Updated BULK_LOAD.xls provided by customer, removed errors and junk data, these new data changes have been applied to the UAT system

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@4734 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
PriestJ
2008-04-07 16:10:41 +00:00
parent 759f63c635
commit 48201d38e4
6 changed files with 394 additions and 393 deletions

View File

@@ -1,334 +1,345 @@
"DOCUMENT_POSITION","ENTY_CODE","METY_CODE","SVCPT_CODE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes
"
"DOCUMENT_POSITION","JOB TYPE","METER TYPE","SERVICE PRESSURE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes
"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"excluding lifting gear changes"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. "
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","ADVERSARIAL","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","OFMAT","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
1 DOCUMENT_POSITION ENTY_CODE JOB TYPE METY_CODE METER TYPE SVCPT_CODE SERVICE PRESSURE SORT_ORDER TEXT
CONT_SUM ADVERSARIAL TURBINE LP 1 excluding lifting gear changes
CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
2 CONT_SUM ADVERSARIAL ROTARY DIAPHRAGM LP LP 1 excluding lifting gear changes plus purging on time and materials basis.
CONT_SUM ADVERSARIAL TURBINE LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY LP 2 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
CONT_SUM ADVERSARIAL ROTARY MP 1 excluding lifting gear changes
3 CONT_SUM ADVERSARIAL TURBINE DIAPHRAGM MP MP 1 excluding lifting gear changes plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL ROTARY ROTARY MP LP 2 1 plus purging on time and materials basis. excluding lifting gear changes
5 CONT_SUM ADVERSARIAL TURBINE ROTARY MP LP 2 plus purging on time and materials basis.
6 CONT_SUM STD REMOVE ADVERSARIAL DIAPHRAGM ROTARY LP MP 1 plus purging on time and materials basis. excluding lifting gear changes
CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
7 CONT_SUM_QA CONT_SUM ADVERSARIAL DIAPHRAGM ROTARY LP MP 1 2 plus purging on time and materials basis.
8 CONT_SUM ADVERSARIAL TURBINE LP 1 excluding lifting gear changes
9 CONT_SUM ADVERSARIAL TURBINE LP 2 plus purging on time and materials basis.
10 CONT_SUM ADVERSARIAL TURBINE MP 1 excluding lifting gear changes
11 CONT_SUM_QA CONT_SUM ADVERSARIAL TURBINE TURBINE LP MP 1 2 plus purging on time and materials basis.
12 CONT_SUM_QA CONT_SUM ADVERSARIAL STD REMOVE TURBINE DIAPHRAGM MP LP 1 plus purging on time and materials basis.
CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
13 CONT_SUM_QA ADVERSARIAL ROTARY DIAPHRAGM MP LP 1 plus purging on time and materials basis.
14 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
15 CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
16 CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
17 CONT_SUM_QA STD REMOVE ADVERSARIAL DIAPHRAGM TURBINE LP LP 1 plus purging on time and materials basis.
18 DESC_WORK CONT_SUM_QA ADVERSARIAL DIAPHRAGM TURBINE LP MP 1 Purging of downstream pipework. plus purging on time and materials basis.
DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
19 DESC_WORK CONT_SUM_QA ADVERSARIAL STD REMOVE DIAPHRAGM DIAPHRAGM MP LP 1 Purging of downstream pipework. plus purging on time and materials basis.
20 DESC_WORK ADVERSARIAL ROTARY DIAPHRAGM MP LP 1 Purging of downstream pipework.
DESC_WORK ADVERSARIAL TURBINE MP 1 Purging of downstream pipework.
DESC_WORK EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
21 DESC_WORK EXCHANGE ADVERSARIAL DIAPHRAGM DIAPHRAGM LP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
22 DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
23 DESC_WORK EXCHANGE ADVERSARIAL TURBINE ROTARY LP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
24 DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
25 DESC_WORK EXCHANGE ADVERSARIAL ROTARY TURBINE MP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
26 DESC_WORK EXCHANGE DIAPHRAGM DIAPHRAGM MP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
DESC_WORK REMOVE TURBINE LP 1 Purging of downstream pipework.
DESC_WORK REMOVE ROTARY LP 1 Purging of downstream pipework.
27 DESC_WORK REMOVE EXCHANGE ROTARY DIAPHRAGM MP MP 1 Purging of downstream pipework. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28 DESC_WORK EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29 DESC_WORK EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30 DESC_WORK EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31 DESC_WORK EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32 DESC_WORK REMOVE DIAPHRAGM DIAPHRAGM MP LP 1 Purging of downstream pipework.
33 DESC_WORK REMOVE TURBINE DIAPHRAGM MP MP 1 Purging of downstream pipework.
34 DESC_WORK STD EXCHANGE REMOVE TURBINE ROTARY LP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
35 DESC_WORK STD EXCHANGE REMOVE DIAPHRAGM ROTARY LP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
36 DESC_WORK STD EXCHANGE REMOVE ROTARY TURBINE LP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
37 DESC_WORK STD EXCHANGE REMOVE TURBINE TURBINE MP MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others. Purging of downstream pipework.
DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
38 DESC_WORK STD EXCHANGE DIAPHRAGM DIAPHRAGM MP LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK STD REMOVE DIAPHRAGM LP 1 Purging of downstream pipework.
TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
39 TERM_COND DESC_WORK ADDON STD EXCHANGE ROTARY DIAPHRAGM LP MP 1 This quotation is based on there being a working LF connection on the existing meter. Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40 DESC_WORK STD EXCHANGE ROTARY LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41 DESC_WORK STD EXCHANGE ROTARY MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42 DESC_WORK STD EXCHANGE TURBINE LP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43 DESC_WORK STD EXCHANGE TURBINE MP 1 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44 TERM_COND DESC_WORK ADDON STD REMOVE DIAPHRAGM DIAPHRAGM LP LP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. Purging of downstream pipework.
45 TERM_COND ADDON TURBINE DIAPHRAGM LP LP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
46 TERM_COND ADDON ROTARY DIAPHRAGM LP LP 3 2 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
47 TERM_COND ADDON ROTARY DIAPHRAGM MP LP 2 3 This quotation does not include for the provision of a separate instrumentation cabinet. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
48 TERM_COND ADDON DIAPHRAGM DIAPHRAGM MP MP 2 1 This quotation does not include for the provision of a separate instrumentation cabinet. This quotation is based on there being a working LF connection on the existing meter.
TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
49 TERM_COND ADDON TURBINE DIAPHRAGM MP MP 3 2 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you. This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
50 TERM_COND ADVERSARIAL ADDON TURBINE DIAPHRAGM LP MP 1 3 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
51 TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
52 TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
53 TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54 TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
55 TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
56 TERM_COND ADVERSARIAL ADDON ROTARY ROTARY LP MP 1 3 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
57 TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
58 TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
59 TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
60 TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
61 TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
62 TERM_COND ADVERSARIAL ADDON TURBINE TURBINE LP MP 2 3 Lifting gear if required will be charged at a rate of 400 per day. Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63 TERM_COND ADVERSARIAL ROTARY DIAPHRAGM LP LP 2 1 Lifting gear if required will be charged at a rate of 400 per day. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64 TERM_COND ADVERSARIAL ROTARY DIAPHRAGM MP LP 1 2 Lifting gear if required will be charged at a rate of 400 per day. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
65 TERM_COND EXCHANGE ADVERSARIAL TURBINE ROTARY LP LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
66 TERM_COND EXCHANGE ADVERSARIAL DIAPHRAGM ROTARY LP LP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. Lifting gear if required will be charged at a rate of 400 per day.
67 TERM_COND ADVERSARIAL ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
68 TERM_COND EXCHANGE ADVERSARIAL ROTARY ROTARY LP MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Lifting gear if required will be charged at a rate of 400 per day.
69 TERM_COND ADVERSARIAL ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
70 TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
71 TERM_COND ADVERSARIAL TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day.
72 TERM_COND ADVERSARIAL TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
73 TERM_COND EXCHANGE ADVERSARIAL TURBINE TURBINE LP MP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.. Lifting gear if required will be charged at a rate of 400 per day.
74 TERM_COND EXCHANGE ADVERSARIAL DIAPHRAGM TURBINE LP MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
75 TERM_COND EXCHANGE TURBINE DIAPHRAGM LP LP 3 1 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
76 TERM_COND EXCHANGE ROTARY DIAPHRAGM LP LP 4 2 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
77 TERM_COND EXCHANGE DIAPHRAGM DIAPHRAGM LP LP 5 3 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
78 TERM_COND EXCHANGE TURBINE DIAPHRAGM LP LP 6 4 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
79 TERM_COND EXCHANGE DIAPHRAGM DIAPHRAGM LP LP 6 5 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
80 TERM_COND EXCHANGE DIAPHRAGM DIAPHRAGM LP LP 7 6 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
81 TERM_COND EXCHANGE TURBINE DIAPHRAGM LP LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
82 TERM_COND EXCHANGE ROTARY DIAPHRAGM LP LP 7 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
83 TERM_COND EXCHANGE DIAPHRAGM DIAPHRAGM LP LP 8 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
84 TERM_COND EXCHANGE TURBINE DIAPHRAGM LP LP 8 10 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
85 TERM_COND EXCHANGE ROTARY DIAPHRAGM LP LP 8 11 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
86 TERM_COND EXCHANGE DIAPHRAGM DIAPHRAGM MP MP 5 1 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND EXCHANGE ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
87 TERM_COND EXCHANGE TURBINE DIAPHRAGM MP MP 6 2 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND EXCHANGE DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88 TERM_COND EXCHANGE ROTARY DIAPHRAGM MP MP 7 3 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
89 TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
90 TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
91 TERM_COND EXCHANGE DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
92 TERM_COND EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
93 TERM_COND EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
94 TERM_COND EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
95 TERM_COND EXCHANGE DIAPHRAGM MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96 TERM_COND EXCHANGE DIAPHRAGM MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
97 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
99 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
100 TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
101 TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
102 TERM_COND EXCHANGE ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
103 TERM_COND EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
104 TERM_COND EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
105 TERM_COND EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
106 TERM_COND EXCHANGE ROTARY LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
107 TERM_COND EXCHANGE ROTARY LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
108 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
109 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
110 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
111 TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
112 TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
113 TERM_COND EXCHANGE ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
114 TERM_COND EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115 TERM_COND EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116 TERM_COND EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
117 TERM_COND EXCHANGE ROTARY MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
118 TERM_COND EXCHANGE ROTARY MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
119 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
120 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
121 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
122 TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
123 TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
124 TERM_COND EXCHANGE TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
125 TERM_COND EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126 TERM_COND EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
127 TERM_COND EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
128 TERM_COND EXCHANGE TURBINE LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
129 TERM_COND EXCHANGE TURBINE LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
130 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
131 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
132 TERM_COND EXCHANGE TURBINE TURBINE MP MP 7 3 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133 TERM_COND EXCHANGE DIAPHRAGM TURBINE MP MP 7 4 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
134 TERM_COND EXCHANGE DIAPHRAGM TURBINE MP MP 8 5 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
135 TERM_COND EXCHANGE ROTARY TURBINE MP MP 8 6 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
136 TERM_COND EXCHANGE TURBINE TURBINE MP MP 8 7 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
137 TERM_COND EXCHANGE DIAPHRAGM TURBINE MP MP 9 8 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
138 TERM_COND EXCHANGE ROTARY TURBINE MP MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
139 TERM_COND EXCHANGE TURBINE TURBINE MP MP 9 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
140 TERM_COND INSTALL EXCHANGE ROTARY TURBINE LP MP 1 11 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141 TERM_COND INSTALL TURBINE DIAPHRAGM LP LP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM LP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
142 TERM_COND INSTALL ROTARY DIAPHRAGM LP LP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
143 TERM_COND INSTALL TURBINE DIAPHRAGM MP LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
144 TERM_COND INSTALL ROTARY DIAPHRAGM MP LP 2 4 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
145 TERM_COND INSTALL TURBINE DIAPHRAGM MP LP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
146 TERM_COND INSTALL ROTARY DIAPHRAGM MP LP 3 6 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
147 TERM_COND INSTALL DIAPHRAGM DIAPHRAGM MP LP 3 7 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
148 TERM_COND INSTALL TURBINE DIAPHRAGM MP LP 4 8 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
149 TERM_COND INSTALL ROTARY DIAPHRAGM MP LP 4 9 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
150 TERM_COND OFMAT INSTALL ROTARY DIAPHRAGM MP MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
151 TERM_COND OFMAT INSTALL TURBINE DIAPHRAGM MP MP 1 2 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
152 TERM_COND REMOVE INSTALL ROTARY DIAPHRAGM LP MP 2 3 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
153 TERM_COND REMOVE INSTALL DIAPHRAGM DIAPHRAGM MP MP 1 4 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
154 TERM_COND REMOVE INSTALL ROTARY DIAPHRAGM MP MP 1 5 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
155 TERM_COND REMOVE INSTALL TURBINE DIAPHRAGM MP MP 1 6 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
156 TERM_COND STD EXCHANGE INSTALL ROTARY DIAPHRAGM LP MP 1 7 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
157 TERM_COND STD EXCHANGE INSTALL TURBINE DIAPHRAGM LP MP 1 8 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
158 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM DIAPHRAGM LP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
159 TERM_COND STD EXCHANGE INSTALL ROTARY ROTARY LP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
160 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
161 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP LP 2 3 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
162 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP LP 3 4 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
163 TERM_COND STD EXCHANGE INSTALL ROTARY ROTARY LP LP 3 5 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
164 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP LP 3 6 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
165 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP LP 4 7 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
166 TERM_COND STD EXCHANGE INSTALL DIAPHRAGM ROTARY LP LP 4 8 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
167 TERM_COND STD EXCHANGE INSTALL ROTARY ROTARY LP LP 4 9 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168 TERM_COND STD EXCHANGE INSTALL TURBINE ROTARY LP MP 5 1 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
169 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
170 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
171 TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
172 TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
173 TERM_COND INSTALL ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
174 TERM_COND INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
175 TERM_COND INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
176 TERM_COND INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
177 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
178 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
179 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
180 TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
181 TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
182 TERM_COND INSTALL TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
183 TERM_COND INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
184 TERM_COND INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
185 TERM_COND INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
186 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
187 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189 TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
190 TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
191 TERM_COND INSTALL TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
192 TERM_COND INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
193 TERM_COND INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
194 TERM_COND INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
195 TERM_COND STD EXCHANGE OFMAT ROTARY DIAPHRAGM LP LP 5 1 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
196 TERM_COND STD EXCHANGE OFMAT DIAPHRAGM DIAPHRAGM LP LP 5 2 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND STD EXCHANGE TURBINE LP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
197 TERM_COND STD EXCHANGE OFMAT ROTARY DIAPHRAGM LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
198 TERM_COND OFMAT DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
199 TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
200 TERM_COND OFMAT ROTARY LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
201 TERM_COND STD EXCHANGE OFMAT DIAPHRAGM ROTARY LP MP 6 1 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
202 TERM_COND OFMAT ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
203 TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
204 TERM_COND OFMAT TURBINE LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
205 TERM_COND STD EXCHANGE OFMAT TURBINE TURBINE LP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
206 TERM_COND STD EXCHANGE OFMAT DIAPHRAGM TURBINE LP MP 7 2 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
207 TERM_COND STD EXCHANGE REMOVE ROTARY DIAPHRAGM LP LP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
208 TERM_COND STD EXCHANGE REMOVE ROTARY DIAPHRAGM LP LP 8 2 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND STD EXCHANGE TURBINE LP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
209 TERM_COND STD EXCHANGE REMOVE DIAPHRAGM DIAPHRAGM LP LP 8 3 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
210 TERM_COND STD EXCHANGE REMOVE ROTARY DIAPHRAGM LP MP 9 1 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration. Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND STD EXCHANGE DIAPHRAGM LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD EXCHANGE TURBINE LP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
211 TERM_COND STD EXCHANGE REMOVE ROTARY DIAPHRAGM MP MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
212 TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
213 TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
214 TERM_COND REMOVE ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
215 TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
216 TERM_COND STD EXCHANGE REMOVE TURBINE ROTARY MP MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
217 TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
218 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
219 TERM_COND REMOVE TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
220 TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
221 TERM_COND STD EXCHANGE REMOVE DIAPHRAGM TURBINE MP MP 1 2 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
222 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
223 TERM_COND STD EXCHANGE DIAPHRAGM DIAPHRAGM MP LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
224 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM MP LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
225 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point. The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
226 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
227 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM MP LP 5 6 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
228 TERM_COND STD EXCHANGE DIAPHRAGM DIAPHRAGM MP LP 6 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
229 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP LP 6 8 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM MP LP 6 9 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231 TERM_COND STD EXCHANGE ROTARY DIAPHRAGM MP LP 7 10 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
232 TERM_COND STD EXCHANGE DIAPHRAGM DIAPHRAGM MP LP 7 11 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
233 TERM_COND STD EXCHANGE TURBINE DIAPHRAGM MP MP 7 1 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD EXCHANGE DIAPHRAGM MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE ROTARY MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE TURBINE MP 8 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND STD EXCHANGE DIAPHRAGM MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD EXCHANGE ROTARY MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD EXCHANGE TURBINE MP 9 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND STD INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
234 TERM_COND STD INSTALL STD EXCHANGE ROTARY DIAPHRAGM LP MP 5 2 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND STD INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
235 TERM_COND STD INSTALL STD EXCHANGE ROTARY DIAPHRAGM LP MP 6 3 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236 TERM_COND STD INSTALL STD EXCHANGE TURBINE DIAPHRAGM LP MP 6 4 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
237 TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
238 TERM_COND STD EXCHANGE DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
239 TERM_COND STD EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
240 TERM_COND STD EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
241 TERM_COND STD EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
242 TERM_COND STD EXCHANGE DIAPHRAGM MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
243 TERM_COND STD EXCHANGE DIAPHRAGM MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
244 TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
245 TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
246 TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
247 TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248 TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
249 TERM_COND STD EXCHANGE ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
250 TERM_COND STD EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
251 TERM_COND STD EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
252 TERM_COND STD EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
253 TERM_COND STD EXCHANGE ROTARY LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
254 TERM_COND STD EXCHANGE ROTARY LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
255 TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
256 TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
257 TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
258 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM ROTARY LP MP 6 4 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
259 TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
260 TERM_COND STD EXCHANGE ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
261 TERM_COND STD EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
262 TERM_COND STD EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
263 TERM_COND STD EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
264 TERM_COND STD EXCHANGE ROTARY MP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
265 TERM_COND STD EXCHANGE ROTARY MP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
266 TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
267 TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
268 TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
269 TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
270 TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
271 TERM_COND STD EXCHANGE TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
272 TERM_COND STD EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273 TERM_COND STD EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
274 TERM_COND STD EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
275 TERM_COND STD EXCHANGE TURBINE LP 10 Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
276 TERM_COND STD EXCHANGE TURBINE LP 11 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
277 TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
278 TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
279 TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
280 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM TURBINE LP MP 7 4 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
281 TERM_COND STD INSTALL STD EXCHANGE ROTARY TURBINE LP MP 7 5 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
282 TERM_COND STD INSTALL STD EXCHANGE TURBINE TURBINE LP MP 7 6 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
283 TERM_COND STD INSTALL STD EXCHANGE TURBINE TURBINE MP MP 1 7 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
284 TERM_COND STD INSTALL STD EXCHANGE ROTARY TURBINE MP MP 1 8 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
285 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM TURBINE MP MP 1 9 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order. This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
286 TERM_COND STD INSTALL STD EXCHANGE TURBINE TURBINE MP MP 2 10 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
287 TERM_COND STD INSTALL STD EXCHANGE DIAPHRAGM TURBINE MP MP 2 11 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
288 TERM_COND STD INSTALL ROTARY DIAPHRAGM MP LP 2 1 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed. Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND STD INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND STD INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND STD INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided. The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND STD INSTALL DIAPHRAGM MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL ROTARY MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL TURBINE MP 6 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND STD INSTALL TURBINE MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND STD INSTALL DIAPHRAGM MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND STD INSTALL ROTARY MP 7 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
289 TERM_COND STD REMOVE STD INSTALL DIAPHRAGM DIAPHRAGM LP LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging. Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
290 TERM_COND STD INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
291 TERM_COND STD INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
292 TERM_COND STD INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
293 TERM_COND STD INSTALL DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
294 TERM_COND STD INSTALL DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
295 TERM_COND STD INSTALL DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
296 TERM_COND STD INSTALL DIAPHRAGM LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
297 TERM_COND STD INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
298 TERM_COND STD INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
299 TERM_COND STD INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
300 TERM_COND STD INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
301 TERM_COND STD INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
302 TERM_COND STD INSTALL DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
303 TERM_COND STD INSTALL DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
304 TERM_COND STD INSTALL DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
305 TERM_COND STD INSTALL DIAPHRAGM MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
306 TERM_COND STD INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
307 TERM_COND STD INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
308 TERM_COND STD INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
309 TERM_COND STD INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
310 TERM_COND STD INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
311 TERM_COND STD INSTALL ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
312 TERM_COND STD INSTALL ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
313 TERM_COND STD INSTALL ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
314 TERM_COND STD INSTALL ROTARY LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
315 TERM_COND STD INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
316 TERM_COND STD INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
317 TERM_COND STD INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
318 TERM_COND STD INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
319 TERM_COND STD INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
320 TERM_COND STD INSTALL ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
321 TERM_COND STD INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
322 TERM_COND STD INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
323 TERM_COND STD INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
324 TERM_COND STD INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
325 TERM_COND STD INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
326 TERM_COND STD INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
327 TERM_COND STD INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
328 TERM_COND STD INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
329 TERM_COND STD INSTALL TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
330 TERM_COND STD INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
331 TERM_COND STD INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
332 TERM_COND STD INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
333 TERM_COND STD INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
334 TERM_COND STD INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
335 TERM_COND STD INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
336 TERM_COND STD INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
337 TERM_COND STD INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
338 TERM_COND STD INSTALL TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
339 TERM_COND STD INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
340 TERM_COND STD INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
341 TERM_COND STD INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
342 TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
343 TERM_COND STD REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
344 TERM_COND STD REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
345