1DOCUMENT_POSITIONJOB TYPEMETER TYPESERVICE PRESSURESORT_ORDERTEXT
2CONT_SUMADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
3CONT_SUMADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
4CONT_SUMADVERSARIALROTARYLP1excluding lifting gear changes
5CONT_SUMADVERSARIALROTARYLP2plus purging on time and materials basis.
6CONT_SUMADVERSARIALROTARYMP1excluding lifting gear changes
7CONT_SUMADVERSARIALROTARYMP2plus purging on time and materials basis.
8CONT_SUMADVERSARIALTURBINELP1excluding lifting gear changes
9CONT_SUMADVERSARIALTURBINELP2plus purging on time and materials basis.
10CONT_SUMADVERSARIALTURBINEMP1excluding lifting gear changes
11CONT_SUMADVERSARIALTURBINEMP2plus purging on time and materials basis.
12CONT_SUMSTD REMOVEDIAPHRAGMLP1plus purging on time and materials basis.
13CONT_SUM_QAADVERSARIALDIAPHRAGMLP1plus purging on time and materials basis.
14CONT_SUM_QAADVERSARIALDIAPHRAGMMP1plus purging on time and materials basis.
15CONT_SUM_QAADVERSARIALROTARYLP1plus purging on time and materials basis.
16CONT_SUM_QAADVERSARIALROTARYMP1plus purging on time and materials basis.
17CONT_SUM_QAADVERSARIALTURBINELP1plus purging on time and materials basis.
18CONT_SUM_QAADVERSARIALTURBINEMP1plus purging on time and materials basis.
19CONT_SUM_QASTD REMOVEDIAPHRAGMLP1plus purging on time and materials basis.
20DESC_WORKADVERSARIALDIAPHRAGMLP1Purging of downstream pipework.
21DESC_WORKADVERSARIALDIAPHRAGMMP1Purging of downstream pipework.
22DESC_WORKADVERSARIALROTARYLP1Purging of downstream pipework.
23DESC_WORKADVERSARIALROTARYMP1Purging of downstream pipework.
24DESC_WORKADVERSARIALTURBINELP1Purging of downstream pipework.
25DESC_WORKADVERSARIALTURBINEMP1Purging of downstream pipework.
26DESC_WORKEXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27DESC_WORKEXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28DESC_WORKEXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29DESC_WORKEXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30DESC_WORKEXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31DESC_WORKEXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32DESC_WORKREMOVEDIAPHRAGMLP1Purging of downstream pipework.
33DESC_WORKREMOVEDIAPHRAGMMP1Purging of downstream pipework.
34DESC_WORKREMOVEROTARYLP1Purging of downstream pipework.
35DESC_WORKREMOVEROTARYMP1Purging of downstream pipework.
36DESC_WORKREMOVETURBINELP1Purging of downstream pipework.
37DESC_WORKREMOVETURBINEMP1Purging of downstream pipework.
38DESC_WORKSTD EXCHANGEDIAPHRAGMLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39DESC_WORKSTD EXCHANGEDIAPHRAGMMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40DESC_WORKSTD EXCHANGEROTARYLP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41DESC_WORKSTD EXCHANGEROTARYMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42DESC_WORKSTD EXCHANGETURBINELP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43DESC_WORKSTD EXCHANGETURBINEMP1Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44DESC_WORKSTD REMOVEDIAPHRAGMLP1Purging of downstream pipework.
45TERM_CONDADDONDIAPHRAGMLP1This quotation is based on there being a working LF connection on the existing meter.
46TERM_CONDADDONDIAPHRAGMLP2This quotation does not include for the provision of a separate instrumentation cabinet.
47TERM_CONDADDONDIAPHRAGMLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
48TERM_CONDADDONDIAPHRAGMMP1This quotation is based on there being a working LF connection on the existing meter.
49TERM_CONDADDONDIAPHRAGMMP2This quotation does not include for the provision of a separate instrumentation cabinet.
50TERM_CONDADDONDIAPHRAGMMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
51TERM_CONDADDONROTARYLP1This quotation is based on there being a working LF connection on the existing meter.
52TERM_CONDADDONROTARYLP2This quotation does not include for the provision of a separate instrumentation cabinet.
53TERM_CONDADDONROTARYLP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54TERM_CONDADDONROTARYMP1This quotation is based on there being a working LF connection on the existing meter.
55TERM_CONDADDONROTARYMP2This quotation does not include for the provision of a separate instrumentation cabinet.
56TERM_CONDADDONROTARYMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
57TERM_CONDADDONTURBINELP1This quotation is based on there being a working LF connection on the existing meter.
58TERM_CONDADDONTURBINELP2This quotation does not include for the provision of a separate instrumentation cabinet.
59TERM_CONDADDONTURBINELP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
60TERM_CONDADDONTURBINEMP1This quotation is based on there being a working LF connection on the existing meter.
61TERM_CONDADDONTURBINEMP2This quotation does not include for the provision of a separate instrumentation cabinet.
62TERM_CONDADDONTURBINEMP3Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63TERM_CONDADVERSARIALDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64TERM_CONDADVERSARIALDIAPHRAGMLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
65TERM_CONDADVERSARIALROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
66TERM_CONDADVERSARIALROTARYLP2Lifting gear if required will be charged at a rate of £400 per day.
67TERM_CONDADVERSARIALROTARYLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
68TERM_CONDADVERSARIALROTARYMP1Lifting gear if required will be charged at a rate of £400 per day.
69TERM_CONDADVERSARIALROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
70TERM_CONDADVERSARIALTURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
71TERM_CONDADVERSARIALTURBINELP2Lifting gear if required will be charged at a rate of £400 per day.
72TERM_CONDADVERSARIALTURBINELP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
73TERM_CONDADVERSARIALTURBINEMP1Lifting gear if required will be charged at a rate of £400 per day.
74TERM_CONDADVERSARIALTURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
75TERM_CONDEXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
76TERM_CONDEXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
77TERM_CONDEXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
78TERM_CONDEXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
79TERM_CONDEXCHANGEDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
80TERM_CONDEXCHANGEDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
81TERM_CONDEXCHANGEDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
82TERM_CONDEXCHANGEDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
83TERM_CONDEXCHANGEDIAPHRAGMLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
84TERM_CONDEXCHANGEDIAPHRAGMLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
85TERM_CONDEXCHANGEDIAPHRAGMLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
86TERM_CONDEXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
87TERM_CONDEXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
88TERM_CONDEXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
89TERM_CONDEXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
90TERM_CONDEXCHANGEDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
91TERM_CONDEXCHANGEDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
92TERM_CONDEXCHANGEDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
93TERM_CONDEXCHANGEDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
94TERM_CONDEXCHANGEDIAPHRAGMMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
95TERM_CONDEXCHANGEDIAPHRAGMMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96TERM_CONDEXCHANGEDIAPHRAGMMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
97TERM_CONDEXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98TERM_CONDEXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
99TERM_CONDEXCHANGEROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
100TERM_CONDEXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
101TERM_CONDEXCHANGEROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
102TERM_CONDEXCHANGEROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
103TERM_CONDEXCHANGEROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
104TERM_CONDEXCHANGEROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
105TERM_CONDEXCHANGEROTARYLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
106TERM_CONDEXCHANGEROTARYLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
107TERM_CONDEXCHANGEROTARYLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
108TERM_CONDEXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
109TERM_CONDEXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
110TERM_CONDEXCHANGEROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
111TERM_CONDEXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
112TERM_CONDEXCHANGEROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
113TERM_CONDEXCHANGEROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
114TERM_CONDEXCHANGEROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115TERM_CONDEXCHANGEROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116TERM_CONDEXCHANGEROTARYMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
117TERM_CONDEXCHANGEROTARYMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
118TERM_CONDEXCHANGEROTARYMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
119TERM_CONDEXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
120TERM_CONDEXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
121TERM_CONDEXCHANGETURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
122TERM_CONDEXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
123TERM_CONDEXCHANGETURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
124TERM_CONDEXCHANGETURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
125TERM_CONDEXCHANGETURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126TERM_CONDEXCHANGETURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
127TERM_CONDEXCHANGETURBINELP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
128TERM_CONDEXCHANGETURBINELP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
129TERM_CONDEXCHANGETURBINELP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
130TERM_CONDEXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
131TERM_CONDEXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
132TERM_CONDEXCHANGETURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133TERM_CONDEXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
134TERM_CONDEXCHANGETURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
135TERM_CONDEXCHANGETURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
136TERM_CONDEXCHANGETURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
137TERM_CONDEXCHANGETURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
138TERM_CONDEXCHANGETURBINEMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
139TERM_CONDEXCHANGETURBINEMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
140TERM_CONDEXCHANGETURBINEMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
141TERM_CONDINSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
142TERM_CONDINSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
143TERM_CONDINSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
144TERM_CONDINSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
145TERM_CONDINSTALLDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
146TERM_CONDINSTALLDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
147TERM_CONDINSTALLDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
148TERM_CONDINSTALLDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
149TERM_CONDINSTALLDIAPHRAGMLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
150TERM_CONDINSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
151TERM_CONDINSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
152TERM_CONDINSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153TERM_CONDINSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
154TERM_CONDINSTALLDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
155TERM_CONDINSTALLDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
156TERM_CONDINSTALLDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
157TERM_CONDINSTALLDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
158TERM_CONDINSTALLDIAPHRAGMMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
159TERM_CONDINSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
160TERM_CONDINSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
161TERM_CONDINSTALLROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
162TERM_CONDINSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
163TERM_CONDINSTALLROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
164TERM_CONDINSTALLROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
165TERM_CONDINSTALLROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
166TERM_CONDINSTALLROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
167TERM_CONDINSTALLROTARYLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168TERM_CONDINSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
169TERM_CONDINSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
170TERM_CONDINSTALLROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
171TERM_CONDINSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
172TERM_CONDINSTALLROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
173TERM_CONDINSTALLROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
174TERM_CONDINSTALLROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
175TERM_CONDINSTALLROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
176TERM_CONDINSTALLROTARYMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
177TERM_CONDINSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
178TERM_CONDINSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
179TERM_CONDINSTALLTURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
180TERM_CONDINSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
181TERM_CONDINSTALLTURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
182TERM_CONDINSTALLTURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
183TERM_CONDINSTALLTURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
184TERM_CONDINSTALLTURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
185TERM_CONDINSTALLTURBINELP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
186TERM_CONDINSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
187TERM_CONDINSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188TERM_CONDINSTALLTURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189TERM_CONDINSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
190TERM_CONDINSTALLTURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
191TERM_CONDINSTALLTURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
192TERM_CONDINSTALLTURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
193TERM_CONDINSTALLTURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
194TERM_CONDINSTALLTURBINEMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
195TERM_CONDOFMATDIAPHRAGMLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
196TERM_CONDOFMATDIAPHRAGMLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
197TERM_CONDOFMATDIAPHRAGMMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
198TERM_CONDOFMATDIAPHRAGMMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
199TERM_CONDOFMATROTARYLP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
200TERM_CONDOFMATROTARYLP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
201TERM_CONDOFMATROTARYMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
202TERM_CONDOFMATROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
203TERM_CONDOFMATTURBINELP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
204TERM_CONDOFMATTURBINELP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
205TERM_CONDOFMATTURBINEMP1This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
206TERM_CONDOFMATTURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
207TERM_CONDREMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
208TERM_CONDREMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
209TERM_CONDREMOVEDIAPHRAGMLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
210TERM_CONDREMOVEDIAPHRAGMMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
211TERM_CONDREMOVEDIAPHRAGMMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
212TERM_CONDREMOVEROTARYLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
213TERM_CONDREMOVEROTARYLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
214TERM_CONDREMOVEROTARYLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
215TERM_CONDREMOVEROTARYMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
216TERM_CONDREMOVEROTARYMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
217TERM_CONDREMOVETURBINELP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
218TERM_CONDREMOVETURBINELP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
219TERM_CONDREMOVETURBINELP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
220TERM_CONDREMOVETURBINEMP1Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
221TERM_CONDREMOVETURBINEMP2This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
222TERM_CONDSTD EXCHANGEDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
223TERM_CONDSTD EXCHANGEDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
224TERM_CONDSTD EXCHANGEDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
225TERM_CONDSTD EXCHANGEDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
226TERM_CONDSTD EXCHANGEDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
227TERM_CONDSTD EXCHANGEDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
228TERM_CONDSTD EXCHANGEDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
229TERM_CONDSTD EXCHANGEDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230TERM_CONDSTD EXCHANGEDIAPHRAGMLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231TERM_CONDSTD EXCHANGEDIAPHRAGMLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
232TERM_CONDSTD EXCHANGEDIAPHRAGMLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
233TERM_CONDSTD EXCHANGEDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
234TERM_CONDSTD EXCHANGEDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
235TERM_CONDSTD EXCHANGEDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236TERM_CONDSTD EXCHANGEDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
237TERM_CONDSTD EXCHANGEDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
238TERM_CONDSTD EXCHANGEDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
239TERM_CONDSTD EXCHANGEDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
240TERM_CONDSTD EXCHANGEDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
241TERM_CONDSTD EXCHANGEDIAPHRAGMMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
242TERM_CONDSTD EXCHANGEDIAPHRAGMMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
243TERM_CONDSTD EXCHANGEDIAPHRAGMMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
244TERM_CONDSTD EXCHANGEROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
245TERM_CONDSTD EXCHANGEROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
246TERM_CONDSTD EXCHANGEROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
247TERM_CONDSTD EXCHANGEROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248TERM_CONDSTD EXCHANGEROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
249TERM_CONDSTD EXCHANGEROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
250TERM_CONDSTD EXCHANGEROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
251TERM_CONDSTD EXCHANGEROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
252TERM_CONDSTD EXCHANGEROTARYLP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
253TERM_CONDSTD EXCHANGEROTARYLP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
254TERM_CONDSTD EXCHANGEROTARYLP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
255TERM_CONDSTD EXCHANGEROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
256TERM_CONDSTD EXCHANGEROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
257TERM_CONDSTD EXCHANGEROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
258TERM_CONDSTD EXCHANGEROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
259TERM_CONDSTD EXCHANGEROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
260TERM_CONDSTD EXCHANGEROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
261TERM_CONDSTD EXCHANGEROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
262TERM_CONDSTD EXCHANGEROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
263TERM_CONDSTD EXCHANGEROTARYMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
264TERM_CONDSTD EXCHANGEROTARYMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
265TERM_CONDSTD EXCHANGEROTARYMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
266TERM_CONDSTD EXCHANGETURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
267TERM_CONDSTD EXCHANGETURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
268TERM_CONDSTD EXCHANGETURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
269TERM_CONDSTD EXCHANGETURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
270TERM_CONDSTD EXCHANGETURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
271TERM_CONDSTD EXCHANGETURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
272TERM_CONDSTD EXCHANGETURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273TERM_CONDSTD EXCHANGETURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
274TERM_CONDSTD EXCHANGETURBINELP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
275TERM_CONDSTD EXCHANGETURBINELP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
276TERM_CONDSTD EXCHANGETURBINELP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
277TERM_CONDSTD EXCHANGETURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
278TERM_CONDSTD EXCHANGETURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
279TERM_CONDSTD EXCHANGETURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
280TERM_CONDSTD EXCHANGETURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
281TERM_CONDSTD EXCHANGETURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
282TERM_CONDSTD EXCHANGETURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
283TERM_CONDSTD EXCHANGETURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
284TERM_CONDSTD EXCHANGETURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
285TERM_CONDSTD EXCHANGETURBINEMP9This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
286TERM_CONDSTD EXCHANGETURBINEMP10Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
287TERM_CONDSTD EXCHANGETURBINEMP11This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
288TERM_CONDSTD INSTALLDIAPHRAGMLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
289TERM_CONDSTD INSTALLDIAPHRAGMLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
290TERM_CONDSTD INSTALLDIAPHRAGMLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
291TERM_CONDSTD INSTALLDIAPHRAGMLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
292TERM_CONDSTD INSTALLDIAPHRAGMLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
293TERM_CONDSTD INSTALLDIAPHRAGMLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
294TERM_CONDSTD INSTALLDIAPHRAGMLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
295TERM_CONDSTD INSTALLDIAPHRAGMLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
296TERM_CONDSTD INSTALLDIAPHRAGMLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
297TERM_CONDSTD INSTALLDIAPHRAGMMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
298TERM_CONDSTD INSTALLDIAPHRAGMMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
299TERM_CONDSTD INSTALLDIAPHRAGMMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
300TERM_CONDSTD INSTALLDIAPHRAGMMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
301TERM_CONDSTD INSTALLDIAPHRAGMMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
302TERM_CONDSTD INSTALLDIAPHRAGMMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
303TERM_CONDSTD INSTALLDIAPHRAGMMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
304TERM_CONDSTD INSTALLDIAPHRAGMMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
305TERM_CONDSTD INSTALLDIAPHRAGMMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
306TERM_CONDSTD INSTALLROTARYLP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
307TERM_CONDSTD INSTALLROTARYLP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
308TERM_CONDSTD INSTALLROTARYLP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
309TERM_CONDSTD INSTALLROTARYLP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
310TERM_CONDSTD INSTALLROTARYLP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
311TERM_CONDSTD INSTALLROTARYLP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
312TERM_CONDSTD INSTALLROTARYLP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
313TERM_CONDSTD INSTALLROTARYLP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
314TERM_CONDSTD INSTALLROTARYLP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
315TERM_CONDSTD INSTALLROTARYMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
316TERM_CONDSTD INSTALLROTARYMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
317TERM_CONDSTD INSTALLROTARYMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
318TERM_CONDSTD INSTALLROTARYMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
319TERM_CONDSTD INSTALLROTARYMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
320TERM_CONDSTD INSTALLROTARYMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
321TERM_CONDSTD INSTALLROTARYMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
322TERM_CONDSTD INSTALLROTARYMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
323TERM_CONDSTD INSTALLROTARYMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
324TERM_CONDSTD INSTALLTURBINELP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
325TERM_CONDSTD INSTALLTURBINELP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
326TERM_CONDSTD INSTALLTURBINELP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
327TERM_CONDSTD INSTALLTURBINELP4The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
328TERM_CONDSTD INSTALLTURBINELP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
329TERM_CONDSTD INSTALLTURBINELP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
330TERM_CONDSTD INSTALLTURBINELP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
331TERM_CONDSTD INSTALLTURBINELP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
332TERM_CONDSTD INSTALLTURBINELP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
333TERM_CONDSTD INSTALLTURBINEMP1Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
334TERM_CONDSTD INSTALLTURBINEMP2Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
335TERM_CONDSTD INSTALLTURBINEMP3Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
336TERM_CONDSTD INSTALLTURBINEMP4The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
337TERM_CONDSTD INSTALLTURBINEMP5This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
338TERM_CONDSTD INSTALLTURBINEMP6The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
339TERM_CONDSTD INSTALLTURBINEMP7It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
340TERM_CONDSTD INSTALLTURBINEMP8The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
341TERM_CONDSTD INSTALLTURBINEMP9This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
342TERM_CONDSTD REMOVEDIAPHRAGMLP1This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
343TERM_CONDSTD REMOVEDIAPHRAGMLP2Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
344TERM_CONDSTD REMOVEDIAPHRAGMLP3This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted