Modified mip_bulk_load.pck to convert '"' to 'inch' in meter size codes imported from LABOUR_COSTS.csv.
git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@3527 248e525c-4dfb-0310-94bc-949c084e9493
CONT_SUM,ADVERSARIAL,ROTARY,MP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,MP,2,plus purging on time and materials basis.
CONT_SUM,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,STD EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
TERM_COND,ADDON,DIAPHRAGM,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,ADVERSARIAL,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND,EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,OFMAT,DIAPHRAGM,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,REMOVE,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
TERM_COND,REMOVE,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,DIAPHRAGM,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,STD EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
TERM_COND,STD EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,STD REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
EXCHANGE
DIAPHRAGM
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
EXCHANGE
DIAPHRAGM
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
TURBINE
LP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
ROTARY
LP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
ROTARY
MP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
DIAPHRAGM
MP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
TURBINE
MP
1
Purging of downstream pipework.
DESC_WORK
STD EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD EXCHANGE
DIAPHRAGM
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD EXCHANGE
ROTARY
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD EXCHANGE
DIAPHRAGM
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
TERM_COND
ADDON
DIAPHRAGM
LP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
TURBINE
LP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
ROTARY
LP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
DIAPHRAGM
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
TURBINE
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
ROTARY
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
TURBINE
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
ROTARY
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
DIAPHRAGM
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
DIAPHRAGM
MP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
ROTARY
MP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
TURBINE
MP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
ROTARY
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
DIAPHRAGM
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
TURBINE
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
DIAPHRAGM
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
ROTARY
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
TURBINE
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADVERSARIAL
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
ADVERSARIAL
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
3
TERM_CONDCONT_SUM
ADVERSARIAL
ROTARYDIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.plus purging on time and materials basis.
4
TERM_CONDCONT_SUM
ADVERSARIAL
TURBINEROTARY
LP
21
Lifting gear if required will be charged at a rate of 400 per day.excluding lifting gear changes
5
TERM_CONDCONT_SUM
ADVERSARIAL
ROTARYTURBINE
LP
2
Lifting gear if required will be charged at a rate of 400 per day.plus purging on time and materials basis.
TERM_COND
ADVERSARIAL
ROTARY
MP
1
Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND
ADVERSARIAL
TURBINE
MP
1
Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND
EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND
EXCHANGE
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
TURBINE
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
ROTARY
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
TURBINE
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
ROTARY
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
TURBINE
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
ROTARY
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
EXCHANGE
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
ROTARY
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
TURBINE
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
ROTARY
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
TURBINE
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
INSTALL
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
DIAPHRAGM
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
ROTARY
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
OFMAT
DIAPHRAGM
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
ROTARY
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
TURBINE
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
DIAPHRAGM
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
ROTARY
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
TURBINE
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
REMOVE
ROTARY
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
DIAPHRAGM
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
ROTARY
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
DIAPHRAGM
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
ROTARY
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
TURBINE
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
STD EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD EXCHANGE
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
STD EXCHANGE
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
6
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
DIAPHRAGMROTARY
LP
62
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.plus purging on time and materials basis.
7
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
TURBINEDIAPHRAGM
LPMP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.plus purging on time and materials basis.
8
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
DIAPHRAGMROTARY
LPMP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.excluding lifting gear changes
9
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
ROTARYTURBINE
LPMP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.excluding lifting gear changes
10
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
ROTARY
LPMP
82
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.plus purging on time and materials basis.
11
TERM_CONDCONT_SUM
STD EXCHANGEADVERSARIAL
TURBINE
LPMP
82
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.plus purging on time and materials basis.
12
TERM_CONDCONT_SUM
STD EXCHANGESTD REMOVE
DIAPHRAGM
LP
81
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.plus purging on time and materials basis.
13
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
ROTARY
LP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.plus purging on time and materials basis.
14
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
DIAPHRAGM
LP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.plus purging on time and materials basis.
15
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
TURBINE
LP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.plus purging on time and materials basis.
16
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
ROTARYTURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.plus purging on time and materials basis.
17
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
TURBINEDIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.plus purging on time and materials basis.
18
TERM_CONDCONT_SUM_QA
STD EXCHANGEADVERSARIAL
DIAPHRAGMROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.plus purging on time and materials basis.
19
TERM_CONDCONT_SUM_QA
STD EXCHANGESTD REMOVE
TURBINEDIAPHRAGM
MPLP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.plus purging on time and materials basis.
20
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
ROTARYDIAPHRAGM
MPLP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Purging of downstream pipework.
21
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
DIAPHRAGMTURBINE
MPLP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Purging of downstream pipework.
22
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
DIAPHRAGMROTARY
MPLP
31
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.Purging of downstream pipework.
23
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
ROTARYDIAPHRAGM
MP
31
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.Purging of downstream pipework.
24
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
TURBINEROTARY
MP
31
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.Purging of downstream pipework.
25
TERM_CONDDESC_WORK
STD EXCHANGEADVERSARIAL
TURBINE
MP
41
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.Purging of downstream pipework.
26
TERM_CONDDESC_WORK
STD EXCHANGEEXCHANGE
DIAPHRAGMROTARY
MPLP
41
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27
TERM_CONDDESC_WORK
STD EXCHANGEEXCHANGE
ROTARYDIAPHRAGM
MPLP
41
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28
DESC_WORK
EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29
DESC_WORK
EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30
DESC_WORK
EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31
DESC_WORK
EXCHANGE
DIAPHRAGM
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32
DESC_WORK
REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
33
DESC_WORK
REMOVE
TURBINE
LP
1
Purging of downstream pipework.
34
DESC_WORK
REMOVE
ROTARY
LP
1
Purging of downstream pipework.
35
DESC_WORK
REMOVE
ROTARY
MP
1
Purging of downstream pipework.
36
DESC_WORK
REMOVE
DIAPHRAGM
MP
1
Purging of downstream pipework.
37
DESC_WORK
REMOVE
TURBINE
MP
1
Purging of downstream pipework.
38
DESC_WORK
STD EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39
DESC_WORK
STD EXCHANGE
DIAPHRAGM
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40
DESC_WORK
STD EXCHANGE
ROTARY
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41
DESC_WORK
STD EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42
DESC_WORK
STD EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43
DESC_WORK
STD EXCHANGE
DIAPHRAGM
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44
DESC_WORK
STD REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
45
TERM_COND
ADDON
DIAPHRAGM
LP
1
This quotation is based on there being a working LF connection on the existing meter.
46
TERM_COND
ADDON
TURBINE
LP
1
This quotation is based on there being a working LF connection on the existing meter.
47
TERM_COND
ADDON
ROTARY
LP
1
This quotation is based on there being a working LF connection on the existing meter.
48
TERM_COND
ADDON
DIAPHRAGM
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
49
TERM_COND
ADDON
TURBINE
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
50
TERM_COND
ADDON
ROTARY
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
51
TERM_COND
ADDON
TURBINE
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
52
TERM_COND
ADDON
ROTARY
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
53
TERM_COND
ADDON
DIAPHRAGM
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54
TERM_COND
ADDON
DIAPHRAGM
MP
1
This quotation is based on there being a working LF connection on the existing meter.
55
TERM_COND
ADDON
ROTARY
MP
1
This quotation is based on there being a working LF connection on the existing meter.
56
TERM_COND
ADDON
TURBINE
MP
1
This quotation is based on there being a working LF connection on the existing meter.
57
TERM_COND
ADDON
ROTARY
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
58
TERM_COND
ADDON
DIAPHRAGM
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
59
TERM_COND
ADDON
TURBINE
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
60
TERM_COND
ADDON
DIAPHRAGM
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
61
TERM_COND
ADDON
ROTARY
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
62
TERM_COND
ADDON
TURBINE
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63
TERM_COND
ADVERSARIAL
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64
TERM_COND
ADVERSARIAL
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
65
TERM_COND
ADVERSARIAL
ROTARY
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
66
TERM_COND
ADVERSARIAL
TURBINE
LP
2
Lifting gear if required will be charged at a rate of 400 per day.
67
TERM_COND
ADVERSARIAL
ROTARY
LP
2
Lifting gear if required will be charged at a rate of 400 per day.
68
TERM_COND
ADVERSARIAL
ROTARY
MP
1
Lifting gear if required will be charged at a rate of 400 per day.
69
TERM_COND
ADVERSARIAL
TURBINE
MP
1
Lifting gear if required will be charged at a rate of 400 per day.
70
TERM_COND
EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
71
TERM_COND
EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
72
TERM_COND
EXCHANGE
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
73
TERM_COND
EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
74
TERM_COND
EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
75
TERM_COND
EXCHANGE
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
76
TERM_COND
EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
77
TERM_COND
EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
78
TERM_COND
EXCHANGE
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
79
TERM_COND
EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
80
TERM_COND
EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
81
TERM_COND
EXCHANGE
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
82
TERM_COND
EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
83
TERM_COND
EXCHANGE
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
84
TERM_COND
EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
85
TERM_COND
EXCHANGE
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
86
TERM_COND
EXCHANGE
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
87
TERM_COND
EXCHANGE
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88
TERM_COND
STD EXCHANGEEXCHANGE
DIAPHRAGM
MPLP
57
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
89
TERM_COND
STD EXCHANGEEXCHANGE
TURBINE
MPLP
57
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
90
TERM_COND
STD EXCHANGEEXCHANGE
ROTARY
MPLP
57
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
91
TERM_COND
STD EXCHANGEEXCHANGE
DIAPHRAGM
MPLP
68
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
92
TERM_COND
STD EXCHANGEEXCHANGE
TURBINE
MPLP
68
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
93
TERM_COND
STD EXCHANGEEXCHANGE
ROTARY
MPLP
68
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
94
TERM_COND
EXCHANGE
TURBINE
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
95
TERM_COND
EXCHANGE
ROTARY
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96
TERM_COND
EXCHANGE
DIAPHRAGM
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
97
TERM_COND
EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98
TERM_COND
EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
99
TERM_COND
EXCHANGE
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
100
TERM_COND
EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
101
TERM_COND
EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
102
TERM_COND
EXCHANGE
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
103
TERM_COND
EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
104
TERM_COND
EXCHANGE
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
105
TERM_COND
EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
106
TERM_COND
EXCHANGE
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
107
TERM_COND
EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
108
TERM_COND
EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
109
TERM_COND
EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
110
TERM_COND
EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
111
TERM_COND
EXCHANGE
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
112
TERM_COND
EXCHANGE
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
113
TERM_COND
EXCHANGE
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
114
TERM_COND
EXCHANGE
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115
TERM_COND
EXCHANGE
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116
TERM_COND
EXCHANGE
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
117
TERM_COND
EXCHANGE
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
118
TERM_COND
EXCHANGE
DIAPHRAGM
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
119
TERM_COND
EXCHANGE
ROTARY
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
120
TERM_COND
EXCHANGE
TURBINE
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
121
TERM_COND
EXCHANGE
DIAPHRAGM
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
122
TERM_COND
EXCHANGE
ROTARY
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
123
TERM_COND
EXCHANGE
TURBINE
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
124
TERM_COND
INSTALL
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
125
TERM_COND
INSTALL
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
126
TERM_COND
INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
127
TERM_COND
INSTALL
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
128
TERM_COND
INSTALL
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
129
TERM_COND
INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
130
TERM_COND
INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
131
TERM_COND
INSTALL
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
132
TERM_COND
INSTALL
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133
TERM_COND
INSTALL
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
134
TERM_COND
INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
135
TERM_COND
INSTALL
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
136
TERM_COND
INSTALL
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
137
TERM_COND
INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
138
TERM_COND
INSTALL
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
139
TERM_COND
INSTALL
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
140
TERM_COND
INSTALL
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141
TERM_COND
INSTALL
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
142
TERM_COND
INSTALL
TURBINE
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
143
TERM_COND
INSTALL
DIAPHRAGM
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144
TERM_COND
INSTALL
ROTARY
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
145
TERM_COND
INSTALL
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
146
TERM_COND
INSTALL
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
147
TERM_COND
INSTALL
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148
TERM_COND
INSTALL
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149
TERM_COND
INSTALL
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
150
TERM_COND
INSTALL
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
151
TERM_COND
INSTALL
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
152
TERM_COND
INSTALL
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153
TERM_COND
INSTALL
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
154
TERM_COND
INSTALL
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
155
TERM_COND
INSTALL
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
156
TERM_COND
INSTALL
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
157
TERM_COND
INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
158
TERM_COND
INSTALL
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
159
TERM_COND
INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
160
TERM_COND
INSTALL
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
161
TERM_COND
INSTALL
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
162
TERM_COND
INSTALL
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
163
TERM_COND
INSTALL
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
164
TERM_COND
INSTALL
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
165
TERM_COND
INSTALL
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166
TERM_COND
OFMAT
DIAPHRAGM
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
167
TERM_COND
OFMAT
ROTARY
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
168
TERM_COND
OFMAT
TURBINE
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
169
TERM_COND
OFMAT
DIAPHRAGM
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
170
TERM_COND
OFMAT
ROTARY
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
171
TERM_COND
OFMAT
TURBINE
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
172
TERM_COND
REMOVE
ROTARY
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
173
TERM_COND
REMOVE
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
174
TERM_COND
REMOVE
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
175
TERM_COND
REMOVE
DIAPHRAGM
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
176
TERM_COND
REMOVE
ROTARY
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
177
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
178
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
179
TERM_COND
REMOVE
DIAPHRAGM
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
180
TERM_COND
REMOVE
ROTARY
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
181
TERM_COND
REMOVE
TURBINE
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
182
TERM_COND
STD EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
183
TERM_COND
STD EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
184
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
185
TERM_COND
STD EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
186
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
187
TERM_COND
STD EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189
TERM_COND
STD EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
190
TERM_COND
STD EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
191
TERM_COND
STD EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
192
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
193
TERM_COND
STD EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
194
TERM_COND
STD EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
195
TERM_COND
STD EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
196
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
197
TERM_COND
STD EXCHANGE
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
198
TERM_COND
STD EXCHANGE
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
199
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
200
TERM_COND
STD EXCHANGE
TURBINE
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
201
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
202
TERM_COND
STD EXCHANGE
ROTARY
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
203
TERM_COND
STD EXCHANGE
ROTARY
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
204
TERM_COND
STD EXCHANGE
TURBINE
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
205
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
206
TERM_COND
STD EXCHANGE
ROTARY
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
207
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
208
TERM_COND
STD EXCHANGE
TURBINE
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
209
TERM_COND
STD EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
210
TERM_COND
STD EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
212
TERM_COND
STD EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
213
TERM_COND
STD EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
214
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
215
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216
TERM_COND
STD EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
217
TERM_COND
STD EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
218
TERM_COND
STD EXCHANGE
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
219
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
220
TERM_COND
STD EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
221
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
222
TERM_COND
STD EXCHANGE
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
223
TERM_COND
STD EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
224
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
225
TERM_COND
STD EXCHANGE
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
226
TERM_COND
STD EXCHANGE
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227
TERM_COND
STD EXCHANGE
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
229
TERM_COND
STD EXCHANGE
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231
TERM_COND
STD EXCHANGE
ROTARY
MP
78
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
232
TERM_COND
STD EXCHANGE
DIAPHRAGMTURBINE
MP
78
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
233
TERM_COND
STD EXCHANGE
TURBINEDIAPHRAGM
MP
79
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
234
TERM_COND
STD EXCHANGE
DIAPHRAGMROTARY
MP
89
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
235
TERM_COND
STD EXCHANGE
ROTARYTURBINE
MP
89
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
236
TERM_COND
STD EXCHANGESTD INSTALL
TURBINEDIAPHRAGM
MPLP
81
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
237
TERM_COND
STD EXCHANGESTD INSTALL
DIAPHRAGMROTARY
MPLP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
238
TERM_COND
STD EXCHANGESTD INSTALL
ROTARYTURBINE
MPLP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
239
TERM_COND
STD EXCHANGESTD INSTALL
TURBINEROTARY
MPLP
92
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
240
TERM_COND
STD INSTALL
DIAPHRAGMTURBINE
LP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
241
TERM_COND
STD INSTALL
ROTARYDIAPHRAGM
LP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242
TERM_COND
STD INSTALL
TURBINE
LP
13
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
243
TERM_COND
STD INSTALL
ROTARY
LP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
244
TERM_COND
STD INSTALL
TURBINEDIAPHRAGM
LP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
245
TERM_COND
STD INSTALL
DIAPHRAGMTURBINE
LP
24
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
246
TERM_COND
STD INSTALL
TURBINEDIAPHRAGM
LP
34
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
247
TERM_COND
STD INSTALL
ROTARY
LP
34
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248
TERM_COND
STD INSTALL
DIAPHRAGMROTARY
LP
35
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
249
TERM_COND
STD INSTALL
TURBINE
LP
45
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
250
TERM_COND
STD INSTALL
DIAPHRAGM
LP
45
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
251
TERM_COND
STD INSTALL
ROTARY
LP
46
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
252
TERM_COND
STD INSTALL
ROTARYTURBINE
LP
56
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
253
TERM_COND
STD INSTALL
TURBINEDIAPHRAGM
LP
56
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
254
TERM_COND
STD INSTALL
DIAPHRAGM
LP
57
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
255
TERM_COND
STD INSTALL
ROTARY
LP
67
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
256
TERM_COND
STD INSTALL
TURBINE
LP
67
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
257
TERM_COND
STD INSTALL
DIAPHRAGMTURBINE
LPMP
61
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
258
TERM_COND
STD INSTALL
DIAPHRAGMROTARY
LPMP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
259
TERM_COND
STD INSTALL
ROTARYDIAPHRAGM
LPMP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
260
TERM_COND
STD INSTALL
TURBINE
LPMP
72
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
261
TERM_COND
STD INSTALL
TURBINEDIAPHRAGM
MP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
262
TERM_COND
STD INSTALL
ROTARY
MP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
263
TERM_COND
STD INSTALL
DIAPHRAGMROTARY
MP
13
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
264
TERM_COND
STD INSTALL
TURBINE
MP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
265
TERM_COND
STD INSTALL
DIAPHRAGM
MP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
266
TERM_COND
STD INSTALL
ROTARYDIAPHRAGM
MP
24
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
267
TERM_COND
STD INSTALL
ROTARYTURBINE
MP
34
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
268
TERM_COND
STD INSTALL
TURBINEROTARY
MP
34
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
269
TERM_COND
STD INSTALL
DIAPHRAGMTURBINE
MP
35
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
270
TERM_COND
STD INSTALL
DIAPHRAGMROTARY
MP
45
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
271
TERM_COND
STD INSTALL
TURBINEDIAPHRAGM
MP
45
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
272
TERM_COND
STD INSTALL
ROTARYDIAPHRAGM
MP
46
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273
TERM_COND
STD INSTALL
TURBINEROTARY
MP
56
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
274
TERM_COND
STD INSTALL
ROTARYTURBINE
MP
56
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
275
TERM_COND
STD INSTALL
DIAPHRAGMTURBINE
MP
57
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
276
TERM_COND
STD INSTALL
DIAPHRAGM
MP
67
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
277
TERM_COND
STD INSTALL
ROTARY
MP
67
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
278
TERM_COND
STD INSTALLSTD REMOVE
TURBINEDIAPHRAGM
MPLP
61
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
279
TERM_COND
STD INSTALLSTD REMOVE
TURBINEDIAPHRAGM
MPLP
72
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
@@ -970,8 +970,8 @@ CREATE OR REPLACE PACKAGE BODY mip_bulk_load IS
pl('load_housings');
IF NOT file_available('COSTS.csv') THEN
pl('COSTS.csv file missing');
IF NOT file_available('HOUSINGS.csv') THEN
pl('HOUSINGS.csv file missing');
RETURN;
END IF;
@@ -1350,7 +1350,7 @@ CREATE OR REPLACE PACKAGE BODY mip_bulk_load IS
,'dd/mm/yyyy')
END AS valid_to
,upper(enty_code) AS enty_code
,upper(mesc_code) AS mesc_code
,upper(replace(mesc_code,'"','inch')) AS mesc_code
,upper(svcpt_code) AS svcpt_code
,upper(mety_code) AS mety_code
FROM ext_labour_costs
Reference in New Issue