@@ -1,22 +1,70 @@
"DOCUMENT_POSITION","JOB TYPE","METER TYPE","SERVICE PRESSURE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear changes"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM_QA","STD INSTALL","TURBINE","MP",1,"excluding lifting gear changes"
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
@@ -32,16 +80,19 @@
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
@@ -81,8 +132,7 @@
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -92,8 +142,8 @@
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -103,8 +153,8 @@
"TERM_COND","EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -114,8 +164,8 @@
"TERM_COND","EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -125,8 +175,8 @@
"TERM_COND","EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -136,8 +186,8 @@
"TERM_COND","EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -156,6 +206,7 @@
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -165,6 +216,7 @@
"TERM_COND","INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -174,6 +226,7 @@
"TERM_COND","INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -183,6 +236,7 @@
"TERM_COND","INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -192,6 +246,7 @@
"TERM_COND","INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
@@ -204,22 +259,26 @@
"TERM_COND","OFMAT","TURBINE","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -242,6 +301,7 @@
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -253,6 +313,7 @@
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -264,6 +325,7 @@
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -275,6 +337,7 @@
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","LP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -286,6 +349,7 @@
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","MP",12,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -304,6 +368,7 @@
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -313,6 +378,7 @@
"TERM_COND","STD INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -322,6 +388,7 @@
"TERM_COND","STD INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -331,6 +398,7 @@
"TERM_COND","STD INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
@@ -340,6 +408,38 @@
"TERM_COND","STD INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear changes"
"DESC_WORK","STD REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear changes"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
1 DOCUMENT_POSITION JOB TYPE METER TYPE SERVICE PRESSURE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
3 CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL ROTARY DIAPHRAGM LP MP 1 2 excluding lifting gear changes
5 CONT_SUM ADVERSARIAL ROTARY LP 2 1 plus purging on time and materials basis.
6 CONT_SUM ADVERSARIAL ROTARY MP LP 1 2 excluding lifting gear changes
7 CONT_SUM ADVERSARIAL ROTARY MP 2 1 plus purging on time and materials basis.
8 CONT_SUM ADVERSARIAL TURBINE ROTARY LP MP 1 2 excluding lifting gear changes
9 CONT_SUM ADVERSARIAL TURBINE LP 2 1 plus purging on time and materials basis.
10 CONT_SUM ADVERSARIAL TURBINE MP LP 1 2 excluding lifting gear changes
11 CONT_SUM ADVERSARIAL TURBINE MP 2 1 plus purging on time and materials basis.
12 CONT_SUM STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 2 plus purging on time and materials basis. excluding lifting gear changes
13 CONT_SUM EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
14 CONT_SUM EXCHANGE ROTARY LP 1 excluding lifting gear changes
15 CONT_SUM EXCHANGE ROTARY MP 1 excluding lifting gear changes
16 CONT_SUM EXCHANGE TURBINE LP 1 excluding lifting gear changes
17 CONT_SUM EXCHANGE TURBINE MP 1 excluding lifting gear changes
18 CONT_SUM INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
19 CONT_SUM INSTALL ROTARY LP 1 excluding lifting gear changes
20 CONT_SUM INSTALL ROTARY MP 1 excluding lifting gear changes
21 CONT_SUM INSTALL TURBINE LP 1 excluding lifting gear changes
22 CONT_SUM INSTALL TURBINE MP 1 excluding lifting gear changes
23 CONT_SUM REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
24 CONT_SUM REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
25 CONT_SUM STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
26 CONT_SUM STD EXCHANGE ROTARY LP 1 excluding lifting gear changes
27 CONT_SUM STD EXCHANGE ROTARY MP 1 excluding lifting gear changes
28 CONT_SUM STD EXCHANGE TURBINE LP 1 excluding lifting gear changes
29 CONT_SUM STD EXCHANGE TURBINE MP 1 excluding lifting gear changes
30 CONT_SUM STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
31 CONT_SUM STD INSTALL ROTARY LP 1 excluding lifting gear changes
32 CONT_SUM STD INSTALL ROTARY MP 1 excluding lifting gear changes
33 CONT_SUM STD INSTALL TURBINE LP 1 excluding lifting gear changes
34 CONT_SUM STD INSTALL TURBINE MP 1 excluding lifting gear changes
35 CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
36 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
37 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear changes
38 CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
39 CONT_SUM_QA ADVERSARIAL ROTARY LP 2 excluding lifting gear changes
40 CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
41 CONT_SUM_QA ADVERSARIAL ROTARY MP 2 excluding lifting gear changes
42 CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
43 CONT_SUM_QA ADVERSARIAL TURBINE LP 2 excluding lifting gear changes
44 CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
45 CONT_SUM_QA STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 2 plus purging on time and materials basis. excluding lifting gear changes
46 CONT_SUM_QA EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
47 CONT_SUM_QA EXCHANGE ROTARY LP 1 excluding lifting gear changes
48 CONT_SUM_QA EXCHANGE ROTARY MP 1 excluding lifting gear changes
49 CONT_SUM_QA EXCHANGE TURBINE LP 1 excluding lifting gear changes
50 CONT_SUM_QA EXCHANGE TURBINE MP 1 excluding lifting gear changes
51 CONT_SUM_QA INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
52 CONT_SUM_QA INSTALL ROTARY LP 1 excluding lifting gear changes
53 CONT_SUM_QA INSTALL ROTARY MP 1 excluding lifting gear changes
54 CONT_SUM_QA INSTALL TURBINE LP 1 excluding lifting gear changes
55 CONT_SUM_QA INSTALL TURBINE MP 1 excluding lifting gear changes
56 CONT_SUM_QA REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
57 CONT_SUM_QA REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
58 CONT_SUM_QA STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear changes
59 CONT_SUM_QA STD EXCHANGE ROTARY LP 1 excluding lifting gear changes
60 CONT_SUM_QA STD EXCHANGE ROTARY MP 1 excluding lifting gear changes
61 CONT_SUM_QA STD EXCHANGE TURBINE LP 1 excluding lifting gear changes
62 CONT_SUM_QA STD EXCHANGE TURBINE MP 1 excluding lifting gear changes
63 CONT_SUM_QA STD INSTALL DIAPHRAGM MP 1 excluding lifting gear changes
64 CONT_SUM_QA STD INSTALL ROTARY LP 1 excluding lifting gear changes
65 CONT_SUM_QA STD INSTALL ROTARY MP 1 excluding lifting gear changes
66 CONT_SUM_QA STD INSTALL TURBINE LP 1 excluding lifting gear changes
67 CONT_SUM_QA STD INSTALL TURBINE MP 1 excluding lifting gear changes
68 DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
69 DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
70 DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
80 DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
81 DESC_WORK REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
82 DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
83 DESC_WORK REMOVE ROTARY LP 2 excluding lifting gear changes
84 DESC_WORK REMOVE ROTARY MP 1 Purging of downstream pipework.
85 DESC_WORK REMOVE ROTARY MP 2 excluding lifting gear changes
86 DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
87 DESC_WORK REMOVE TURBINE LP 2 excluding lifting gear changes
88 DESC_WORK REMOVE TURBINE MP 1 Purging of downstream pipework.
89 DESC_WORK REMOVE TURBINE MP 2 excluding lifting gear changes
90 DESC_WORK STD EXCHANGE DIAPHRAGM LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
91 DESC_WORK STD EXCHANGE DIAPHRAGM MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
92 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
93 DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
94 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
95 DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
96 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
97 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
98 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
132 TERM_COND EXCHANGE DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
133 TERM_COND EXCHANGE DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
134 TERM_COND EXCHANGE DIAPHRAGM LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
135 TERM_COND EXCHANGE DIAPHRAGM LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND EXCHANGE DIAPHRAGM LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
136 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
137 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
138 TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
142 TERM_COND EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
143 TERM_COND EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
144 TERM_COND EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
145 TERM_COND EXCHANGE DIAPHRAGM MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
146 TERM_COND EXCHANGE DIAPHRAGM MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
147 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
148 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
149 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
153 TERM_COND EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
154 TERM_COND EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
155 TERM_COND EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
156 TERM_COND EXCHANGE ROTARY LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
157 TERM_COND EXCHANGE ROTARY LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
158 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
159 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
160 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
164 TERM_COND EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
165 TERM_COND EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
166 TERM_COND EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
167 TERM_COND EXCHANGE ROTARY MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168 TERM_COND EXCHANGE ROTARY MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
169 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
170 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
171 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
175 TERM_COND EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
176 TERM_COND EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
177 TERM_COND EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
178 TERM_COND EXCHANGE TURBINE LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
179 TERM_COND EXCHANGE TURBINE LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
180 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
181 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
182 TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
186 TERM_COND EXCHANGE TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
187 TERM_COND EXCHANGE TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
188 TERM_COND EXCHANGE TURBINE MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
189 TERM_COND EXCHANGE TURBINE MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
190 TERM_COND EXCHANGE TURBINE MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Lifting gear if required will be charged at a rate of 400 per day.
191 TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
192 TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
193 TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
206 TERM_COND INSTALL DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
207 TERM_COND INSTALL DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
208 TERM_COND INSTALL DIAPHRAGM MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
209 TERM_COND INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
210 TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
211 TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
212 TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND INSTALL ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
217 TERM_COND INSTALL ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
218 TERM_COND INSTALL ROTARY LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
219 TERM_COND INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
220 TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
221 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
222 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
226 TERM_COND INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
227 TERM_COND INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
228 TERM_COND INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
229 TERM_COND INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
230 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
231 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
232 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236 TERM_COND INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
237 TERM_COND INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
238 TERM_COND INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
239 TERM_COND INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
240 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
241 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
242 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
246 TERM_COND INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
247 TERM_COND INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
248 TERM_COND INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
249 TERM_COND INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
250 TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
251 TERM_COND OFMAT DIAPHRAGM LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
252 TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
259 TERM_COND OFMAT TURBINE LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
260 TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
261 TERM_COND OFMAT TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
262 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
263 TERM_COND REMOVE DIAPHRAGM LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
264 TERM_COND REMOVE DIAPHRAGM MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
265 TERM_COND REMOVE DIAPHRAGM MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
266 TERM_COND REMOVE ROTARY DIAPHRAGM LP MP 1 2 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
267 TERM_COND REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
268 TERM_COND REMOVE ROTARY LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
269 TERM_COND REMOVE ROTARY LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
270 TERM_COND REMOVE ROTARY MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
271 TERM_COND REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
272 TERM_COND REMOVE ROTARY MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
273 TERM_COND REMOVE TURBINE ROTARY LP MP 1 2 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
274 TERM_COND REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
275 TERM_COND REMOVE TURBINE LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
276 TERM_COND REMOVE TURBINE LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
277 TERM_COND REMOVE TURBINE MP LP 1 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
278 TERM_COND REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
279 TERM_COND REMOVE TURBINE MP 2 1 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
280 TERM_COND STD EXCHANGE REMOVE DIAPHRAGM TURBINE LP MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
281 TERM_COND REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.
282 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
283 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
284 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
301 TERM_COND STD EXCHANGE DIAPHRAGM MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
302 TERM_COND STD EXCHANGE DIAPHRAGM MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
303 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
304 TERM_COND STD EXCHANGE DIAPHRAGM MP 12 Lifting gear if required will be charged at a rate of 400 per day.
305 TERM_COND STD EXCHANGE ROTARY LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
306 TERM_COND STD EXCHANGE ROTARY LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
307 TERM_COND STD EXCHANGE ROTARY LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
313 TERM_COND STD EXCHANGE ROTARY LP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
314 TERM_COND STD EXCHANGE ROTARY LP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
315 TERM_COND STD EXCHANGE ROTARY MP LP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
316 TERM_COND STD EXCHANGE ROTARY LP 12 Lifting gear if required will be charged at a rate of 400 per day.
317 TERM_COND STD EXCHANGE ROTARY MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
318 TERM_COND STD EXCHANGE ROTARY MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
319 TERM_COND STD EXCHANGE ROTARY MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
325 TERM_COND STD EXCHANGE ROTARY MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
326 TERM_COND STD EXCHANGE ROTARY MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
327 TERM_COND STD EXCHANGE TURBINE ROTARY LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
328 TERM_COND STD EXCHANGE ROTARY MP 12 Lifting gear if required will be charged at a rate of 400 per day.
329 TERM_COND STD EXCHANGE TURBINE LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
330 TERM_COND STD EXCHANGE TURBINE LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
331 TERM_COND STD EXCHANGE TURBINE LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
337 TERM_COND STD EXCHANGE TURBINE LP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
338 TERM_COND STD EXCHANGE TURBINE LP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
339 TERM_COND STD EXCHANGE TURBINE MP LP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
340 TERM_COND STD EXCHANGE TURBINE LP 12 Lifting gear if required will be charged at a rate of 400 per day.
341 TERM_COND STD EXCHANGE TURBINE MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
342 TERM_COND STD EXCHANGE TURBINE MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
343 TERM_COND STD EXCHANGE TURBINE MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
349 TERM_COND STD EXCHANGE TURBINE MP 10 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
350 TERM_COND STD EXCHANGE TURBINE MP 11 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
351 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM TURBINE LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
352 TERM_COND STD EXCHANGE TURBINE MP 12 Lifting gear if required will be charged at a rate of 400 per day.
353 TERM_COND STD INSTALL DIAPHRAGM LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
354 TERM_COND STD INSTALL DIAPHRAGM LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
355 TERM_COND STD INSTALL DIAPHRAGM LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
368 TERM_COND STD INSTALL DIAPHRAGM MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
369 TERM_COND STD INSTALL DIAPHRAGM MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
370 TERM_COND STD INSTALL ROTARY DIAPHRAGM LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
371 TERM_COND STD INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
372 TERM_COND STD INSTALL ROTARY LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
373 TERM_COND STD INSTALL ROTARY LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
374 TERM_COND STD INSTALL ROTARY LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
378 TERM_COND STD INSTALL ROTARY LP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
379 TERM_COND STD INSTALL ROTARY LP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
380 TERM_COND STD INSTALL ROTARY MP LP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
381 TERM_COND STD INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
382 TERM_COND STD INSTALL ROTARY MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
383 TERM_COND STD INSTALL ROTARY MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
384 TERM_COND STD INSTALL ROTARY MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
388 TERM_COND STD INSTALL ROTARY MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
389 TERM_COND STD INSTALL ROTARY MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
390 TERM_COND STD INSTALL TURBINE ROTARY LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
391 TERM_COND STD INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
392 TERM_COND STD INSTALL TURBINE LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
393 TERM_COND STD INSTALL TURBINE LP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
394 TERM_COND STD INSTALL TURBINE LP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
398 TERM_COND STD INSTALL TURBINE LP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
399 TERM_COND STD INSTALL TURBINE LP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
400 TERM_COND STD INSTALL TURBINE MP LP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
401 TERM_COND STD INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
402 TERM_COND STD INSTALL TURBINE MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
403 TERM_COND STD INSTALL TURBINE MP 3 2 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
404 TERM_COND STD INSTALL TURBINE MP 4 3 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
408 TERM_COND STD INSTALL TURBINE MP 8 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
409 TERM_COND STD INSTALL TURBINE MP 9 8 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
410 TERM_COND STD REMOVE STD INSTALL DIAPHRAGM TURBINE LP MP 1 9 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
411 TERM_COND STD INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
412 CONT_SUM STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
413 CONT_SUM STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
414 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
415 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 2 excluding lifting gear changes
416 DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
417 DESC_WORK STD REMOVE DIAPHRAGM MP 1 Purging of downstream pipework.
418 DESC_WORK STD REMOVE ROTARY LP 1 Purging of downstream pipework.
419 DESC_WORK STD REMOVE ROTARY LP 2 excluding lifting gear changes
420 DESC_WORK STD REMOVE ROTARY MP 1 Purging of downstream pipework.
421 DESC_WORK STD REMOVE ROTARY MP 2 excluding lifting gear changes
422 DESC_WORK STD REMOVE TURBINE LP 1 Purging of downstream pipework.
423 DESC_WORK STD REMOVE TURBINE LP 2 excluding lifting gear changes
424 DESC_WORK STD REMOVE TURBINE MP 1 Purging of downstream pipework.
425 DESC_WORK STD REMOVE TURBINE MP 2 excluding lifting gear changes
426 TERM_COND STD REMOVE DIAPHRAGM LP 2 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
427 TERM_COND STD REMOVE DIAPHRAGM LP 3 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
428 TERM_COND STD REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
429 TERM_COND STD REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
430 TERM_COND STD REMOVE DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
431 TERM_COND STD REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
432 TERM_COND STD REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
433 TERM_COND STD REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
434 TERM_COND STD REMOVE ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
435 TERM_COND STD REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
436 TERM_COND STD REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
437 TERM_COND STD REMOVE ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
438 TERM_COND STD REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
439 TERM_COND STD REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
440 TERM_COND STD REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
441 TERM_COND STD REMOVE TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
442 TERM_COND STD REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
443 TERM_COND STD REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
444 TERM_COND STD REMOVE TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
445 TERM_COND STD REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.