\section{System Scope}
|
|
The primary objective of the system is to allow Agents to submit
|
|
enquiries for meter related works and services without the involvement
|
|
of I\&C staff. The secondary objective is to produce one or more meter
|
|
work quotations to satisfy each submitted enquiry, again without the
|
|
involvement of I\&C staff, and make these quotations available to the
|
|
Agents for acceptance.
|
|
|
|
The scope boundary for the system can be defined via the work
|
|
flow required. The scope starts once an enquiry is initiated and ends
|
|
once the provided quote has been accepted, rejected or lapsed (after 90
|
|
days).
|
|
|
|
\subsection{Within Scope}
|
|
The following stated requirements are listed as in scope and will
|
|
facilitate the functions and operation of the webMIP system.
|
|
|
|
\begin{enumerate}
|
|
\item Collect enquiry details for meter related works in the form of a
|
|
questionnaire completed by a registered webMIP user (see Appendix \ref{sec:AppendixDataItems}).
|
|
The meter related works details collected are limited to the
|
|
following job types:
|
|
|
|
\begin{enumerate}
|
|
\item Installation of new meters;
|
|
\item Request for OFGEM Meter Accuracy Test (OFMAT);
|
|
\item Exchange of meters;
|
|
\item Removal of meters, including
|
|
{\textquotesingle}Adversarial{\textquotesingle} removal of meters;
|
|
\item Relocation of meters;
|
|
\item Purchase of Automatic Meter Reader (AMR) and/or Energy Management System (EMS) for an existing meter module.
|
|
\end{enumerate}
|
|
|
|
\item Facility to upload documents relating to an enquiry. Maximum
|
|
size of file 3 megabytes, maximum size of files relating to an enquiry
|
|
10 megabytes.
|
|
\item The facility to download files stored within the system.
|
|
\item A bulk upload process with simple validation that will allow users
|
|
to upload system data items into webMIP.
|
|
\item The ability to provide an automatic quotation for enquiries that
|
|
meet the correct requirements (see Automatic quotation scope below).
|
|
\item Provide the facility for specific I\&C users to upload a manual
|
|
quotation for enquiries that webMIP is unable to produce and automatic
|
|
quotation.
|
|
\item To provide the facility for users to accept/reject manually
|
|
uploaded and automatically created quotations via a web browser.
|
|
\item To scan uploaded files for viruses and malicious content and
|
|
remove offending files
|
|
\end{enumerate}
|
|
|
|
\subsubsection{Automatic quotation scope}
|
|
The rules in Figure \ref{fig:AutomaticOrManualFlowChart1} (page \pageref{fig:AutomaticOrManualFlowChart1}) show the
|
|
scope for the production of automatic or manual quotations. In addition
|
|
to these rules, works where there are no meter modules, housings, etc.
|
|
known to the system that meet the requirements of the submitted enquiry
|
|
will result in a manual quotation.
|
|
|
|
\subsubsection{Manual quotation scope}
|
|
Where the system is unable to produce a quotation, the system provides
|
|
automatic emails to I\&C and appropriate agent users, informing them
|
|
that this is the case. The system supports a manual process of
|
|
uploading a quotation document generated off{}-line and making it
|
|
available to the third{}-party. The system has no knowledge of the
|
|
contents of the manual quotation.
|
|
|
|
\subsubsection{Communication scope}
|
|
The system will provide communication in the form of email and web
|
|
page requests. The system will send email to users of the system,
|
|
these emails may where appropriate include system generated
|
|
attachments. The system will be capable of emailing quotes to users
|
|
where appropriate.
|
|
|
|
\subsection{Out of Scope}
|
|
The system will not provide the following functions or requirements that
|
|
are deemed to be beyond the scope of the system at this point in time.
|
|
|
|
\begin{enumerate}
|
|
\item Where the third{}-party requires communications to be via
|
|
telephone, fax or the post this is performed manually by I\&C staff and
|
|
not by the webMIP system;
|
|
\item Managing Procurement, Planning Scheduling and Despatch activities
|
|
for the I\&C value chain;
|
|
\item Any changes to off{}-line systems required to accommodate
|
|
on{}-line quotations;
|
|
\item Any changes required to SAP Blueprint in order to accommodate
|
|
on{}-line quotations solution;
|
|
\item Automated interface to any of the existing systems/off{}-line
|
|
databases;
|
|
\item Tracking of the processes used to generate manual quotations;
|
|
\item Production of {\textquotesingle}ad{}-hoc{\textquotesingle}
|
|
management information reports;
|
|
\item Management of customer queries and complaints;
|
|
\item Management of any variations that occur on accepted quotations;
|
|
\item Supplier specific end customer uplifts for quotation pricing;
|
|
\item Supplier specific, end customer customised quotations with letter
|
|
heads;
|
|
\item Manage supplier acceptance of quotations where the method of acceptance occurs outside of the system e.g. through telephone, email, fax, etc.;
|
|
\item Manage quotation preparation for jobs handled manually;
|
|
\item Quotation generation for jobs received via supplier sent bulk .CSV
|
|
files;
|
|
\item Automatic generation of quotations deemed as bespoke or
|
|
non{}-standard;
|
|
\item Facility to validate quotation details and pricing provided by SAP
|
|
Blueprint.
|
|
|
|