"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","REMOVE","TURBINE","MP",1,"Purging of downstream pipework."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","DIAPHRAGM","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","ROTARY","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","LP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD EXCHANGE","TURBINE","MP",1,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","STD REMOVE","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. "
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","ADVERSARIAL","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described intable 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","OFMAT","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described intable 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
"
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described intable 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration."
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described intable 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",7,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
1
DOCUMENT_POSITION
ENTY_CODEJOB TYPE
METY_CODE
METER TYPE
SVCPT_CODE
SERVICE PRESSURE
SORT_ORDER
TEXT
CONT_SUM
ADVERSARIAL
TURBINE
LP
1
excluding lifting gear changes
CONT_SUM
ADVERSARIAL
DIAPHRAGM
LP
1
plus purging on time and materials basis.
2
CONT_SUM
ADVERSARIAL
ROTARY
DIAPHRAGM
LP
LP
1
excluding lifting gear changes
plus purging on time and materials basis.
CONT_SUM
ADVERSARIAL
TURBINE
LP
2
plus purging on time and materials basis.
CONT_SUM
ADVERSARIAL
ROTARY
LP
2
plus purging on time and materials basis.
CONT_SUM
ADVERSARIAL
DIAPHRAGM
MP
1
plus purging on time and materials basis.
CONT_SUM
ADVERSARIAL
ROTARY
MP
1
excluding lifting gear changes
3
CONT_SUM
ADVERSARIAL
TURBINE
DIAPHRAGM
MP
MP
1
excluding lifting gear changes
plus purging on time and materials basis.
4
CONT_SUM
ADVERSARIAL
ROTARY
ROTARY
MP
LP
21
plus purging on time and materials basis.excluding lifting gear changes
5
CONT_SUM
ADVERSARIAL
TURBINE
ROTARY
MP
LP
2
plus purging on time and materials basis.
6
CONT_SUM
STD REMOVEADVERSARIAL
DIAPHRAGM
ROTARY
LP
MP
1
plus purging on time and materials basis.excluding lifting gear changes
CONT_SUM_QA
ADVERSARIAL
ROTARY
LP
1
plus purging on time and materials basis.
7
CONT_SUM_QACONT_SUM
ADVERSARIAL
DIAPHRAGM
ROTARY
LP
MP
12
plus purging on time and materials basis.
8
CONT_SUM
ADVERSARIAL
TURBINE
LP
1
excluding lifting gear changes
9
CONT_SUM
ADVERSARIAL
TURBINE
LP
2
plus purging on time and materials basis.
10
CONT_SUM
ADVERSARIAL
TURBINE
MP
1
excluding lifting gear changes
11
CONT_SUM_QACONT_SUM
ADVERSARIAL
TURBINE
TURBINE
LP
MP
12
plus purging on time and materials basis.
12
CONT_SUM_QACONT_SUM
ADVERSARIALSTD REMOVE
TURBINE
DIAPHRAGM
MP
LP
1
plus purging on time and materials basis.
CONT_SUM_QA
ADVERSARIAL
DIAPHRAGM
MP
1
plus purging on time and materials basis.
13
CONT_SUM_QA
ADVERSARIAL
ROTARY
DIAPHRAGM
MP
LP
1
plus purging on time and materials basis.
14
CONT_SUM_QA
ADVERSARIAL
DIAPHRAGM
MP
1
plus purging on time and materials basis.
15
CONT_SUM_QA
ADVERSARIAL
ROTARY
LP
1
plus purging on time and materials basis.
16
CONT_SUM_QA
ADVERSARIAL
ROTARY
MP
1
plus purging on time and materials basis.
17
CONT_SUM_QA
STD REMOVEADVERSARIAL
DIAPHRAGM
TURBINE
LP
LP
1
plus purging on time and materials basis.
18
DESC_WORKCONT_SUM_QA
ADVERSARIAL
DIAPHRAGM
TURBINE
LP
MP
1
Purging of downstream pipework.plus purging on time and materials basis.
DESC_WORK
ADVERSARIAL
TURBINE
LP
1
Purging of downstream pipework.
DESC_WORK
ADVERSARIAL
ROTARY
LP
1
Purging of downstream pipework.
19
DESC_WORKCONT_SUM_QA
ADVERSARIALSTD REMOVE
DIAPHRAGM
DIAPHRAGM
MP
LP
1
Purging of downstream pipework.plus purging on time and materials basis.
20
DESC_WORK
ADVERSARIAL
ROTARY
DIAPHRAGM
MP
LP
1
Purging of downstream pipework.
DESC_WORK
ADVERSARIAL
TURBINE
MP
1
Purging of downstream pipework.
DESC_WORK
EXCHANGE
ROTARY
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
21
DESC_WORK
EXCHANGEADVERSARIAL
DIAPHRAGM
DIAPHRAGM
LP
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
22
DESC_WORK
ADVERSARIAL
ROTARY
LP
1
Purging of downstream pipework.
23
DESC_WORK
EXCHANGEADVERSARIAL
TURBINE
ROTARY
LP
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
24
DESC_WORK
ADVERSARIAL
TURBINE
LP
1
Purging of downstream pipework.
25
DESC_WORK
EXCHANGEADVERSARIAL
ROTARY
TURBINE
MP
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
DESC_WORK
EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
26
DESC_WORK
EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
TURBINE
LP
1
Purging of downstream pipework.
DESC_WORK
REMOVE
ROTARY
LP
1
Purging of downstream pipework.
27
DESC_WORK
REMOVEEXCHANGE
ROTARY
DIAPHRAGM
MP
MP
1
Purging of downstream pipework.Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
28
DESC_WORK
EXCHANGE
ROTARY
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
29
DESC_WORK
EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
30
DESC_WORK
EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
31
DESC_WORK
EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
32
DESC_WORK
REMOVE
DIAPHRAGM
DIAPHRAGM
MP
LP
1
Purging of downstream pipework.
33
DESC_WORK
REMOVE
TURBINE
DIAPHRAGM
MP
MP
1
Purging of downstream pipework.
34
DESC_WORK
STD EXCHANGEREMOVE
TURBINE
ROTARY
LP
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
35
DESC_WORK
STD EXCHANGEREMOVE
DIAPHRAGM
ROTARY
LP
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
36
DESC_WORK
STD EXCHANGEREMOVE
ROTARY
TURBINE
LP
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
37
DESC_WORK
STD EXCHANGEREMOVE
TURBINE
TURBINE
MP
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.Purging of downstream pipework.
DESC_WORK
STD EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
38
DESC_WORK
STD EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK
STD REMOVE
DIAPHRAGM
LP
1
Purging of downstream pipework.
TERM_COND
ADDON
DIAPHRAGM
LP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
TURBINE
LP
1
This quotation is based on there being a working LF connection on the existing meter.
39
TERM_CONDDESC_WORK
ADDONSTD EXCHANGE
ROTARY
DIAPHRAGM
LP
MP
1
This quotation is based on there being a working LF connection on the existing meter.Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
40
DESC_WORK
STD EXCHANGE
ROTARY
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
41
DESC_WORK
STD EXCHANGE
ROTARY
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
42
DESC_WORK
STD EXCHANGE
TURBINE
LP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
43
DESC_WORK
STD EXCHANGE
TURBINE
MP
1
Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
44
TERM_CONDDESC_WORK
ADDONSTD REMOVE
DIAPHRAGM
DIAPHRAGM
LP
LP
21
This quotation does not include for the provision of a separate instrumentation cabinet.Purging of downstream pipework.
45
TERM_COND
ADDON
TURBINE
DIAPHRAGM
LP
LP
21
This quotation does not include for the provision of a separate instrumentation cabinet.This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
ROTARY
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
TURBINE
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
46
TERM_COND
ADDON
ROTARY
DIAPHRAGM
LP
LP
32
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
DIAPHRAGM
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
DIAPHRAGM
MP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
ROTARY
MP
1
This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
TURBINE
MP
1
This quotation is based on there being a working LF connection on the existing meter.
47
TERM_COND
ADDON
ROTARY
DIAPHRAGM
MP
LP
23
This quotation does not include for the provision of a separate instrumentation cabinet.Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
48
TERM_COND
ADDON
DIAPHRAGM
DIAPHRAGM
MP
MP
21
This quotation does not include for the provision of a separate instrumentation cabinet.This quotation is based on there being a working LF connection on the existing meter.
TERM_COND
ADDON
TURBINE
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADDON
DIAPHRAGM
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND
ADDON
ROTARY
MP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
49
TERM_COND
ADDON
TURBINE
DIAPHRAGM
MP
MP
32
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND
ADVERSARIAL
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
50
TERM_COND
ADVERSARIALADDON
TURBINE
DIAPHRAGM
LP
MP
13
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
51
TERM_COND
ADDON
ROTARY
LP
1
This quotation is based on there being a working LF connection on the existing meter.
52
TERM_COND
ADDON
ROTARY
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
53
TERM_COND
ADDON
ROTARY
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
54
TERM_COND
ADDON
ROTARY
MP
1
This quotation is based on there being a working LF connection on the existing meter.
55
TERM_COND
ADDON
ROTARY
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
56
TERM_COND
ADVERSARIALADDON
ROTARY
ROTARY
LP
MP
13
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
57
TERM_COND
ADDON
TURBINE
LP
1
This quotation is based on there being a working LF connection on the existing meter.
58
TERM_COND
ADDON
TURBINE
LP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
59
TERM_COND
ADDON
TURBINE
LP
3
Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
60
TERM_COND
ADDON
TURBINE
MP
1
This quotation is based on there being a working LF connection on the existing meter.
61
TERM_COND
ADDON
TURBINE
MP
2
This quotation does not include for the provision of a separate instrumentation cabinet.
62
TERM_COND
ADVERSARIALADDON
TURBINE
TURBINE
LP
MP
23
Lifting gear if required will be charged at a rate of 400 per day.Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
63
TERM_COND
ADVERSARIAL
ROTARY
DIAPHRAGM
LP
LP
21
Lifting gear if required will be charged at a rate of 400 per day.This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
64
TERM_COND
ADVERSARIAL
ROTARY
DIAPHRAGM
MP
LP
12
Lifting gear if required will be charged at a rate of 400 per day.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
ADVERSARIAL
TURBINE
MP
1
Lifting gear if required will be charged at a rate of 400 per day.
65
TERM_COND
EXCHANGEADVERSARIAL
TURBINE
ROTARY
LP
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
66
TERM_COND
EXCHANGEADVERSARIAL
DIAPHRAGM
ROTARY
LP
LP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.Lifting gear if required will be charged at a rate of 400 per day.
67
TERM_COND
ADVERSARIAL
ROTARY
LP
3
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
68
TERM_COND
EXCHANGEADVERSARIAL
ROTARY
ROTARY
LP
MP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Lifting gear if required will be charged at a rate of 400 per day.
69
TERM_COND
ADVERSARIAL
ROTARY
MP
2
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
70
TERM_COND
ADVERSARIAL
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
71
TERM_COND
ADVERSARIAL
TURBINE
LP
2
Lifting gear if required will be charged at a rate of 400 per day.
72
TERM_COND
ADVERSARIAL
TURBINE
LP
3
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
73
TERM_COND
EXCHANGEADVERSARIAL
TURBINE
TURBINE
LP
MP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..Lifting gear if required will be charged at a rate of 400 per day.
74
TERM_COND
EXCHANGEADVERSARIAL
DIAPHRAGM
TURBINE
LP
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
75
TERM_COND
EXCHANGE
TURBINE
DIAPHRAGM
LP
LP
31
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
76
TERM_COND
EXCHANGE
ROTARY
DIAPHRAGM
LP
LP
42
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
77
TERM_COND
EXCHANGE
DIAPHRAGM
DIAPHRAGM
LP
LP
53
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
78
TERM_COND
EXCHANGE
TURBINE
DIAPHRAGM
LP
LP
64
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
79
TERM_COND
EXCHANGE
DIAPHRAGM
DIAPHRAGM
LP
LP
65
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
80
TERM_COND
EXCHANGE
DIAPHRAGM
DIAPHRAGM
LP
LP
76
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
81
TERM_COND
EXCHANGE
TURBINE
DIAPHRAGM
LP
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
82
TERM_COND
EXCHANGE
ROTARY
DIAPHRAGM
LP
LP
78
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
83
TERM_COND
EXCHANGE
DIAPHRAGM
DIAPHRAGM
LP
LP
89
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
84
TERM_COND
EXCHANGE
TURBINE
DIAPHRAGM
LP
LP
810
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
85
TERM_COND
EXCHANGE
ROTARY
DIAPHRAGM
LP
LP
811
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
EXCHANGE
TURBINE
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
ROTARY
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
DIAPHRAGM
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
EXCHANGE
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
86
TERM_COND
EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
MP
51
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
EXCHANGE
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
EXCHANGE
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
87
TERM_COND
EXCHANGE
TURBINE
DIAPHRAGM
MP
MP
62
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
EXCHANGE
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
88
TERM_COND
EXCHANGE
ROTARY
DIAPHRAGM
MP
MP
73
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
89
TERM_COND
EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
90
TERM_COND
EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
91
TERM_COND
EXCHANGE
DIAPHRAGM
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
92
TERM_COND
EXCHANGE
DIAPHRAGM
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
93
TERM_COND
EXCHANGE
DIAPHRAGM
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
94
TERM_COND
EXCHANGE
DIAPHRAGM
MP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
95
TERM_COND
EXCHANGE
DIAPHRAGM
MP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
96
TERM_COND
EXCHANGE
DIAPHRAGM
MP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
97
TERM_COND
EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
98
TERM_COND
EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
99
TERM_COND
EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
100
TERM_COND
EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
101
TERM_COND
EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
102
TERM_COND
EXCHANGE
ROTARY
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
103
TERM_COND
EXCHANGE
ROTARY
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
104
TERM_COND
EXCHANGE
ROTARY
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
105
TERM_COND
EXCHANGE
ROTARY
LP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
106
TERM_COND
EXCHANGE
ROTARY
LP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
107
TERM_COND
EXCHANGE
ROTARY
LP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
108
TERM_COND
EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
109
TERM_COND
EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
110
TERM_COND
EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
111
TERM_COND
EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
112
TERM_COND
EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
113
TERM_COND
EXCHANGE
ROTARY
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
114
TERM_COND
EXCHANGE
ROTARY
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
115
TERM_COND
EXCHANGE
ROTARY
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
116
TERM_COND
EXCHANGE
ROTARY
MP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
117
TERM_COND
EXCHANGE
ROTARY
MP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
118
TERM_COND
EXCHANGE
ROTARY
MP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
119
TERM_COND
EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
120
TERM_COND
EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
121
TERM_COND
EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
122
TERM_COND
EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
123
TERM_COND
EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
124
TERM_COND
EXCHANGE
TURBINE
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
125
TERM_COND
EXCHANGE
TURBINE
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126
TERM_COND
EXCHANGE
TURBINE
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
127
TERM_COND
EXCHANGE
TURBINE
LP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
128
TERM_COND
EXCHANGE
TURBINE
LP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
129
TERM_COND
EXCHANGE
TURBINE
LP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
130
TERM_COND
EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
131
TERM_COND
EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
132
TERM_COND
EXCHANGE
TURBINE
TURBINE
MP
MP
73
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
133
TERM_COND
EXCHANGE
DIAPHRAGM
TURBINE
MP
MP
74
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
134
TERM_COND
EXCHANGE
DIAPHRAGM
TURBINE
MP
MP
85
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
135
TERM_COND
EXCHANGE
ROTARY
TURBINE
MP
MP
86
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
136
TERM_COND
EXCHANGE
TURBINE
TURBINE
MP
MP
87
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
137
TERM_COND
EXCHANGE
DIAPHRAGM
TURBINE
MP
MP
98
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
138
TERM_COND
EXCHANGE
ROTARY
TURBINE
MP
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
139
TERM_COND
EXCHANGE
TURBINE
TURBINE
MP
MP
910
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
140
TERM_COND
INSTALLEXCHANGE
ROTARY
TURBINE
LP
MP
111
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
INSTALL
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
INSTALL
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
ROTARY
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
141
TERM_COND
INSTALL
TURBINE
DIAPHRAGM
LP
LP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
LP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
142
TERM_COND
INSTALL
ROTARY
DIAPHRAGM
LP
LP
72
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
INSTALL
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
INSTALL
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
143
TERM_COND
INSTALL
TURBINE
DIAPHRAGM
MP
LP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
144
TERM_COND
INSTALL
ROTARY
DIAPHRAGM
MP
LP
24
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
145
TERM_COND
INSTALL
TURBINE
DIAPHRAGM
MP
LP
35
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
146
TERM_COND
INSTALL
ROTARY
DIAPHRAGM
MP
LP
36
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
147
TERM_COND
INSTALL
DIAPHRAGM
DIAPHRAGM
MP
LP
37
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
148
TERM_COND
INSTALL
TURBINE
DIAPHRAGM
MP
LP
48
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
149
TERM_COND
INSTALL
ROTARY
DIAPHRAGM
MP
LP
49
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
INSTALL
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
INSTALL
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
INSTALL
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
INSTALL
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
OFMAT
DIAPHRAGM
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
ROTARY
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
TURBINE
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND
OFMAT
DIAPHRAGM
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
150
TERM_COND
OFMATINSTALL
ROTARY
DIAPHRAGM
MP
MP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
151
TERM_COND
OFMATINSTALL
TURBINE
DIAPHRAGM
MP
MP
12
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
REMOVE
ROTARY
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND
REMOVE
DIAPHRAGM
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
152
TERM_COND
REMOVEINSTALL
ROTARY
DIAPHRAGM
LP
MP
23
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
153
TERM_COND
REMOVEINSTALL
DIAPHRAGM
DIAPHRAGM
MP
MP
14
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
154
TERM_COND
REMOVEINSTALL
ROTARY
DIAPHRAGM
MP
MP
15
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
155
TERM_COND
REMOVEINSTALL
TURBINE
DIAPHRAGM
MP
MP
16
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
156
TERM_COND
STD EXCHANGEINSTALL
ROTARY
DIAPHRAGM
LP
MP
17
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
157
TERM_COND
STD EXCHANGEINSTALL
TURBINE
DIAPHRAGM
LP
MP
18
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
158
TERM_COND
STD EXCHANGEINSTALL
DIAPHRAGM
DIAPHRAGM
LP
MP
19
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
159
TERM_COND
STD EXCHANGEINSTALL
ROTARY
ROTARY
LP
LP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
160
TERM_COND
STD EXCHANGEINSTALL
DIAPHRAGM
ROTARY
LP
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
161
TERM_COND
STD EXCHANGEINSTALL
TURBINE
ROTARY
LP
LP
23
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
162
TERM_COND
STD EXCHANGEINSTALL
DIAPHRAGM
ROTARY
LP
LP
34
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
163
TERM_COND
STD EXCHANGEINSTALL
ROTARY
ROTARY
LP
LP
35
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
164
TERM_COND
STD EXCHANGEINSTALL
TURBINE
ROTARY
LP
LP
36
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
165
TERM_COND
STD EXCHANGEINSTALL
TURBINE
ROTARY
LP
LP
47
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
166
TERM_COND
STD EXCHANGEINSTALL
DIAPHRAGM
ROTARY
LP
LP
48
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
167
TERM_COND
STD EXCHANGEINSTALL
ROTARY
ROTARY
LP
LP
49
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
168
TERM_COND
STD EXCHANGEINSTALL
TURBINE
ROTARY
LP
MP
51
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
169
TERM_COND
INSTALL
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
170
TERM_COND
INSTALL
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
171
TERM_COND
INSTALL
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
172
TERM_COND
INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
173
TERM_COND
INSTALL
ROTARY
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
174
TERM_COND
INSTALL
ROTARY
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
175
TERM_COND
INSTALL
ROTARY
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
176
TERM_COND
INSTALL
ROTARY
MP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
177
TERM_COND
INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
178
TERM_COND
INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
179
TERM_COND
INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
180
TERM_COND
INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
181
TERM_COND
INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
182
TERM_COND
INSTALL
TURBINE
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
183
TERM_COND
INSTALL
TURBINE
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
184
TERM_COND
INSTALL
TURBINE
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
185
TERM_COND
INSTALL
TURBINE
LP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
186
TERM_COND
INSTALL
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
187
TERM_COND
INSTALL
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
188
TERM_COND
INSTALL
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
189
TERM_COND
INSTALL
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
190
TERM_COND
INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
191
TERM_COND
INSTALL
TURBINE
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
192
TERM_COND
INSTALL
TURBINE
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
193
TERM_COND
INSTALL
TURBINE
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
194
TERM_COND
INSTALL
TURBINE
MP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
195
TERM_COND
STD EXCHANGEOFMAT
ROTARY
DIAPHRAGM
LP
LP
51
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
196
TERM_COND
STD EXCHANGEOFMAT
DIAPHRAGM
DIAPHRAGM
LP
LP
52
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND
STD EXCHANGE
TURBINE
LP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
197
TERM_COND
STD EXCHANGEOFMAT
ROTARY
DIAPHRAGM
LP
MP
61
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
198
TERM_COND
OFMAT
DIAPHRAGM
MP
2
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
199
TERM_COND
OFMAT
ROTARY
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
200
TERM_COND
OFMAT
ROTARY
LP
2
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
201
TERM_COND
STD EXCHANGEOFMAT
DIAPHRAGM
ROTARY
LP
MP
61
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
202
TERM_COND
OFMAT
ROTARY
MP
2
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
203
TERM_COND
OFMAT
TURBINE
LP
1
This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
204
TERM_COND
OFMAT
TURBINE
LP
2
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
205
TERM_COND
STD EXCHANGEOFMAT
TURBINE
TURBINE
LP
MP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
206
TERM_COND
STD EXCHANGEOFMAT
DIAPHRAGM
TURBINE
LP
MP
72
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
207
TERM_COND
STD EXCHANGEREMOVE
ROTARY
DIAPHRAGM
LP
LP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
208
TERM_COND
STD EXCHANGEREMOVE
ROTARY
DIAPHRAGM
LP
LP
82
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
STD EXCHANGE
TURBINE
LP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
209
TERM_COND
STD EXCHANGEREMOVE
DIAPHRAGM
DIAPHRAGM
LP
LP
83
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
210
TERM_COND
STD EXCHANGEREMOVE
ROTARY
DIAPHRAGM
LP
MP
91
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND
STD EXCHANGE
DIAPHRAGM
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
STD EXCHANGE
TURBINE
LP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
211
TERM_COND
STD EXCHANGEREMOVE
ROTARY
DIAPHRAGM
MP
MP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
212
TERM_COND
REMOVE
ROTARY
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
213
TERM_COND
REMOVE
ROTARY
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
214
TERM_COND
REMOVE
ROTARY
LP
3
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
215
TERM_COND
REMOVE
ROTARY
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
216
TERM_COND
STD EXCHANGEREMOVE
TURBINE
ROTARY
MP
MP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
217
TERM_COND
REMOVE
TURBINE
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
218
TERM_COND
REMOVE
TURBINE
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
219
TERM_COND
REMOVE
TURBINE
LP
3
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
220
TERM_COND
REMOVE
TURBINE
MP
1
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
221
TERM_COND
STD EXCHANGEREMOVE
DIAPHRAGM
TURBINE
MP
MP
12
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
222
TERM_COND
STD EXCHANGE
TURBINE
DIAPHRAGM
MP
LP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
223
TERM_COND
STD EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
224
TERM_COND
STD EXCHANGE
ROTARY
DIAPHRAGM
MP
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
225
TERM_COND
STD EXCHANGE
TURBINE
DIAPHRAGM
MP
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
226
TERM_COND
STD EXCHANGE
TURBINE
DIAPHRAGM
MP
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
227
TERM_COND
STD EXCHANGE
ROTARY
DIAPHRAGM
MP
LP
56
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
228
TERM_COND
STD EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
LP
67
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
229
TERM_COND
STD EXCHANGE
TURBINE
DIAPHRAGM
MP
LP
68
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
230
TERM_COND
STD EXCHANGE
ROTARY
DIAPHRAGM
MP
LP
69
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
231
TERM_COND
STD EXCHANGE
ROTARY
DIAPHRAGM
MP
LP
710
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
232
TERM_COND
STD EXCHANGE
DIAPHRAGM
DIAPHRAGM
MP
LP
711
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
233
TERM_COND
STD EXCHANGE
TURBINE
DIAPHRAGM
MP
MP
71
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
STD EXCHANGE
ROTARY
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
STD EXCHANGE
TURBINE
MP
8
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
STD EXCHANGE
ROTARY
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
STD EXCHANGE
TURBINE
MP
9
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
TERM_COND
STD INSTALL
DIAPHRAGM
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD INSTALL
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD INSTALL
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD INSTALL
DIAPHRAGM
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD INSTALL
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND
STD INSTALL
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
234
TERM_COND
STD INSTALLSTD EXCHANGE
ROTARY
DIAPHRAGM
LP
MP
52
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND
STD INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD INSTALL
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
235
TERM_COND
STD INSTALLSTD EXCHANGE
ROTARY
DIAPHRAGM
LP
MP
63
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236
TERM_COND
STD INSTALLSTD EXCHANGE
TURBINE
DIAPHRAGM
LP
MP
64
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
237
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
238
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
239
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
240
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
241
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
242
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
243
TERM_COND
STD EXCHANGE
DIAPHRAGM
MP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
244
TERM_COND
STD EXCHANGE
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
245
TERM_COND
STD EXCHANGE
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
246
TERM_COND
STD EXCHANGE
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
247
TERM_COND
STD EXCHANGE
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
248
TERM_COND
STD EXCHANGE
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
249
TERM_COND
STD EXCHANGE
ROTARY
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
250
TERM_COND
STD EXCHANGE
ROTARY
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
251
TERM_COND
STD EXCHANGE
ROTARY
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
252
TERM_COND
STD EXCHANGE
ROTARY
LP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
253
TERM_COND
STD EXCHANGE
ROTARY
LP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
254
TERM_COND
STD EXCHANGE
ROTARY
LP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
255
TERM_COND
STD EXCHANGE
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
256
TERM_COND
STD EXCHANGE
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
257
TERM_COND
STD EXCHANGE
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
258
TERM_COND
STD INSTALLSTD EXCHANGE
DIAPHRAGM
ROTARY
LP
MP
64
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
259
TERM_COND
STD EXCHANGE
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
260
TERM_COND
STD EXCHANGE
ROTARY
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
261
TERM_COND
STD EXCHANGE
ROTARY
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
262
TERM_COND
STD EXCHANGE
ROTARY
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
263
TERM_COND
STD EXCHANGE
ROTARY
MP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
264
TERM_COND
STD EXCHANGE
ROTARY
MP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
265
TERM_COND
STD EXCHANGE
ROTARY
MP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
266
TERM_COND
STD EXCHANGE
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
267
TERM_COND
STD EXCHANGE
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
268
TERM_COND
STD EXCHANGE
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
269
TERM_COND
STD EXCHANGE
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
270
TERM_COND
STD EXCHANGE
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
271
TERM_COND
STD EXCHANGE
TURBINE
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
272
TERM_COND
STD EXCHANGE
TURBINE
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
273
TERM_COND
STD EXCHANGE
TURBINE
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
274
TERM_COND
STD EXCHANGE
TURBINE
LP
9
This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
275
TERM_COND
STD EXCHANGE
TURBINE
LP
10
Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
276
TERM_COND
STD EXCHANGE
TURBINE
LP
11
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
277
TERM_COND
STD EXCHANGE
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
278
TERM_COND
STD EXCHANGE
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
279
TERM_COND
STD EXCHANGE
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
280
TERM_COND
STD INSTALLSTD EXCHANGE
DIAPHRAGM
TURBINE
LP
MP
74
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
281
TERM_COND
STD INSTALLSTD EXCHANGE
ROTARY
TURBINE
LP
MP
75
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
282
TERM_COND
STD INSTALLSTD EXCHANGE
TURBINE
TURBINE
LP
MP
76
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
283
TERM_COND
STD INSTALLSTD EXCHANGE
TURBINE
TURBINE
MP
MP
17
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
284
TERM_COND
STD INSTALLSTD EXCHANGE
ROTARY
TURBINE
MP
MP
18
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
285
TERM_COND
STD INSTALLSTD EXCHANGE
DIAPHRAGM
TURBINE
MP
MP
19
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
286
TERM_COND
STD INSTALLSTD EXCHANGE
TURBINE
TURBINE
MP
MP
210
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Please note that this quotation is based on two visits, first visit for the removal and purging of the existing meter module and the second to install a new meter module after the service alteration.
287
TERM_COND
STD INSTALLSTD EXCHANGE
DIAPHRAGM
TURBINE
MP
MP
211
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
288
TERM_COND
STD INSTALL
ROTARY
DIAPHRAGM
MP
LP
21
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND
STD INSTALL
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND
STD INSTALL
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
STD INSTALL
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
STD INSTALL
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND
STD INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD INSTALL
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily.
TERM_COND
STD INSTALL
DIAPHRAGM
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
STD INSTALL
ROTARY
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
STD INSTALL
TURBINE
MP
6
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND
STD INSTALL
TURBINE
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
STD INSTALL
DIAPHRAGM
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
STD INSTALL
ROTARY
MP
7
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND
STD REMOVE
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
289
TERM_COND
STD REMOVESTD INSTALL
DIAPHRAGM
DIAPHRAGM
LP
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
290
TERM_COND
STD INSTALL
DIAPHRAGM
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
291
TERM_COND
STD INSTALL
DIAPHRAGM
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
292
TERM_COND
STD INSTALL
DIAPHRAGM
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
293
TERM_COND
STD INSTALL
DIAPHRAGM
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
294
TERM_COND
STD INSTALL
DIAPHRAGM
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
295
TERM_COND
STD INSTALL
DIAPHRAGM
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
296
TERM_COND
STD INSTALL
DIAPHRAGM
LP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
297
TERM_COND
STD INSTALL
DIAPHRAGM
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
298
TERM_COND
STD INSTALL
DIAPHRAGM
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
299
TERM_COND
STD INSTALL
DIAPHRAGM
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
300
TERM_COND
STD INSTALL
DIAPHRAGM
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
301
TERM_COND
STD INSTALL
DIAPHRAGM
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
302
TERM_COND
STD INSTALL
DIAPHRAGM
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
303
TERM_COND
STD INSTALL
DIAPHRAGM
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
304
TERM_COND
STD INSTALL
DIAPHRAGM
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
305
TERM_COND
STD INSTALL
DIAPHRAGM
MP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
306
TERM_COND
STD INSTALL
ROTARY
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
307
TERM_COND
STD INSTALL
ROTARY
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
308
TERM_COND
STD INSTALL
ROTARY
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
309
TERM_COND
STD INSTALL
ROTARY
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
310
TERM_COND
STD INSTALL
ROTARY
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
311
TERM_COND
STD INSTALL
ROTARY
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
312
TERM_COND
STD INSTALL
ROTARY
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
313
TERM_COND
STD INSTALL
ROTARY
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
314
TERM_COND
STD INSTALL
ROTARY
LP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
315
TERM_COND
STD INSTALL
ROTARY
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
316
TERM_COND
STD INSTALL
ROTARY
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
317
TERM_COND
STD INSTALL
ROTARY
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
318
TERM_COND
STD INSTALL
ROTARY
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
319
TERM_COND
STD INSTALL
ROTARY
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
320
TERM_COND
STD INSTALL
ROTARY
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
321
TERM_COND
STD INSTALL
ROTARY
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
322
TERM_COND
STD INSTALL
ROTARY
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
323
TERM_COND
STD INSTALL
ROTARY
MP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
324
TERM_COND
STD INSTALL
TURBINE
LP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
325
TERM_COND
STD INSTALL
TURBINE
LP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
326
TERM_COND
STD INSTALL
TURBINE
LP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
327
TERM_COND
STD INSTALL
TURBINE
LP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
328
TERM_COND
STD INSTALL
TURBINE
LP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
329
TERM_COND
STD INSTALL
TURBINE
LP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
330
TERM_COND
STD INSTALL
TURBINE
LP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
331
TERM_COND
STD INSTALL
TURBINE
LP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
332
TERM_COND
STD INSTALL
TURBINE
LP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
333
TERM_COND
STD INSTALL
TURBINE
MP
1
Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
334
TERM_COND
STD INSTALL
TURBINE
MP
2
Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
335
TERM_COND
STD INSTALL
TURBINE
MP
3
Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
336
TERM_COND
STD INSTALL
TURBINE
MP
4
The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
337
TERM_COND
STD INSTALL
TURBINE
MP
5
This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
338
TERM_COND
STD INSTALL
TURBINE
MP
6
The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
339
TERM_COND
STD INSTALL
TURBINE
MP
7
It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
340
TERM_COND
STD INSTALL
TURBINE
MP
8
The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
341
TERM_COND
STD INSTALL
TURBINE
MP
9
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
342
TERM_COND
STD REMOVE
DIAPHRAGM
LP
1
This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
343
TERM_COND
STD REMOVE
DIAPHRAGM
LP
2
Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
344
TERM_COND
STD REMOVE
DIAPHRAGM
LP
3
This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.