Latest version of BULK_LOAD.xls exported as CSV files, changes to syco.ctl file.

Modified mip_bulk_load.pck to convert '"' to 'inch' in meter size codes imported from LABOUR_COSTS.csv.

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@3527 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
hardya
2008-02-12 16:52:40 +00:00
parent 7504e1196b
commit 3dcee7fb94
13 changed files with 15717 additions and 13203 deletions

View File

@@ -1,330 +1,334 @@
DOCUMENT_POSITION,ENTY_CODE,METY_CODE,SVCPT_CODE,SORT_ORDER,TEXT
CONT_SUM,ADVERSARIAL,TURBINE,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,TURBINE,MP,1,excluding lifting gear changes
CONT_SUM,ADVERSARIAL,ROTARY,MP,2,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,MP,2,plus purging on time and materials basis.
CONT_SUM,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,STD REMOVE,DIAPHRAGM,LP,1,plus purging on time and materials basis.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,REMOVE,TURBINE,MP,1,Purging of downstream pipework.
DESC_WORK,STD EXCHANGE,TURBINE,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,LP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,TURBINE,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,ROTARY,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD EXCHANGE,DIAPHRAGM,MP,1,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,STD REMOVE,DIAPHRAGM,LP,1,Purging of downstream pipework.
TERM_COND,ADDON,DIAPHRAGM,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"DOCUMENT_POSITION","ENTY_CODE","METY_CODE","SVCPT_CODE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes
"
TERM_COND,ADVERSARIAL,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,ADVERSARIAL,TURBINE,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND,EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,OFMAT,DIAPHRAGM,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,REMOVE,ROTARY,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes
"
TERM_COND,REMOVE,TURBINE,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,DIAPHRAGM,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,ROTARY,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,REMOVE,TURBINE,MP,1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
TERM_COND,STD EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
TERM_COND,STD EXCHANGE,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,LP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,MP,8,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,ROTARY,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD EXCHANGE,TURBINE,MP,9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,TURBINE,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,LP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,LP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,ROTARY,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
TERM_COND,STD INSTALL,DIAPHRAGM,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,6,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,MP,7,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
TERM_COND,STD REMOVE,DIAPHRAGM,LP,2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
1 DOCUMENT_POSITION ENTY_CODE METY_CODE SVCPT_CODE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL TURBINE LP 1 excluding lifting gear changes excluding lifting gear changes
CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY LP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL TURBINE LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY MP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL TURBINE MP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL ROTARY MP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL TURBINE MP 2 plus purging on time and materials basis.
CONT_SUM STD REMOVE DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
CONT_SUM_QA STD REMOVE DIAPHRAGM LP 1 plus purging on time and materials basis.
DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL ROTARY MP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL TURBINE MP 1 Purging of downstream pipework.
DESC_WORK EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON TURBINE MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
3 TERM_COND CONT_SUM ADVERSARIAL ROTARY DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. plus purging on time and materials basis.
4 TERM_COND CONT_SUM ADVERSARIAL TURBINE ROTARY LP 2 1 Lifting gear if required will be charged at a rate of 400 per day. excluding lifting gear changes
5 TERM_COND CONT_SUM ADVERSARIAL ROTARY TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day. plus purging on time and materials basis.
TERM_COND ADVERSARIAL ROTARY MP 1 Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
6 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP 6 2 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. plus purging on time and materials basis.
7 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL TURBINE DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. plus purging on time and materials basis.
8 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. excluding lifting gear changes
9 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL ROTARY TURBINE LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. excluding lifting gear changes
10 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL ROTARY LP MP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
11 TERM_COND CONT_SUM STD EXCHANGE ADVERSARIAL TURBINE LP MP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
12 TERM_COND CONT_SUM STD EXCHANGE STD REMOVE DIAPHRAGM LP 8 1 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. plus purging on time and materials basis.
13 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL ROTARY LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
14 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL DIAPHRAGM LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
15 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL TURBINE LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. plus purging on time and materials basis.
16 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL ROTARY TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
17 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL TURBINE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
18 TERM_COND CONT_SUM_QA STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. plus purging on time and materials basis.
19 TERM_COND CONT_SUM_QA STD EXCHANGE STD REMOVE TURBINE DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. plus purging on time and materials basis.
20 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL ROTARY DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Purging of downstream pipework.
21 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL DIAPHRAGM TURBINE MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Purging of downstream pipework.
22 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY MP LP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
23 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL ROTARY DIAPHRAGM MP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
24 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL TURBINE ROTARY MP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Purging of downstream pipework.
25 TERM_COND DESC_WORK STD EXCHANGE ADVERSARIAL TURBINE MP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Purging of downstream pipework.
26 TERM_COND DESC_WORK STD EXCHANGE EXCHANGE DIAPHRAGM ROTARY MP LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
27 TERM_COND DESC_WORK STD EXCHANGE EXCHANGE ROTARY DIAPHRAGM MP LP 4 1 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28 DESC_WORK EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29 DESC_WORK EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30 DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31 DESC_WORK EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32 DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
33 DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
34 DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
35 DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
36 DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
37 DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
38 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
39 DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41 DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42 DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43 DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44 DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
45 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
46 TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
47 TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
48 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
49 TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
50 TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
51 TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
52 TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
53 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54 TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
55 TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
56 TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
57 TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
58 TERM_COND ADDON DIAPHRAGM MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
59 TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
60 TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
61 TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
62 TERM_COND ADDON TURBINE MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63 TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64 TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
65 TERM_COND ADVERSARIAL ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
66 TERM_COND ADVERSARIAL TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day.
67 TERM_COND ADVERSARIAL ROTARY LP 2 Lifting gear if required will be charged at a rate of 400 per day.
68 TERM_COND ADVERSARIAL ROTARY MP 1 Lifting gear if required will be charged at a rate of 400 per day.
69 TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
70 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
71 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
72 TERM_COND EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
73 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
74 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
75 TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
76 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
77 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
78 TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
79 TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
80 TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
81 TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
82 TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
83 TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
84 TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
85 TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
86 TERM_COND EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
87 TERM_COND EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88 TERM_COND STD EXCHANGE EXCHANGE DIAPHRAGM MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
89 TERM_COND STD EXCHANGE EXCHANGE TURBINE MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
90 TERM_COND STD EXCHANGE EXCHANGE ROTARY MP LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
91 TERM_COND STD EXCHANGE EXCHANGE DIAPHRAGM MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
92 TERM_COND STD EXCHANGE EXCHANGE TURBINE MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
93 TERM_COND STD EXCHANGE EXCHANGE ROTARY MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
94 TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
95 TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96 TERM_COND EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
97 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
99 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
100 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
101 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
102 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
103 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
104 TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
105 TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
106 TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
107 TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
108 TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
109 TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
110 TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
111 TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
112 TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
113 TERM_COND EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
114 TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115 TERM_COND EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116 TERM_COND EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
117 TERM_COND EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
118 TERM_COND EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
119 TERM_COND EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
120 TERM_COND EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
121 TERM_COND EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
122 TERM_COND EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
123 TERM_COND EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
124 TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
125 TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
126 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
127 TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
128 TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
129 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
130 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
131 TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
132 TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133 TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
134 TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
135 TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
136 TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
137 TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
138 TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
139 TERM_COND INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
140 TERM_COND INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141 TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
142 TERM_COND INSTALL TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
143 TERM_COND INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144 TERM_COND INSTALL ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
145 TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
146 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
147 TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148 TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
150 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
151 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
152 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153 TERM_COND INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
154 TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
155 TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
156 TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
157 TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
158 TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
159 TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
160 TERM_COND INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
161 TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
162 TERM_COND INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
163 TERM_COND INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
164 TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
165 TERM_COND INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166 TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
167 TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
168 TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
169 TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
170 TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
171 TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
172 TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
173 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
174 TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
175 TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
176 TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
177 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
178 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
179 TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
180 TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
181 TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
182 TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
183 TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
184 TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
185 TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
186 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
187 TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189 TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
190 TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
191 TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
192 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
193 TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
194 TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
195 TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
196 TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
197 TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
198 TERM_COND STD EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
199 TERM_COND STD EXCHANGE DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
200 TERM_COND STD EXCHANGE TURBINE LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
201 TERM_COND STD EXCHANGE DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
202 TERM_COND STD EXCHANGE ROTARY LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
203 TERM_COND STD EXCHANGE ROTARY LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
204 TERM_COND STD EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
205 TERM_COND STD EXCHANGE DIAPHRAGM LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
206 TERM_COND STD EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
207 TERM_COND STD EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
208 TERM_COND STD EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
209 TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
210 TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211 TERM_COND STD EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
212 TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
213 TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
214 TERM_COND STD EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
215 TERM_COND STD EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
217 TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
218 TERM_COND STD EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
219 TERM_COND STD EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
220 TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
221 TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
222 TERM_COND STD EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
223 TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
224 TERM_COND STD EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
225 TERM_COND STD EXCHANGE TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
226 TERM_COND STD EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227 TERM_COND STD EXCHANGE ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228 TERM_COND STD EXCHANGE DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
229 TERM_COND STD EXCHANGE TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230 TERM_COND STD EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231 TERM_COND STD EXCHANGE ROTARY MP 7 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
232 TERM_COND STD EXCHANGE DIAPHRAGM TURBINE MP 7 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
233 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP 7 9 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
234 TERM_COND STD EXCHANGE DIAPHRAGM ROTARY MP 8 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
235 TERM_COND STD EXCHANGE ROTARY TURBINE MP 8 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
236 TERM_COND STD EXCHANGE STD INSTALL TURBINE DIAPHRAGM MP LP 8 1 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
237 TERM_COND STD EXCHANGE STD INSTALL DIAPHRAGM ROTARY MP LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
238 TERM_COND STD EXCHANGE STD INSTALL ROTARY TURBINE MP LP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
239 TERM_COND STD EXCHANGE STD INSTALL TURBINE ROTARY MP LP 9 2 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
240 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
241 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242 TERM_COND STD INSTALL TURBINE LP 1 3 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
243 TERM_COND STD INSTALL ROTARY LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
244 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
245 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
246 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
247 TERM_COND STD INSTALL ROTARY LP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248 TERM_COND STD INSTALL DIAPHRAGM ROTARY LP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
249 TERM_COND STD INSTALL TURBINE LP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
250 TERM_COND STD INSTALL DIAPHRAGM LP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
251 TERM_COND STD INSTALL ROTARY LP 4 6 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
252 TERM_COND STD INSTALL ROTARY TURBINE LP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
253 TERM_COND STD INSTALL TURBINE DIAPHRAGM LP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
254 TERM_COND STD INSTALL DIAPHRAGM LP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
255 TERM_COND STD INSTALL ROTARY LP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
256 TERM_COND STD INSTALL TURBINE LP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
257 TERM_COND STD INSTALL DIAPHRAGM TURBINE LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
258 TERM_COND STD INSTALL DIAPHRAGM ROTARY LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
259 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
260 TERM_COND STD INSTALL TURBINE LP MP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
261 TERM_COND STD INSTALL TURBINE DIAPHRAGM MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
262 TERM_COND STD INSTALL ROTARY MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
263 TERM_COND STD INSTALL DIAPHRAGM ROTARY MP 1 3 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
264 TERM_COND STD INSTALL TURBINE MP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
265 TERM_COND STD INSTALL DIAPHRAGM MP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
266 TERM_COND STD INSTALL ROTARY DIAPHRAGM MP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
267 TERM_COND STD INSTALL ROTARY TURBINE MP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
268 TERM_COND STD INSTALL TURBINE ROTARY MP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
269 TERM_COND STD INSTALL DIAPHRAGM TURBINE MP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
270 TERM_COND STD INSTALL DIAPHRAGM ROTARY MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
271 TERM_COND STD INSTALL TURBINE DIAPHRAGM MP 4 5 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
272 TERM_COND STD INSTALL ROTARY DIAPHRAGM MP 4 6 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273 TERM_COND STD INSTALL TURBINE ROTARY MP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
274 TERM_COND STD INSTALL ROTARY TURBINE MP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
275 TERM_COND STD INSTALL DIAPHRAGM TURBINE MP 5 7 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
276 TERM_COND STD INSTALL DIAPHRAGM MP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
277 TERM_COND STD INSTALL ROTARY MP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
278 TERM_COND STD INSTALL STD REMOVE TURBINE DIAPHRAGM MP LP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
279 TERM_COND STD INSTALL STD REMOVE TURBINE DIAPHRAGM MP LP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334