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
156TERM_CONDEXCHANGEROTARYLP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
157TERM_CONDEXCHANGEROTARYLP11Lifting gear if required will be charged at a rate of £400 per day.
158TERM_CONDEXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
159TERM_CONDEXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
160TERM_CONDEXCHANGEROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
161TERM_CONDEXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
162TERM_CONDEXCHANGEROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
163TERM_CONDEXCHANGEROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
164TERM_CONDEXCHANGEROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
165TERM_CONDEXCHANGEROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166TERM_CONDEXCHANGEROTARYMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
167TERM_CONDEXCHANGEROTARYMP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168TERM_CONDEXCHANGEROTARYMP11Lifting gear if required will be charged at a rate of £400 per day.
169TERM_CONDEXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
170TERM_CONDEXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
171TERM_CONDEXCHANGETURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
172TERM_CONDEXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
173TERM_CONDEXCHANGETURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
174TERM_CONDEXCHANGETURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
175TERM_CONDEXCHANGETURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
176TERM_CONDEXCHANGETURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
177TERM_CONDEXCHANGETURBINELP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
178TERM_CONDEXCHANGETURBINELP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
179TERM_CONDEXCHANGETURBINELP11Lifting gear if required will be charged at a rate of £400 per day.
180TERM_CONDEXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
181TERM_CONDEXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
182TERM_CONDEXCHANGETURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
183TERM_CONDEXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
184TERM_CONDEXCHANGETURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
185TERM_CONDEXCHANGETURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
186TERM_CONDEXCHANGETURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
187TERM_CONDEXCHANGETURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
188TERM_CONDEXCHANGETURBINEMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
189TERM_CONDEXCHANGETURBINEMP10This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
190TERM_CONDEXCHANGETURBINEMP11Lifting gear if required will be charged at a rate of £400 per day.
191TERM_CONDINSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
192TERM_CONDINSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
193TERM_CONDINSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
194TERM_CONDINSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
195TERM_CONDINSTALLDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
196TERM_CONDINSTALLDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
197TERM_CONDINSTALLDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
198TERM_CONDINSTALLDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
199TERM_CONDINSTALLDIAPHRAGMLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
200TERM_CONDINSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
201TERM_CONDINSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
202TERM_CONDINSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
203TERM_CONDINSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
204TERM_CONDINSTALLDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
205TERM_CONDINSTALLDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
206TERM_CONDINSTALLDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
207TERM_CONDINSTALLDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
208TERM_CONDINSTALLDIAPHRAGMMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
209TERM_CONDINSTALLDIAPHRAGMMP10Lifting gear if required will be charged at a rate of £400 per day.
210TERM_CONDINSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211TERM_CONDINSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
212TERM_CONDINSTALLROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
213TERM_CONDINSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
214TERM_CONDINSTALLROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
215TERM_CONDINSTALLROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
216TERM_CONDINSTALLROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
217TERM_CONDINSTALLROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
218TERM_CONDINSTALLROTARYLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
219TERM_CONDINSTALLROTARYLP10Lifting gear if required will be charged at a rate of £400 per day.
220TERM_CONDINSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
221TERM_CONDINSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
222TERM_CONDINSTALLROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
223TERM_CONDINSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
224TERM_CONDINSTALLROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
225TERM_CONDINSTALLROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
226TERM_CONDINSTALLROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227TERM_CONDINSTALLROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228TERM_CONDINSTALLROTARYMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
229TERM_CONDINSTALLROTARYMP10Lifting gear if required will be charged at a rate of £400 per day.
230TERM_CONDINSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
231TERM_CONDINSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
232TERM_CONDINSTALLTURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
233TERM_CONDINSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
234TERM_CONDINSTALLTURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
235TERM_CONDINSTALLTURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
236TERM_CONDINSTALLTURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
237TERM_CONDINSTALLTURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
238TERM_CONDINSTALLTURBINELP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
239TERM_CONDINSTALLTURBINELP10Lifting gear if required will be charged at a rate of £400 per day.
240TERM_CONDINSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
241TERM_CONDINSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242TERM_CONDINSTALLTURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
243TERM_CONDINSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
244TERM_CONDINSTALLTURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
245TERM_CONDINSTALLTURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
246TERM_CONDINSTALLTURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
247TERM_CONDINSTALLTURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
248TERM_CONDINSTALLTURBINEMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
249TERM_CONDINSTALLTURBINEMP10Lifting gear if required will be charged at a rate of £400 per day.
250TERM_CONDOFMATDIAPHRAGMLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
251TERM_CONDOFMATDIAPHRAGMLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
252TERM_CONDOFMATDIAPHRAGMMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
253TERM_CONDOFMATDIAPHRAGMMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
254TERM_CONDOFMATROTARYLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
255TERM_CONDOFMATROTARYLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
256TERM_CONDOFMATROTARYMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
257TERM_CONDOFMATROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
258TERM_CONDOFMATTURBINELP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
259TERM_CONDOFMATTURBINELP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
260TERM_CONDOFMATTURBINEMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
261TERM_CONDOFMATTURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
262TERM_CONDREMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
263TERM_CONDREMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
264TERM_CONDREMOVEDIAPHRAGMLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
265TERM_CONDREMOVEDIAPHRAGMMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
266TERM_CONDREMOVEDIAPHRAGMMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
267TERM_CONDREMOVEDIAPHRAGMMP3Lifting gear if required will be charged at a rate of £400 per day.
268TERM_CONDREMOVEROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
269TERM_CONDREMOVEROTARYLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
270TERM_CONDREMOVEROTARYLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
271TERM_CONDREMOVEROTARYLP4Lifting gear if required will be charged at a rate of £400 per day.
272TERM_CONDREMOVEROTARYMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
273TERM_CONDREMOVEROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
274TERM_CONDREMOVEROTARYMP3Lifting gear if required will be charged at a rate of £400 per day.
275TERM_CONDREMOVETURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
276TERM_CONDREMOVETURBINELP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
277TERM_CONDREMOVETURBINELP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
278TERM_CONDREMOVETURBINELP4Lifting gear if required will be charged at a rate of £400 per day.
279TERM_CONDREMOVETURBINEMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280TERM_CONDREMOVETURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
281TERM_CONDREMOVETURBINEMP3Lifting gear if required will be charged at a rate of £400 per day.
282TERM_CONDSTD EXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
283TERM_CONDSTD EXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
284TERM_CONDSTD EXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
285TERM_CONDSTD EXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
286TERM_CONDSTD EXCHANGEDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
287TERM_CONDSTD EXCHANGEDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
288TERM_CONDSTD EXCHANGEDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
289TERM_CONDSTD EXCHANGEDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
290TERM_CONDSTD EXCHANGEDIAPHRAGMLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
291TERM_CONDSTD EXCHANGEDIAPHRAGMLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
292TERM_CONDSTD EXCHANGEDIAPHRAGMLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
293TERM_CONDSTD EXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
294TERM_CONDSTD EXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
295TERM_CONDSTD EXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
296TERM_CONDSTD EXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
297TERM_CONDSTD EXCHANGEDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
298TERM_CONDSTD EXCHANGEDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
299TERM_CONDSTD EXCHANGEDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
300TERM_CONDSTD EXCHANGEDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
301TERM_CONDSTD EXCHANGEDIAPHRAGMMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
302TERM_CONDSTD EXCHANGEDIAPHRAGMMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
303TERM_CONDSTD EXCHANGEDIAPHRAGMMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
304TERM_CONDSTD EXCHANGEDIAPHRAGMMP12Lifting gear if required will be charged at a rate of £400 per day.
305TERM_CONDSTD EXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
306TERM_CONDSTD EXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
307TERM_CONDSTD EXCHANGEROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
308TERM_CONDSTD EXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
309TERM_CONDSTD EXCHANGEROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
310TERM_CONDSTD EXCHANGEROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
311TERM_CONDSTD EXCHANGEROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
312TERM_CONDSTD EXCHANGEROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
313TERM_CONDSTD EXCHANGEROTARYLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
314TERM_CONDSTD EXCHANGEROTARYLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
315TERM_CONDSTD EXCHANGEROTARYLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
316TERM_CONDSTD EXCHANGEROTARYLP12Lifting gear if required will be charged at a rate of £400 per day.
317TERM_CONDSTD EXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
318TERM_CONDSTD EXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
319TERM_CONDSTD EXCHANGEROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
320TERM_CONDSTD EXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
321TERM_CONDSTD EXCHANGEROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
322TERM_CONDSTD EXCHANGEROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
323TERM_CONDSTD EXCHANGEROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
324TERM_CONDSTD EXCHANGEROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
325TERM_CONDSTD EXCHANGEROTARYMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
326TERM_CONDSTD EXCHANGEROTARYMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
327TERM_CONDSTD EXCHANGEROTARYMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
328TERM_CONDSTD EXCHANGEROTARYMP12Lifting gear if required will be charged at a rate of £400 per day.
329TERM_CONDSTD EXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
330TERM_CONDSTD EXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
331TERM_CONDSTD EXCHANGETURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
332TERM_CONDSTD EXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
333TERM_CONDSTD EXCHANGETURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
334TERM_CONDSTD EXCHANGETURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
335TERM_CONDSTD EXCHANGETURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
336TERM_CONDSTD EXCHANGETURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
337TERM_CONDSTD EXCHANGETURBINELP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
338TERM_CONDSTD EXCHANGETURBINELP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
339TERM_CONDSTD EXCHANGETURBINELP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
340TERM_CONDSTD EXCHANGETURBINELP12Lifting gear if required will be charged at a rate of £400 per day.
341TERM_CONDSTD EXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
342TERM_CONDSTD EXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
343TERM_CONDSTD EXCHANGETURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
344TERM_CONDSTD EXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
345TERM_CONDSTD EXCHANGETURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
346TERM_CONDSTD EXCHANGETURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
347TERM_CONDSTD EXCHANGETURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
348TERM_CONDSTD EXCHANGETURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
349TERM_CONDSTD EXCHANGETURBINEMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
350TERM_CONDSTD EXCHANGETURBINEMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
351TERM_CONDSTD EXCHANGETURBINEMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
352TERM_CONDSTD EXCHANGETURBINEMP12Lifting gear if required will be charged at a rate of £400 per day.
353TERM_CONDSTD INSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
354TERM_CONDSTD INSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
355TERM_CONDSTD INSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
356TERM_CONDSTD INSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
357TERM_CONDSTD INSTALLDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
358TERM_CONDSTD INSTALLDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
359TERM_CONDSTD INSTALLDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
360TERM_CONDSTD INSTALLDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
361TERM_CONDSTD INSTALLDIAPHRAGMLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
362TERM_CONDSTD INSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
363TERM_CONDSTD INSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
364TERM_CONDSTD INSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
365TERM_CONDSTD INSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
366TERM_CONDSTD INSTALLDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
367TERM_CONDSTD INSTALLDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
368TERM_CONDSTD INSTALLDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
369TERM_CONDSTD INSTALLDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
370TERM_CONDSTD INSTALLDIAPHRAGMMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
371TERM_CONDSTD INSTALLDIAPHRAGMMP10Lifting gear if required will be charged at a rate of £400 per day.
372TERM_CONDSTD INSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
373TERM_CONDSTD INSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
374TERM_CONDSTD INSTALLROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
375TERM_CONDSTD INSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
376TERM_CONDSTD INSTALLROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
377TERM_CONDSTD INSTALLROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
378TERM_CONDSTD INSTALLROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
379TERM_CONDSTD INSTALLROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
380TERM_CONDSTD INSTALLROTARYLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
381TERM_CONDSTD INSTALLROTARYLP10Lifting gear if required will be charged at a rate of £400 per day.
382TERM_CONDSTD INSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
383TERM_CONDSTD INSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
384TERM_CONDSTD INSTALLROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
385TERM_CONDSTD INSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
386TERM_CONDSTD INSTALLROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
387TERM_CONDSTD INSTALLROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
388TERM_CONDSTD INSTALLROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
389TERM_CONDSTD INSTALLROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
390TERM_CONDSTD INSTALLROTARYMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
391TERM_CONDSTD INSTALLROTARYMP10Lifting gear if required will be charged at a rate of £400 per day.
392TERM_CONDSTD INSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
393TERM_CONDSTD INSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
394TERM_CONDSTD INSTALLTURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
395TERM_CONDSTD INSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
396TERM_CONDSTD INSTALLTURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
397TERM_CONDSTD INSTALLTURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
398TERM_CONDSTD INSTALLTURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
399TERM_CONDSTD INSTALLTURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
400TERM_CONDSTD INSTALLTURBINELP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
401TERM_CONDSTD INSTALLTURBINELP10Lifting gear if required will be charged at a rate of £400 per day.
402TERM_CONDSTD INSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
403TERM_CONDSTD INSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
404TERM_CONDSTD INSTALLTURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
405TERM_CONDSTD INSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
406TERM_CONDSTD INSTALLTURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
407TERM_CONDSTD INSTALLTURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
408TERM_CONDSTD INSTALLTURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
409TERM_CONDSTD INSTALLTURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
410TERM_CONDSTD INSTALLTURBINEMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
411TERM_CONDSTD INSTALLTURBINEMP10Lifting gear if required will be charged at a rate of £400 per day.
412CONT_SUMSTD REMOVEDIAPHRAGMMP1plus purging on time and materials basis.
413CONT_SUMSTD REMOVEDIAPHRAGMMP2excluding lifting gear changes
414CONT_SUM_QASTD REMOVEDIAPHRAGMMP1plus purging on time and materials basis.
415CONT_SUM_QASTD REMOVEDIAPHRAGMMP2excluding lifting gear changes
416DESC_WORKSTD REMOVEDIAPHRAGMLP1Purging of downstream pipework.
417DESC_WORKSTD REMOVEDIAPHRAGMMP1Purging of downstream pipework.
418DESC_WORKSTD REMOVEROTARYLP1Purging of downstream pipework.
419DESC_WORKSTD REMOVEROTARYLP2excluding lifting gear changes
420DESC_WORKSTD REMOVEROTARYMP1Purging of downstream pipework.
421DESC_WORKSTD REMOVEROTARYMP2excluding lifting gear changes
422DESC_WORKSTD REMOVETURBINELP1Purging of downstream pipework.
423DESC_WORKSTD REMOVETURBINELP2excluding lifting gear changes
424DESC_WORKSTD REMOVETURBINEMP1Purging of downstream pipework.
425DESC_WORKSTD REMOVETURBINEMP2excluding lifting gear changes
426TERM_CONDSTD REMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
427TERM_CONDSTD REMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
428TERM_CONDSTD REMOVEDIAPHRAGMLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
429TERM_CONDSTD REMOVEDIAPHRAGMMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
430TERM_CONDSTD REMOVEDIAPHRAGMMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
431TERM_CONDSTD REMOVEDIAPHRAGMMP3Lifting gear if required will be charged at a rate of £400 per day.
432TERM_CONDSTD REMOVEROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
433TERM_CONDSTD REMOVEROTARYLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
434TERM_CONDSTD REMOVEROTARYLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
435TERM_CONDSTD REMOVEROTARYLP4Lifting gear if required will be charged at a rate of £400 per day.
436TERM_CONDSTD REMOVEROTARYMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
437TERM_CONDSTD REMOVEROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
438TERM_CONDSTD REMOVEROTARYMP3Lifting gear if required will be charged at a rate of £400 per day.
439TERM_CONDSTD REMOVETURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
440TERM_CONDSTD REMOVETURBINELP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
441TERM_CONDSTD REMOVETURBINELP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
442TERM_CONDSTD REMOVETURBINELP4Lifting gear if required will be charged at a rate of £400 per day.
443TERM_CONDSTD REMOVETURBINEMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
444TERM_CONDSTD REMOVETURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
445TERM_CONDSTD REMOVETURBINEMP3Lifting gear if required will be charged at a rate of £400 per day.