CSV files created from data received at GL Noble Denton 16:48 on Tuesday 20th March 2012

git-svn-id: http://locode01.ad.dom/svn/WEBMIP/trunk@51042 248e525c-4dfb-0310-94bc-949c084e9493
This commit is contained in:
andrew.gilmore
2012-03-21 12:33:14 +00:00
parent ae40d1b14a
commit 55b30d8c94
4 changed files with 745 additions and 741 deletions

View File

@@ -1,433 +1,433 @@
DOCUMENT_POSITION,JOB TYPE,METER TYPE,SERVICE PRESSURE,SORT_ORDER,TEXT
CONT_SUM,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,DIAPHRAGM,MP,2,excluding lifting gear charges
CONT_SUM,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,LP,2,excluding lifting gear charges
CONT_SUM,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,ROTARY,MP,2,excluding lifting gear charges
CONT_SUM,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,LP,2,excluding lifting gear charges
CONT_SUM,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM,ADVERSARIAL,TURBINE,MP,2,excluding lifting gear charges
CONT_SUM,EXCHANGE,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM,EXCHANGE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM,EXCHANGE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM,EXCHANGE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM,EXCHANGE,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM,INSTALL,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM,INSTALL,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM,INSTALL,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM,INSTALL,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM,INSTALL,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM,REMOVE,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,REMOVE,DIAPHRAGM,MP,2,excluding lifting gear charges
CONT_SUM,STD EXCHANGE,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM,STD EXCHANGE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM,STD EXCHANGE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM,STD EXCHANGE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM,STD EXCHANGE,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM,STD INSTALL,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM,STD INSTALL,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM,STD INSTALL,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM,STD INSTALL,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM,STD INSTALL,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,DIAPHRAGM,MP,2,excluding lifting gear charges
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,LP,2,excluding lifting gear charges
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,ROTARY,MP,2,excluding lifting gear charges
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,LP,2,excluding lifting gear charges
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,1,plus purging on time and materials basis.
CONT_SUM_QA,ADVERSARIAL,TURBINE,MP,2,excluding lifting gear charges
CONT_SUM_QA,EXCHANGE,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM_QA,EXCHANGE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,EXCHANGE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,EXCHANGE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,EXCHANGE,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM_QA,INSTALL,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM_QA,INSTALL,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,INSTALL,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,INSTALL,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,INSTALL,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM_QA,REMOVE,DIAPHRAGM,MP,2,excluding lifting gear charges
CONT_SUM_QA,STD EXCHANGE,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD EXCHANGE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD EXCHANGE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD EXCHANGE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD EXCHANGE,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD INSTALL,DIAPHRAGM,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD INSTALL,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD INSTALL,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD INSTALL,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD INSTALL,TURBINE,MP,1,excluding lifting gear charges
DESC_WORK,ADVERSARIAL,DIAPHRAGM,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,DIAPHRAGM,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,ROTARY,MP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,LP,1,Purging of downstream pipework.
DESC_WORK,ADVERSARIAL,TURBINE,MP,1,Purging of downstream pipework.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,11,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,EXCHANGE,ROTARY,LP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,EXCHANGE,ROTARY,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,EXCHANGE,TURBINE,LP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,EXCHANGE,TURBINE,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
DESC_WORK,REMOVE,ROTARY,LP,2,excluding lifting gear charges
DESC_WORK,REMOVE,ROTARY,MP,2,excluding lifting gear charges
DESC_WORK,REMOVE,TURBINE,LP,2,excluding lifting gear charges
DESC_WORK,REMOVE,TURBINE,MP,2,excluding lifting gear charges
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,11,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,STD EXCHANGE,ROTARY,LP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,STD EXCHANGE,ROTARY,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,STD EXCHANGE,TURBINE,LP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,STD EXCHANGE,TURBINE,MP,12,Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
TERM_COND,ADDON,DIAPHRAGM,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,DIAPHRAGM,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,DIAPHRAGM,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,DIAPHRAGM,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,ROTARY,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,ROTARY,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,ROTARY,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,LP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,LP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,LP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADDON,TURBINE,MP,1,This quotation is based on there being a working LF connection on the existing meter.
TERM_COND,ADDON,TURBINE,MP,2,This quotation does not include for the provision of a separate instrumentation cabinet.
TERM_COND,ADDON,TURBINE,MP,3,Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,ADVERSARIAL,DIAPHRAGM,LP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,ADVERSARIAL,ROTARY,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,ADVERSARIAL,ROTARY,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,ADVERSARIAL,ROTARY,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,ROTARY,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,ADVERSARIAL,TURBINE,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,ADVERSARIAL,TURBINE,LP,2,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,ADVERSARIAL,TURBINE,MP,1,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,ADVERSARIAL,TURBINE,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,DIAPHRAGM,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,9,This quotation is based on two visits, one to remove the exisiting meter, and one to install the new meter.
TERM_COND,EXCHANGE,DIAPHRAGM,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,DIAPHRAGM,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,DIAPHRAGM,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,DIAPHRAGM,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,ROTARY,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,ROTARY,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,LP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,ROTARY,LP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,ROTARY,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,ROTARY,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,ROTARY,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,ROTARY,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,ROTARY,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,ROTARY,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,ROTARY,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
TERM_COND,EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,TURBINE,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,TURBINE,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,TURBINE,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,LP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,TURBINE,LP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,EXCHANGE,TURBINE,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,EXCHANGE,TURBINE,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,EXCHANGE,TURBINE,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,EXCHANGE,TURBINE,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,EXCHANGE,TURBINE,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,EXCHANGE,TURBINE,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,EXCHANGE,TURBINE,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,DIAPHRAGM,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,DIAPHRAGM,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,DIAPHRAGM,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,DIAPHRAGM,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,DIAPHRAGM,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,DIAPHRAGM,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,DIAPHRAGM,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,DIAPHRAGM,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,DIAPHRAGM,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,ROTARY,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,ROTARY,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,ROTARY,LP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,ROTARY,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,ROTARY,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,ROTARY,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,ROTARY,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,ROTARY,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,ROTARY,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,TURBINE,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,TURBINE,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,TURBINE,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,TURBINE,LP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,INSTALL,TURBINE,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,INSTALL,TURBINE,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,INSTALL,TURBINE,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,INSTALL,TURBINE,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,INSTALL,TURBINE,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,INSTALL,TURBINE,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,OFMAT,DIAPHRAGM,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,LP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,OFMAT,DIAPHRAGM,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,DIAPHRAGM,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,OFMAT,ROTARY,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,LP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,OFMAT,ROTARY,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,ROTARY,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,OFMAT,TURBINE,LP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,LP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,OFMAT,TURBINE,MP,1,This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
TERM_COND,OFMAT,TURBINE,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,DIAPHRAGM,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,REMOVE,DIAPHRAGM,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,DIAPHRAGM,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,DIAPHRAGM,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,DIAPHRAGM,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,DIAPHRAGM,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,REMOVE,ROTARY,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,REMOVE,ROTARY,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,ROTARY,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,ROTARY,LP,4,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,REMOVE,ROTARY,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,ROTARY,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,ROTARY,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,REMOVE,TURBINE,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,REMOVE,TURBINE,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,TURBINE,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,TURBINE,LP,4,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,REMOVE,TURBINE,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,REMOVE,TURBINE,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,REMOVE,TURBINE,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,DIAPHRAGM,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD EXCHANGE,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,ROTARY,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,ROTARY,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,LP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,ROTARY,LP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD EXCHANGE,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,ROTARY,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,ROTARY,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,ROTARY,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,ROTARY,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,ROTARY,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,ROTARY,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,ROTARY,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD EXCHANGE,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,TURBINE,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,TURBINE,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,LP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,LP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,TURBINE,LP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD EXCHANGE,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD EXCHANGE,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD EXCHANGE,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD EXCHANGE,TURBINE,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD EXCHANGE,TURBINE,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD EXCHANGE,TURBINE,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD EXCHANGE,TURBINE,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD EXCHANGE,TURBINE,MP,9,This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
TERM_COND,STD EXCHANGE,TURBINE,MP,10,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD EXCHANGE,TURBINE,MP,11,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,DIAPHRAGM,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,DIAPHRAGM,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,DIAPHRAGM,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,DIAPHRAGM,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,DIAPHRAGM,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD INSTALL,ROTARY,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,ROTARY,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,ROTARY,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,ROTARY,LP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD INSTALL,ROTARY,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,ROTARY,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,ROTARY,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,ROTARY,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,ROTARY,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,ROTARY,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,ROTARY,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,ROTARY,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,ROTARY,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD INSTALL,TURBINE,LP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,LP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,LP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,LP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,TURBINE,LP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,TURBINE,LP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,LP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,LP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,TURBINE,LP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD INSTALL,TURBINE,MP,1,Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
TERM_COND,STD INSTALL,TURBINE,MP,2,Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,3,Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
TERM_COND,STD INSTALL,TURBINE,MP,4,The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
TERM_COND,STD INSTALL,TURBINE,MP,5,This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
TERM_COND,STD INSTALL,TURBINE,MP,6,The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
TERM_COND,STD INSTALL,TURBINE,MP,7,It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
TERM_COND,STD INSTALL,TURBINE,MP,8,The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
TERM_COND,STD INSTALL,TURBINE,MP,9,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD INSTALL,TURBINE,MP,10,Lifting gear if required will be charged at a rate of <20>400 per day.
CONT_SUM,STD REMOVE,DIAPHRAGM,MP,1,plus purging on time and materials basis.
CONT_SUM,STD REMOVE,DIAPHRAGM,MP,2,excluding lifting gear charges
CONT_SUM_QA,STD REMOVE,DIAPHRAGM,MP,2,excluding lifting gear charges
DESC_WORK,STD REMOVE,ROTARY,LP,2,excluding lifting gear charges
DESC_WORK,STD REMOVE,ROTARY,MP,2,excluding lifting gear charges
DESC_WORK,STD REMOVE,TURBINE,LP,2,excluding lifting gear charges
DESC_WORK,STD REMOVE,TURBINE,MP,2,excluding lifting gear charges
TERM_COND,STD REMOVE,DIAPHRAGM,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,DIAPHRAGM,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,DIAPHRAGM,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,DIAPHRAGM,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,DIAPHRAGM,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD REMOVE,ROTARY,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,STD REMOVE,ROTARY,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,ROTARY,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,ROTARY,LP,4,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD REMOVE,ROTARY,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,ROTARY,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,ROTARY,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD REMOVE,TURBINE,LP,1,This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
TERM_COND,STD REMOVE,TURBINE,LP,2,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,TURBINE,LP,3,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,TURBINE,LP,4,Lifting gear if required will be charged at a rate of <20>400 per day.
TERM_COND,STD REMOVE,TURBINE,MP,1,Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
TERM_COND,STD REMOVE,TURBINE,MP,2,This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
TERM_COND,STD REMOVE,TURBINE,MP,3,Lifting gear if required will be charged at a rate of <20>400 per day.
CONT_SUM_QA,REMOVE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,REMOVE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,REMOVE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,REMOVE,TURBINE,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD REMOVE,ROTARY,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD REMOVE,ROTARY,MP,1,excluding lifting gear charges
CONT_SUM_QA,STD REMOVE,TURBINE,LP,1,excluding lifting gear charges
CONT_SUM_QA,STD REMOVE,TURBINE,MP,1,excluding lifting gear charges
"DOCUMENT_POSITION","JOB TYPE","METER TYPE","SERVICE PRESSURE","SORT_ORDER","TEXT"
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear charges"
"CONT_SUM","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM","STD INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","LP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","ROTARY","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","LP",2,"excluding lifting gear charges"
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",1,"plus purging on time and materials basis."
"CONT_SUM_QA","ADVERSARIAL","TURBINE","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD EXCHANGE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","DIAPHRAGM","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD INSTALL","TURBINE","MP",1,"excluding lifting gear charges"
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","DIAPHRAGM","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","ROTARY","MP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","LP",1,"Purging of downstream pipework."
"DESC_WORK","ADVERSARIAL","TURBINE","MP",1,"Purging of downstream pipework."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",11,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","ROTARY","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","ROTARY","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","TURBINE","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","EXCHANGE","TURBINE","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"DESC_WORK","REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",11,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","ROTARY","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","ROTARY","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","TURBINE","LP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","STD EXCHANGE","TURBINE","MP",12,"Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others."
"TERM_COND","ADDON","DIAPHRAGM","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","DIAPHRAGM","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","DIAPHRAGM","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","DIAPHRAGM","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","ROTARY","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","ROTARY","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","ROTARY","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","LP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","LP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","LP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADDON","TURBINE","MP",1,"This quotation is based on there being a working LF connection on the existing meter."
"TERM_COND","ADDON","TURBINE","MP",2,"This quotation does not include for the provision of a separate instrumentation cabinet."
"TERM_COND","ADDON","TURBINE","MP",3,"Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","ADVERSARIAL","ROTARY","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","ROTARY","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence. "
"TERM_COND","ADVERSARIAL","TURBINE","LP",2,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","ADVERSARIAL","TURBINE","MP",1,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","ADVERSARIAL","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on two visits, one to remove the exisiting meter, and one to install the new meter."
"TERM_COND","EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","DIAPHRAGM","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","ROTARY","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","ROTARY","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.."
"TERM_COND","EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","EXCHANGE","TURBINE","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","EXCHANGE","TURBINE","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","OFMAT","DIAPHRAGM","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","DIAPHRAGM","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","ROTARY","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","LP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","LP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","OFMAT","TURBINE","MP",1,"This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly."
"TERM_COND","OFMAT","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","DIAPHRAGM","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","ROTARY","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","ROTARY","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","ROTARY","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","LP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","LP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","LP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD EXCHANGE","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD EXCHANGE","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD EXCHANGE","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD EXCHANGE","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD EXCHANGE","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD EXCHANGE","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD EXCHANGE","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD EXCHANGE","TURBINE","MP",9,"This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV."
"TERM_COND","STD EXCHANGE","TURBINE","MP",10,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD EXCHANGE","TURBINE","MP",11,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","DIAPHRAGM","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","ROTARY","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","ROTARY","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","ROTARY","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","ROTARY","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","ROTARY","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","ROTARY","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","ROTARY","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","ROTARY","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","ROTARY","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","LP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","LP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","LP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","LP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","LP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","LP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","LP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","LP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","LP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD INSTALL","TURBINE","MP",1,"Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order."
"TERM_COND","STD INSTALL","TURBINE","MP",2,"Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",3,"Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed."
"TERM_COND","STD INSTALL","TURBINE","MP",4,"The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point."
"TERM_COND","STD INSTALL","TURBINE","MP",5,"This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided."
"TERM_COND","STD INSTALL","TURBINE","MP",6,"The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily"
"TERM_COND","STD INSTALL","TURBINE","MP",7,"It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place."
"TERM_COND","STD INSTALL","TURBINE","MP",8,"The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2."
"TERM_COND","STD INSTALL","TURBINE","MP",9,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD INSTALL","TURBINE","MP",10,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",1,"plus purging on time and materials basis."
"CONT_SUM","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","DIAPHRAGM","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","ROTARY","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","ROTARY","MP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","LP",2,"excluding lifting gear charges"
"DESC_WORK","STD REMOVE","TURBINE","MP",2,"excluding lifting gear charges"
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","DIAPHRAGM","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","ROTARY","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","ROTARY","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","ROTARY","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","ROTARY","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","LP",1,"This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence."
"TERM_COND","STD REMOVE","TURBINE","LP",2,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","LP",3,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","LP",4,"Lifting gear if required will be charged at a rate of <20>400 per day."
"TERM_COND","STD REMOVE","TURBINE","MP",1,"Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging."
"TERM_COND","STD REMOVE","TURBINE","MP",2,"This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted"
"TERM_COND","STD REMOVE","TURBINE","MP",3,"Lifting gear if required will be charged at a rate of <20>400 per day."
"CONT_SUM_QA","REMOVE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","REMOVE","TURBINE","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","ROTARY","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","ROTARY","MP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","TURBINE","LP",1,"excluding lifting gear charges"
"CONT_SUM_QA","STD REMOVE","TURBINE","MP",1,"excluding lifting gear charges"
1 DOCUMENT_POSITION JOB TYPE METER TYPE SERVICE PRESSURE SORT_ORDER TEXT
2 CONT_SUM ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
3 CONT_SUM ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
4 CONT_SUM ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear charges
5 CONT_SUM ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
6 CONT_SUM ADVERSARIAL ROTARY LP 2 excluding lifting gear charges
7 CONT_SUM ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
8 CONT_SUM ADVERSARIAL ROTARY MP 2 excluding lifting gear charges
9 CONT_SUM ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
10 CONT_SUM ADVERSARIAL TURBINE LP 2 excluding lifting gear charges
11 CONT_SUM ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
12 CONT_SUM ADVERSARIAL TURBINE MP 2 excluding lifting gear charges
13 CONT_SUM EXCHANGE DIAPHRAGM MP 1 excluding lifting gear charges
14 CONT_SUM EXCHANGE ROTARY LP 1 excluding lifting gear charges
15 CONT_SUM EXCHANGE ROTARY MP 1 excluding lifting gear charges
16 CONT_SUM EXCHANGE TURBINE LP 1 excluding lifting gear charges
17 CONT_SUM EXCHANGE TURBINE MP 1 excluding lifting gear charges
18 CONT_SUM INSTALL DIAPHRAGM MP 1 excluding lifting gear charges
19 CONT_SUM INSTALL ROTARY LP 1 excluding lifting gear charges
20 CONT_SUM INSTALL ROTARY MP 1 excluding lifting gear charges
21 CONT_SUM INSTALL TURBINE LP 1 excluding lifting gear charges
22 CONT_SUM INSTALL TURBINE MP 1 excluding lifting gear charges
23 CONT_SUM REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
24 CONT_SUM REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
25 CONT_SUM STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear charges
26 CONT_SUM STD EXCHANGE ROTARY LP 1 excluding lifting gear charges
27 CONT_SUM STD EXCHANGE ROTARY MP 1 excluding lifting gear charges
28 CONT_SUM STD EXCHANGE TURBINE LP 1 excluding lifting gear charges
29 CONT_SUM STD EXCHANGE TURBINE MP 1 excluding lifting gear charges
30 CONT_SUM STD INSTALL DIAPHRAGM MP 1 excluding lifting gear charges
31 CONT_SUM STD INSTALL ROTARY LP 1 excluding lifting gear charges
32 CONT_SUM STD INSTALL ROTARY MP 1 excluding lifting gear charges
33 CONT_SUM STD INSTALL TURBINE LP 1 excluding lifting gear charges
34 CONT_SUM STD INSTALL TURBINE MP 1 excluding lifting gear charges
35 CONT_SUM_QA ADVERSARIAL DIAPHRAGM LP 1 plus purging on time and materials basis.
36 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 1 plus purging on time and materials basis.
37 CONT_SUM_QA ADVERSARIAL DIAPHRAGM MP 2 excluding lifting gear charges
38 CONT_SUM_QA ADVERSARIAL ROTARY LP 1 plus purging on time and materials basis.
39 CONT_SUM_QA ADVERSARIAL ROTARY LP 2 excluding lifting gear charges
40 CONT_SUM_QA ADVERSARIAL ROTARY MP 1 plus purging on time and materials basis.
41 CONT_SUM_QA ADVERSARIAL ROTARY MP 2 excluding lifting gear charges
42 CONT_SUM_QA ADVERSARIAL TURBINE LP 1 plus purging on time and materials basis.
43 CONT_SUM_QA ADVERSARIAL TURBINE LP 2 excluding lifting gear charges
44 CONT_SUM_QA ADVERSARIAL TURBINE MP 1 plus purging on time and materials basis.
45 CONT_SUM_QA ADVERSARIAL TURBINE MP 2 excluding lifting gear charges
46 CONT_SUM_QA EXCHANGE DIAPHRAGM MP 1 excluding lifting gear charges
47 CONT_SUM_QA EXCHANGE ROTARY LP 1 excluding lifting gear charges
48 CONT_SUM_QA EXCHANGE ROTARY MP 1 excluding lifting gear charges
49 CONT_SUM_QA EXCHANGE TURBINE LP 1 excluding lifting gear charges
50 CONT_SUM_QA EXCHANGE TURBINE MP 1 excluding lifting gear charges
51 CONT_SUM_QA INSTALL DIAPHRAGM MP 1 excluding lifting gear charges
52 CONT_SUM_QA INSTALL ROTARY LP 1 excluding lifting gear charges
53 CONT_SUM_QA INSTALL ROTARY MP 1 excluding lifting gear charges
54 CONT_SUM_QA INSTALL TURBINE LP 1 excluding lifting gear charges
55 CONT_SUM_QA INSTALL TURBINE MP 1 excluding lifting gear charges
56 CONT_SUM_QA REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
57 CONT_SUM_QA STD EXCHANGE DIAPHRAGM MP 1 excluding lifting gear charges
58 CONT_SUM_QA STD EXCHANGE ROTARY LP 1 excluding lifting gear charges
59 CONT_SUM_QA STD EXCHANGE ROTARY MP 1 excluding lifting gear charges
60 CONT_SUM_QA STD EXCHANGE TURBINE LP 1 excluding lifting gear charges
61 CONT_SUM_QA STD EXCHANGE TURBINE MP 1 excluding lifting gear charges
62 CONT_SUM_QA STD INSTALL DIAPHRAGM MP 1 excluding lifting gear charges
63 CONT_SUM_QA STD INSTALL ROTARY LP 1 excluding lifting gear charges
64 CONT_SUM_QA STD INSTALL ROTARY MP 1 excluding lifting gear charges
65 CONT_SUM_QA STD INSTALL TURBINE LP 1 excluding lifting gear charges
66 CONT_SUM_QA STD INSTALL TURBINE MP 1 excluding lifting gear charges
67 DESC_WORK ADVERSARIAL DIAPHRAGM LP 1 Purging of downstream pipework.
68 DESC_WORK ADVERSARIAL DIAPHRAGM MP 1 Purging of downstream pipework.
69 DESC_WORK ADVERSARIAL ROTARY LP 1 Purging of downstream pipework.
70 DESC_WORK ADVERSARIAL ROTARY MP 1 Purging of downstream pipework.
71 DESC_WORK ADVERSARIAL TURBINE LP 1 Purging of downstream pipework.
72 DESC_WORK ADVERSARIAL TURBINE MP 1 Purging of downstream pipework.
73 TERM_COND EXCHANGE DIAPHRAGM LP 11 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
74 TERM_COND EXCHANGE DIAPHRAGM MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
75 TERM_COND EXCHANGE ROTARY LP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
76 TERM_COND EXCHANGE ROTARY MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
77 TERM_COND EXCHANGE TURBINE LP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
78 TERM_COND EXCHANGE TURBINE MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
79 DESC_WORK REMOVE ROTARY LP 2 excluding lifting gear charges
80 DESC_WORK REMOVE ROTARY MP 2 excluding lifting gear charges
81 DESC_WORK REMOVE TURBINE LP 2 excluding lifting gear charges
82 DESC_WORK REMOVE TURBINE MP 2 excluding lifting gear charges
83 TERM_COND STD EXCHANGE DIAPHRAGM LP 11 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
84 TERM_COND STD EXCHANGE DIAPHRAGM MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
85 TERM_COND STD EXCHANGE ROTARY LP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
86 TERM_COND STD EXCHANGE ROTARY MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
87 TERM_COND STD EXCHANGE TURBINE LP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
88 TERM_COND STD EXCHANGE TURBINE MP 12 Any service alteration required will need to be actioned by the UIP. Any outlet pipework alterations and the outlet pipework connection to the meter module will need to be actioned by others.
89 TERM_COND ADDON DIAPHRAGM LP 1 This quotation is based on there being a working LF connection on the existing meter.
90 TERM_COND ADDON DIAPHRAGM LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
91 TERM_COND ADDON DIAPHRAGM LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
92 TERM_COND ADDON DIAPHRAGM MP 1 This quotation is based on there being a working LF connection on the existing meter.
93 TERM_COND ADDON DIAPHRAGM MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
94 TERM_COND ADDON DIAPHRAGM MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
95 TERM_COND ADDON ROTARY LP 1 This quotation is based on there being a working LF connection on the existing meter.
96 TERM_COND ADDON ROTARY LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
97 TERM_COND ADDON ROTARY LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
98 TERM_COND ADDON ROTARY MP 1 This quotation is based on there being a working LF connection on the existing meter.
99 TERM_COND ADDON ROTARY MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
100 TERM_COND ADDON ROTARY MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
101 TERM_COND ADDON TURBINE LP 1 This quotation is based on there being a working LF connection on the existing meter.
102 TERM_COND ADDON TURBINE LP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
103 TERM_COND ADDON TURBINE LP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
104 TERM_COND ADDON TURBINE MP 1 This quotation is based on there being a working LF connection on the existing meter.
105 TERM_COND ADDON TURBINE MP 2 This quotation does not include for the provision of a separate instrumentation cabinet.
106 TERM_COND ADDON TURBINE MP 3 Electrical Connections to gas meters are subject to the assessment of the hazardous area around the meter. This is largely affected by the ventilation in the housing. Should the ventilation be found to be inadequate the connection will not be made and the requirements to allow the connection reported to you.
107 TERM_COND ADVERSARIAL DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
108 TERM_COND ADVERSARIAL DIAPHRAGM LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
109 TERM_COND ADVERSARIAL ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
110 TERM_COND ADVERSARIAL ROTARY LP 2 Lifting gear if required will be charged at a rate of 400 per day.
111 TERM_COND ADVERSARIAL ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
112 TERM_COND ADVERSARIAL ROTARY MP 1 Lifting gear if required will be charged at a rate of 400 per day.
113 TERM_COND ADVERSARIAL ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
114 TERM_COND ADVERSARIAL TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
115 TERM_COND ADVERSARIAL TURBINE LP 2 Lifting gear if required will be charged at a rate of 400 per day.
116 TERM_COND ADVERSARIAL TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
117 TERM_COND ADVERSARIAL TURBINE MP 1 Lifting gear if required will be charged at a rate of 400 per day.
118 TERM_COND ADVERSARIAL TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
119 TERM_COND EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
120 TERM_COND EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
121 TERM_COND EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
122 TERM_COND EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
123 TERM_COND EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
124 TERM_COND EXCHANGE DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
125 TERM_COND EXCHANGE DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
126 TERM_COND EXCHANGE DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
127 TERM_COND EXCHANGE DIAPHRAGM LP 9 This quotation is based on two visits This quotation is based on two visits, one to remove the exisiting meter, and one to install the new meter.
128 TERM_COND EXCHANGE DIAPHRAGM LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
129 TERM_COND EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
130 TERM_COND EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
131 TERM_COND EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
132 TERM_COND EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
133 TERM_COND EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
134 TERM_COND EXCHANGE DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
135 TERM_COND EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
136 TERM_COND EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
137 TERM_COND EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
138 TERM_COND EXCHANGE DIAPHRAGM MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
139 TERM_COND EXCHANGE DIAPHRAGM MP 11 Lifting gear if required will be charged at a rate of 400 per day.
140 TERM_COND EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
141 TERM_COND EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
142 TERM_COND EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
143 TERM_COND EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
144 TERM_COND EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
145 TERM_COND EXCHANGE ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
146 TERM_COND EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
147 TERM_COND EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
148 TERM_COND EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
149 TERM_COND EXCHANGE ROTARY LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
150 TERM_COND EXCHANGE ROTARY LP 11 Lifting gear if required will be charged at a rate of 400 per day.
151 TERM_COND EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
152 TERM_COND EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
153 TERM_COND EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
154 TERM_COND EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
155 TERM_COND EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
156 TERM_COND EXCHANGE ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
157 TERM_COND EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
158 TERM_COND EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
159 TERM_COND EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
160 TERM_COND EXCHANGE ROTARY MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
161 TERM_COND EXCHANGE ROTARY MP 11 Lifting gear if required will be charged at a rate of 400 per day.
162 TERM_COND EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
163 TERM_COND EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed..
164 TERM_COND EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
165 TERM_COND EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
166 TERM_COND EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
167 TERM_COND EXCHANGE TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
168 TERM_COND EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
169 TERM_COND EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
170 TERM_COND EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
171 TERM_COND EXCHANGE TURBINE LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
172 TERM_COND EXCHANGE TURBINE LP 11 Lifting gear if required will be charged at a rate of 400 per day.
173 TERM_COND EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
174 TERM_COND EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
175 TERM_COND EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
176 TERM_COND EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
177 TERM_COND EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
178 TERM_COND EXCHANGE TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
179 TERM_COND EXCHANGE TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
180 TERM_COND EXCHANGE TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
181 TERM_COND EXCHANGE TURBINE MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
182 TERM_COND EXCHANGE TURBINE MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
183 TERM_COND EXCHANGE TURBINE MP 11 Lifting gear if required will be charged at a rate of 400 per day.
184 TERM_COND INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
185 TERM_COND INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
186 TERM_COND INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
187 TERM_COND INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
188 TERM_COND INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
189 TERM_COND INSTALL DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
190 TERM_COND INSTALL DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
191 TERM_COND INSTALL DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
192 TERM_COND INSTALL DIAPHRAGM LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
193 TERM_COND INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
194 TERM_COND INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
195 TERM_COND INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
196 TERM_COND INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
197 TERM_COND INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
198 TERM_COND INSTALL DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
199 TERM_COND INSTALL DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
200 TERM_COND INSTALL DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
201 TERM_COND INSTALL DIAPHRAGM MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
202 TERM_COND INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
203 TERM_COND INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
204 TERM_COND INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
205 TERM_COND INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
206 TERM_COND INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
207 TERM_COND INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
208 TERM_COND INSTALL ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
209 TERM_COND INSTALL ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
210 TERM_COND INSTALL ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
211 TERM_COND INSTALL ROTARY LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
212 TERM_COND INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
213 TERM_COND INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
214 TERM_COND INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
215 TERM_COND INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
216 TERM_COND INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
217 TERM_COND INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
218 TERM_COND INSTALL ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
219 TERM_COND INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
220 TERM_COND INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
221 TERM_COND INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
222 TERM_COND INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
223 TERM_COND INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
224 TERM_COND INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
225 TERM_COND INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
226 TERM_COND INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
227 TERM_COND INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
228 TERM_COND INSTALL TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
229 TERM_COND INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
230 TERM_COND INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
231 TERM_COND INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
232 TERM_COND INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
233 TERM_COND INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
234 TERM_COND INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
235 TERM_COND INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
236 TERM_COND INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
237 TERM_COND INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
238 TERM_COND INSTALL TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
239 TERM_COND INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
240 TERM_COND INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
241 TERM_COND INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
242 TERM_COND INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
243 TERM_COND OFMAT DIAPHRAGM LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
244 TERM_COND OFMAT DIAPHRAGM LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
245 TERM_COND OFMAT DIAPHRAGM MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
246 TERM_COND OFMAT DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
247 TERM_COND OFMAT ROTARY LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
248 TERM_COND OFMAT ROTARY LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
249 TERM_COND OFMAT ROTARY MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
250 TERM_COND OFMAT ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
251 TERM_COND OFMAT TURBINE LP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
252 TERM_COND OFMAT TURBINE LP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
253 TERM_COND OFMAT TURBINE MP 1 This charge will only be applicable if the meter accuracy test identifies the meter to be working correctly.
254 TERM_COND OFMAT TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
255 TERM_COND REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
256 TERM_COND REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
257 TERM_COND REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
258 TERM_COND REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
259 TERM_COND REMOVE DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
260 TERM_COND REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
261 TERM_COND REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
262 TERM_COND REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
263 TERM_COND REMOVE ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
264 TERM_COND REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
265 TERM_COND REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
266 TERM_COND REMOVE ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
267 TERM_COND REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
268 TERM_COND REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
269 TERM_COND REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
270 TERM_COND REMOVE TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
271 TERM_COND REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
272 TERM_COND REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
273 TERM_COND REMOVE TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
274 TERM_COND REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.
275 TERM_COND STD EXCHANGE DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
276 TERM_COND STD EXCHANGE DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
277 TERM_COND STD EXCHANGE DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
278 TERM_COND STD EXCHANGE DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
279 TERM_COND STD EXCHANGE DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
280 TERM_COND STD EXCHANGE DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
281 TERM_COND STD EXCHANGE DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
282 TERM_COND STD EXCHANGE DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
283 TERM_COND STD EXCHANGE DIAPHRAGM LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
284 TERM_COND STD EXCHANGE DIAPHRAGM LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
285 TERM_COND STD EXCHANGE DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
286 TERM_COND STD EXCHANGE DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
287 TERM_COND STD EXCHANGE DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
288 TERM_COND STD EXCHANGE DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
289 TERM_COND STD EXCHANGE DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
290 TERM_COND STD EXCHANGE DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
291 TERM_COND STD EXCHANGE DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
292 TERM_COND STD EXCHANGE DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
293 TERM_COND STD EXCHANGE DIAPHRAGM MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
294 TERM_COND STD EXCHANGE DIAPHRAGM MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
295 TERM_COND STD EXCHANGE DIAPHRAGM MP 11 Lifting gear if required will be charged at a rate of 400 per day.
296 TERM_COND STD EXCHANGE ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
297 TERM_COND STD EXCHANGE ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
298 TERM_COND STD EXCHANGE ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
299 TERM_COND STD EXCHANGE ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
300 TERM_COND STD EXCHANGE ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
301 TERM_COND STD EXCHANGE ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
302 TERM_COND STD EXCHANGE ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
303 TERM_COND STD EXCHANGE ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
304 TERM_COND STD EXCHANGE ROTARY LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
305 TERM_COND STD EXCHANGE ROTARY LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
306 TERM_COND STD EXCHANGE ROTARY LP 11 Lifting gear if required will be charged at a rate of 400 per day.
307 TERM_COND STD EXCHANGE ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
308 TERM_COND STD EXCHANGE ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
309 TERM_COND STD EXCHANGE ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
310 TERM_COND STD EXCHANGE ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
311 TERM_COND STD EXCHANGE ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
312 TERM_COND STD EXCHANGE ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
313 TERM_COND STD EXCHANGE ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
314 TERM_COND STD EXCHANGE ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
315 TERM_COND STD EXCHANGE ROTARY MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
316 TERM_COND STD EXCHANGE ROTARY MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
317 TERM_COND STD EXCHANGE ROTARY MP 11 Lifting gear if required will be charged at a rate of 400 per day.
318 TERM_COND STD EXCHANGE TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
319 TERM_COND STD EXCHANGE TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
320 TERM_COND STD EXCHANGE TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
321 TERM_COND STD EXCHANGE TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
322 TERM_COND STD EXCHANGE TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
323 TERM_COND STD EXCHANGE TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
324 TERM_COND STD EXCHANGE TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
325 TERM_COND STD EXCHANGE TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
326 TERM_COND STD EXCHANGE TURBINE LP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
327 TERM_COND STD EXCHANGE TURBINE LP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
328 TERM_COND STD EXCHANGE TURBINE LP 11 Lifting gear if required will be charged at a rate of 400 per day.
329 TERM_COND STD EXCHANGE TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
330 TERM_COND STD EXCHANGE TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
331 TERM_COND STD EXCHANGE TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
332 TERM_COND STD EXCHANGE TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
333 TERM_COND STD EXCHANGE TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
334 TERM_COND STD EXCHANGE TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
335 TERM_COND STD EXCHANGE TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
336 TERM_COND STD EXCHANGE TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
337 TERM_COND STD EXCHANGE TURBINE MP 9 This quotation is based on the exchange being completed on the same day and the new meter module being attached to the existing ECV.
338 TERM_COND STD EXCHANGE TURBINE MP 10 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
339 TERM_COND STD EXCHANGE TURBINE MP 11 Lifting gear if required will be charged at a rate of 400 per day.
340 TERM_COND STD INSTALL DIAPHRAGM LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
341 TERM_COND STD INSTALL DIAPHRAGM LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
342 TERM_COND STD INSTALL DIAPHRAGM LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
343 TERM_COND STD INSTALL DIAPHRAGM LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
344 TERM_COND STD INSTALL DIAPHRAGM LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
345 TERM_COND STD INSTALL DIAPHRAGM LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
346 TERM_COND STD INSTALL DIAPHRAGM LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
347 TERM_COND STD INSTALL DIAPHRAGM LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
348 TERM_COND STD INSTALL DIAPHRAGM LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
349 TERM_COND STD INSTALL DIAPHRAGM MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
350 TERM_COND STD INSTALL DIAPHRAGM MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
351 TERM_COND STD INSTALL DIAPHRAGM MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
352 TERM_COND STD INSTALL DIAPHRAGM MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
353 TERM_COND STD INSTALL DIAPHRAGM MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
354 TERM_COND STD INSTALL DIAPHRAGM MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
355 TERM_COND STD INSTALL DIAPHRAGM MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
356 TERM_COND STD INSTALL DIAPHRAGM MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
357 TERM_COND STD INSTALL DIAPHRAGM MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
358 TERM_COND STD INSTALL DIAPHRAGM MP 10 Lifting gear if required will be charged at a rate of 400 per day.
359 TERM_COND STD INSTALL ROTARY LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
360 TERM_COND STD INSTALL ROTARY LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
361 TERM_COND STD INSTALL ROTARY LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
362 TERM_COND STD INSTALL ROTARY LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
363 TERM_COND STD INSTALL ROTARY LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
364 TERM_COND STD INSTALL ROTARY LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
365 TERM_COND STD INSTALL ROTARY LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
366 TERM_COND STD INSTALL ROTARY LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
367 TERM_COND STD INSTALL ROTARY LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
368 TERM_COND STD INSTALL ROTARY LP 10 Lifting gear if required will be charged at a rate of 400 per day.
369 TERM_COND STD INSTALL ROTARY MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
370 TERM_COND STD INSTALL ROTARY MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
371 TERM_COND STD INSTALL ROTARY MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
372 TERM_COND STD INSTALL ROTARY MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
373 TERM_COND STD INSTALL ROTARY MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
374 TERM_COND STD INSTALL ROTARY MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
375 TERM_COND STD INSTALL ROTARY MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
376 TERM_COND STD INSTALL ROTARY MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
377 TERM_COND STD INSTALL ROTARY MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
378 TERM_COND STD INSTALL ROTARY MP 10 Lifting gear if required will be charged at a rate of 400 per day.
379 TERM_COND STD INSTALL TURBINE LP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
380 TERM_COND STD INSTALL TURBINE LP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
381 TERM_COND STD INSTALL TURBINE LP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
382 TERM_COND STD INSTALL TURBINE LP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure of 25 mbar under Qmax load at the ECV outlet point.
383 TERM_COND STD INSTALL TURBINE LP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
384 TERM_COND STD INSTALL TURBINE LP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
385 TERM_COND STD INSTALL TURBINE LP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
386 TERM_COND STD INSTALL TURBINE LP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
387 TERM_COND STD INSTALL TURBINE LP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
388 TERM_COND STD INSTALL TURBINE LP 10 Lifting gear if required will be charged at a rate of 400 per day.
389 TERM_COND STD INSTALL TURBINE MP 1 Please note that all the sizes and dimensions stated are indicative and are based on current practice at the time of quotation. These are subject to change and must be confirmed at placement of order.
390 TERM_COND STD INSTALL TURBINE MP 2 Housings must have a free ventilation area equal to/exceeding 3% floor area. Minimum Housing requirements for this module are listed in the Meter Housing Detail section above. Failure to provide adequate housing will result in the job not being completed.
391 TERM_COND STD INSTALL TURBINE MP 3 Minimum Base dimension requirements for this module are listed in the Meter Housing and Base section above. Failure not to provide an accurate base will result in the job not being completed.
392 TERM_COND STD INSTALL TURBINE MP 4 The Supply Point must be suitably sized and positioned to provide a minimum pressure as described in table 1 (ECV Outlet) under Qmax load at the ECV outlet point.
393 TERM_COND STD INSTALL TURBINE MP 5 This quotation is based on a the inlet orientation and outlet orientation described in table 3 and the ECV being installed to the dimensions provided.
394 TERM_COND STD INSTALL TURBINE MP 6 The meter module is a single stream supply with no bypass facility. During maintenance operations on the meter installation it may be necessary to isolate the supply temporarily
395 TERM_COND STD INSTALL TURBINE MP 7 It is critical that the module inlet dimensions and orientation are given to the UIP when service works are taken place.
396 TERM_COND STD INSTALL TURBINE MP 8 The proposed meter module has a Qmin specified in table 2 and is based on the requested Qmax also specified in table 2.
397 TERM_COND STD INSTALL TURBINE MP 9 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
398 TERM_COND STD INSTALL TURBINE MP 10 Lifting gear if required will be charged at a rate of 400 per day.
399 CONT_SUM STD REMOVE DIAPHRAGM MP 1 plus purging on time and materials basis.
400 CONT_SUM STD REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
401 CONT_SUM_QA STD REMOVE DIAPHRAGM MP 2 excluding lifting gear charges
402 DESC_WORK STD REMOVE ROTARY LP 2 excluding lifting gear charges
403 DESC_WORK STD REMOVE ROTARY MP 2 excluding lifting gear charges
404 DESC_WORK STD REMOVE TURBINE LP 2 excluding lifting gear charges
405 DESC_WORK STD REMOVE TURBINE MP 2 excluding lifting gear charges
406 TERM_COND STD REMOVE DIAPHRAGM LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
407 TERM_COND STD REMOVE DIAPHRAGM LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
408 TERM_COND STD REMOVE DIAPHRAGM LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
409 TERM_COND STD REMOVE DIAPHRAGM MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
410 TERM_COND STD REMOVE DIAPHRAGM MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
411 TERM_COND STD REMOVE DIAPHRAGM MP 3 Lifting gear if required will be charged at a rate of 400 per day.
412 TERM_COND STD REMOVE ROTARY LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
413 TERM_COND STD REMOVE ROTARY LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
414 TERM_COND STD REMOVE ROTARY LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
415 TERM_COND STD REMOVE ROTARY LP 4 Lifting gear if required will be charged at a rate of 400 per day.
416 TERM_COND STD REMOVE ROTARY MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
417 TERM_COND STD REMOVE ROTARY MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
418 TERM_COND STD REMOVE ROTARY MP 3 Lifting gear if required will be charged at a rate of 400 per day.
419 TERM_COND STD REMOVE TURBINE LP 1 This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure This quotation is based on a low pressure service tier. If the pressure tier if found not to be low pressure, this will be subject to a new quotation or variation and planned meter works will not commence.
420 TERM_COND STD REMOVE TURBINE LP 2 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
421 TERM_COND STD REMOVE TURBINE LP 3 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
422 TERM_COND STD REMOVE TURBINE LP 4 Lifting gear if required will be charged at a rate of 400 per day.
423 TERM_COND STD REMOVE TURBINE MP 1 Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work Where purging of downstream supplies is necessary but has not been requested as part of the meter removal work, the meter will not be removed until the downstream supplies have been made safe by purging.
424 TERM_COND STD REMOVE TURBINE MP 2 This quotation is subject to there being sufficient access available and free from any obstructions. Failure to provide sufficient access may result in the job being aborted
425 TERM_COND STD REMOVE TURBINE MP 3 Lifting gear if required will be charged at a rate of 400 per day.
426 CONT_SUM_QA REMOVE ROTARY LP 1 excluding lifting gear charges
427 CONT_SUM_QA REMOVE ROTARY MP 1 excluding lifting gear charges
428 CONT_SUM_QA REMOVE TURBINE LP 1 excluding lifting gear charges
429 CONT_SUM_QA REMOVE TURBINE MP 1 excluding lifting gear charges
430 CONT_SUM_QA STD REMOVE ROTARY LP 1 excluding lifting gear charges
431 CONT_SUM_QA STD REMOVE ROTARY MP 1 excluding lifting gear charges
432 CONT_SUM_QA STD REMOVE TURBINE LP 1 excluding lifting gear charges
433 CONT_SUM_QA STD REMOVE TURBINE MP 1 excluding lifting gear charges

View File

@@ -1,115 +1,115 @@
SC001 - Scotland,NTH01 - North,STH01 - South,WWE01 - Wales and West,RDN01 - North West,RDN01 - West Mids,RDN01 - East,RDN01 - London,,,,,,,,,,
NETW01,NETW02,NETW03,NETW04,NETW05,NETW06,NETW07,NETW08,,,,,,,,,NETW01,Scotland
SELLING_PRICE,SELLING_PRICE,SELLING PRICE,SELLING PRICE,SELLING PRICE,SELLING PRICE,SELLING PRICE,SELLING PRICE,VALID_FROM,VALID_TO,ENTY_CODE,MESC_CODE,SVCPT_CODE,METY_CODE,,,NETW02,Northern
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U16,LP,DIAPHRAGM,,,NETW03,Southern
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U25,LP,DIAPHRAGM,,,NETW04,Wales and West
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U40,LP,DIAPHRAGM,,,NETW05,North West
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U65,LP,DIAPHRAGM,,,NETW06,West Midlands
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U100,LP,DIAPHRAGM,,,NETW07,East of England
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,INSTALL,U160,LP,DIAPHRAGM,,,NETW08,London
229.32,190.87,221.00,314.65,837.89,829.40,851.24,949.74,01/04/2012,,INSTALL,U16,MP,DIAPHRAGM,,,,
235.38,190.87,221.00,314.65,837.89,829.40,851.24,949.74,01/04/2012,,INSTALL,U25,MP,DIAPHRAGM,,,,
376.88,221.00,251.14,436.58,1053.41,1045.28,1066.20,1185.05,01/04/2012,,INSTALL,U40,MP,DIAPHRAGM,,,,
787.83,502.28,562.56,639.79,1112.73,1103.91,1126.58,1255.29,01/04/2012,,INSTALL,U65,MP,DIAPHRAGM,,,,
884.87,562.56,622.83,680.43,1231.37,1221.20,1247.34,1395.77,01/04/2012,,INSTALL,U100,MP,DIAPHRAGM,,,,
937.54,622.83,683.11,680.43,1350.00,1338.48,1368.09,1536.24,01/04/2012,,INSTALL,U160,MP,DIAPHRAGM,,,,
705.64,383.60,385.02,557.03,793.07,784.03,807.25,924.72,01/04/2012,,INSTALL,40mm,LP,ROTARY,,,,
705.64,383.60,385.02,557.03,793.07,784.03,807.25,924.72,01/04/2012,,INSTALL,50mm,LP,ROTARY,,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,INSTALL,80mm,LP,ROTARY,,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,INSTALL,100mm,LP,ROTARY,,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,INSTALL,150mm,LP,ROTARY,,,,
,1736.77,1745.11,1559.61,,,,,01/04/2012,,INSTALL,200mm,LP,ROTARY,,,,
,1736.77,1745.11,1816.53,,,,,01/04/2012,,INSTALL,250mm,LP,ROTARY,,,,
1022.84,763.47,821.48,742.70,1227.99,1215.06,1248.32,1379.34,01/04/2012,,INSTALL,40mm,MP,ROTARY,,,,
1022.84,763.47,821.48,742.70,1227.99,1215.06,1248.32,1379.34,01/04/2012,,INSTALL,50mm,MP,ROTARY,,,,
1567.72,843.84,901.63,964.93,1484.85,1475.22,1499.97,1640.52,01/04/2012,,INSTALL,80mm,MP,ROTARY,,,,
1965.55,964.38,1021.84,1361.90,2462.87,2452.57,2479.05,2629.46,01/04/2012,,INSTALL,100mm,MP,ROTARY,,,,
2737.18,1490.40,1455.13,1798.07,,,,,01/04/2012,,INSTALL,150mm,MP,ROTARY,,,,
,1527.34,1566.03,2054.99,,,,,01/04/2012,,INSTALL,200mm,MP,ROTARY,,,,
,1582.95,1566.03,2311.91,,,,,01/04/2012,,INSTALL,250mm,MP,ROTARY,,,,
184.14,184.14,184.14,184.14,184.14,184.14,184.14,184.14,01/04/2012,,OFMAT,U16,LP,DIAPHRAGM,,,,
190.02,190.02,190.02,190.02,190.02,190.02,190.02,190.02,01/04/2012,,OFMAT,U25,LP,DIAPHRAGM,,,,
272.83,272.83,272.83,272.83,272.83,272.83,272.83,272.83,01/04/2012,,OFMAT,U40,LP,DIAPHRAGM,,,,
345.28,345.28,345.28,345.28,345.28,345.28,345.28,345.28,01/04/2012,,OFMAT,U65,LP,DIAPHRAGM,,,,
427.88,427.88,427.88,427.88,427.88,427.88,427.88,427.88,01/04/2012,,OFMAT,U100,LP,DIAPHRAGM,,,,
550.49,550.49,550.49,550.49,550.49,550.49,550.49,550.49,01/04/2012,,OFMAT,U160,LP,DIAPHRAGM,,,,
127.16,246.44,276.50,233.36,,,,,01/04/2012,,OFMAT,U16,MP,DIAPHRAGM,,,,
127.16,246.44,276.50,233.36,,,,,01/04/2012,,OFMAT,U25,MP,DIAPHRAGM,,,,
246.92,282.51,312.56,395.93,,,,,01/04/2012,,OFMAT,U40,MP,DIAPHRAGM,,,,
246.92,625.13,685.24,517.86,,,,,01/04/2012,,OFMAT,U65,MP,DIAPHRAGM,,,,
319.68,697.26,757.37,558.51,,,,,01/04/2012,,OFMAT,U100,MP,DIAPHRAGM,,,,
343.94,841.52,898.79,599.15,,,,,01/04/2012,,OFMAT,U160,MP,DIAPHRAGM,,,,
462.19,392.48,393.94,639.55,610.32,604.46,619.53,786.28,01/04/2012,,OFMAT,50mm,LP,ROTARY,,,,
774.49,472.29,474.24,843.00,925.31,919.07,935.13,1112.80,01/04/2012,,OFMAT,80mm,LP,ROTARY,,,,
982.00,614.16,617.01,1083.19,1142.71,1134.39,1155.82,1392.88,01/04/2012,,OFMAT,100mm,LP,ROTARY,,,,
1336.93,1178.47,1183.37,1195.66,,,,,01/04/2012,,OFMAT,150mm,LP,ROTARY,,,,
,1742.91,1751.29,1308.13,,,,,01/04/2012,,OFMAT,200mm,LP,ROTARY,,,,
,2700.01,2714.27,1476.85,,,,,01/04/2012,,OFMAT,250mm,LP,ROTARY,,,,
510.71,641.16,701.27,721.08,,,,,01/04/2012,,OFMAT,50mm,MP,ROTARY,,,,
771.44,681.23,741.34,924.29,,,,,01/04/2012,,OFMAT,80mm,MP,ROTARY,,,,
982.48,761.37,821.48,1249.42,,,,,01/04/2012,,OFMAT,100mm,MP,ROTARY,,,,
1425.95,1001.81,1061.92,1361.90,,,,,01/04/2012,,OFMAT,150mm,MP,ROTARY,,,,
,1327.62,1369.21,1474.37,,,,,01/04/2012,,OFMAT,200mm,MP,ROTARY,,,,
,1327.62,1369.21,1643.08,,,,,01/04/2012,,OFMAT,250mm,MP,ROTARY,,,,
145.77,145.77,145.77,145.77,145.77,145.77,145.77,145.77,01/04/2012,,EXCHANGE,U16,LP,DIAPHRAGM,,,,
146.52,146.52,146.52,146.52,146.52,146.52,146.52,146.52,01/04/2012,,EXCHANGE,U25,LP,DIAPHRAGM,,,,
296.58,296.58,296.58,296.58,296.58,296.58,296.58,296.58,01/04/2012,,EXCHANGE,U40,LP,DIAPHRAGM,,,,
381.49,381.49,381.49,381.49,381.49,381.49,381.49,381.49,01/04/2012,,EXCHANGE,U65,LP,DIAPHRAGM,,,,
557.63,557.63,557.63,557.63,557.63,557.63,557.63,557.63,01/04/2012,,EXCHANGE,U100,LP,DIAPHRAGM,,,,
557.64,557.64,557.64,557.64,557.64,557.64,557.64,557.64,01/04/2012,,EXCHANGE,U160,LP,DIAPHRAGM,,,,
223.11,246.44,276.50,267.23,865.94,864.55,872.70,977.41,01/04/2012,,EXCHANGE,U16,MP,DIAPHRAGM,,,,
223.11,246.44,276.50,436.58,865.94,864.55,872.70,977.41,01/04/2012,,EXCHANGE,U25,MP,DIAPHRAGM,,,,
306.49,282.51,312.56,721.08,1063.92,1072.52,1078.03,1209.20,01/04/2012,,EXCHANGE,U40,MP,DIAPHRAGM,,,,
534.78,625.13,685.24,822.68,1283.38,1289.49,1343.69,1518.26,01/04/2012,,EXCHANGE,U65,MP,DIAPHRAGM,,,,
607.56,697.26,757.37,856.55,1402.02,1406.78,1458.41,1651.72,01/04/2012,,EXCHANGE,U100,MP,DIAPHRAGM,,,,
631.82,841.52,898.79,998.83,1514.73,1518.19,1573.12,1785.17,01/04/2012,,EXCHANGE,U160,MP,DIAPHRAGM,,,,
821.30,383.60,385.02,914.25,1057.97,1049.06,1072.00,1325.80,01/04/2012,,EXCHANGE,40mm,LP,ROTARY,,,,
821.30,383.60,385.02,914.25,1057.97,1049.06,1072.00,1325.80,01/04/2012,,EXCHANGE,50mm,LP,ROTARY,,,,
821.30,463.42,465.17,1111.10,1001.71,993.44,1014.73,1250.29,01/04/2012,,EXCHANGE,80mm,LP,ROTARY,,,,
913.71,605.30,608.08,1223.78,1162.29,1152.19,1178.18,1465.79,01/04/2012,,EXCHANGE,100mm,LP,ROTARY,,,,
1438.64,1172.33,1177.19,1364.37,,,,,01/04/2012,,EXCHANGE,150mm,LP,ROTARY,,,,
,1736.77,1745.11,1308.13,,,,,01/04/2012,,EXCHANGE,200mm,LP,ROTARY,,,,
,1736.77,1745.11,1476.85,,,,,01/04/2012,,EXCHANGE,250mm,LP,ROTARY,,,,
1109.17,761.37,701.27,1005.57,,,,,01/04/2012,,EXCHANGE,40mm,MP,ROTARY,,,,
1109.17,761.37,701.27,1005.57,,,,,01/04/2012,,EXCHANGE,50mm,MP,ROTARY,,,,
1109.17,801.45,741.34,1277.54,,,,,01/04/2012,,EXCHANGE,80mm,MP,ROTARY,,,,
1355.64,881.59,821.48,1390.02,,,,,01/04/2012,,EXCHANGE,100mm,MP,ROTARY,,,,
2106.52,1122.02,1061.92,1530.61,,,,,01/04/2012,,EXCHANGE,150mm,MP,ROTARY,,,,
,1327.62,1369.21,2205.46,,,,,01/04/2012,,EXCHANGE,200mm,MP,ROTARY,,,,
,1327.62,1369.21,2289.82,,,,,01/04/2012,,EXCHANGE,250mm,MP,ROTARY,,,,
142.63,142.63,142.63,142.63,142.63,142.63,142.63,142.63,01/04/2012,,REMOVE,U16,LP,DIAPHRAGM,,,,
142.63,142.63,142.63,142.63,142.63,142.63,142.63,142.63,01/04/2012,,REMOVE,U25,LP,DIAPHRAGM,,,,
214.56,214.56,214.56,214.56,214.56,214.56,214.56,214.56,01/04/2012,,REMOVE,U40,LP,DIAPHRAGM,,,,
257.57,257.57,257.57,257.57,257.57,257.57,257.57,257.57,01/04/2012,,REMOVE,U65,LP,DIAPHRAGM,,,,
409.50,409.50,409.50,409.50,409.50,409.50,409.50,409.50,01/04/2012,,REMOVE,U100,LP,DIAPHRAGM,,,,
431.96,431.96,431.96,431.96,431.96,431.96,431.96,431.96,01/04/2012,,REMOVE,U160,LP,DIAPHRAGM,,,,
225.70,140.64,170.78,194.20,,,,,01/04/2012,,REMOVE,U16,MP,DIAPHRAGM,,,,
274.21,140.64,170.78,194.20,,,,,01/04/2012,,REMOVE,U25,MP,DIAPHRAGM,,,,
448.05,140.64,170.78,314.65,,,,,01/04/2012,,REMOVE,U40,MP,DIAPHRAGM,,,,
593.57,281.28,401.83,436.58,,,,,01/04/2012,,REMOVE,U65,MP,DIAPHRAGM,,,,
653.51,281.28,401.83,477.22,,,,,01/04/2012,,REMOVE,U100,MP,DIAPHRAGM,,,,
703.85,281.28,401.83,477.22,,,,,01/04/2012,,REMOVE,U160,MP,DIAPHRAGM,,,,
452.09,259.47,260.11,355.15,,,,,01/04/2012,,REMOVE,50mm,LP,ROTARY,,,,
767.40,259.47,260.11,598.99,,,,,01/04/2012,,REMOVE,80mm,LP,ROTARY,,,,
859.70,436.82,438.55,775.74,,,,,01/04/2012,,REMOVE,100mm,LP,ROTARY,,,,
1158.41,672.64,674.94,1027.49,,,,,01/04/2012,,REMOVE,150mm,LP,ROTARY,,,,
,887.36,890.99,1155.96,,,,,01/04/2012,,REMOVE,200mm,LP,ROTARY,,,,
,1378.19,1384.83,1284.42,,,,,01/04/2012,,REMOVE,250mm,LP,ROTARY,,,,
539.90,401.83,462.10,395.93,,,,,01/04/2012,,REMOVE,50mm,MP,ROTARY,,,,
794.90,401.83,462.10,680.43,,,,,01/04/2012,,REMOVE,80mm,MP,ROTARY,,,,
942.58,522.37,582.65,862.30,,,,,01/04/2012,,REMOVE,100mm,MP,ROTARY,,,,
1185.91,522.37,582.65,1119.22,,,,,01/04/2012,,REMOVE,150mm,MP,ROTARY,,,,
,642.92,703.20,1247.69,,,,,01/04/2012,,REMOVE,200mm,MP,ROTARY,,,,
,642.92,703.20,1376.14,,,,,01/04/2012,,REMOVE,250mm,MP,ROTARY,,,,
452.09,259.47,260.11,355.15,,,,,01/04/2012,,REMOVE,50mm,LP,TURBINE,,,,
767.40,259.47,260.11,598.99,,,,,01/04/2012,,REMOVE,80mm,LP,TURBINE,,,,
859.70,436.82,438.55,775.74,,,,,01/04/2012,,REMOVE,100mm,LP,TURBINE,,,,
1158.41,672.64,674.94,1027.49,,,,,01/04/2012,,REMOVE,150mm,LP,TURBINE,,,,
,887.36,890.99,1155.96,,,,,01/04/2012,,REMOVE,200mm,LP,TURBINE,,,,
,1378.19,1384.83,1284.42,,,,,01/04/2012,,REMOVE,250mm,LP,TURBINE,,,,
539.90,401.83,462.10,395.93,,,,,01/04/2012,,REMOVE,50mm,MP,TURBINE,,,,
794.90,401.83,462.10,680.43,,,,,01/04/2012,,REMOVE,80mm,MP,TURBINE,,,,
942.58,522.37,582.65,862.30,,,,,01/04/2012,,REMOVE,100mm,MP,TURBINE,,,,
1185.91,522.37,582.65,1119.22,,,,,01/04/2012,,REMOVE,150mm,MP,TURBINE,,,,
,642.92,703.20,1247.69,,,,,01/04/2012,,REMOVE,200mm,MP,TURBINE,,,,
,642.92,703.20,1376.14,,,,,01/04/2012,,REMOVE,250mm,MP,TURBINE,,,,
"SC001 - Scotland","NTH01 - North","STH01 - South","WWE01 - Wales and West","RDN01 - North West","RDN01 - West Mids","RDN01 - East","RDN01 - London",,,,,,,,,,
"NETW01","NETW02","NETW03","NETW04","NETW05","NETW06","NETW07","NETW08",,,,,,,,,"NETW01","Scotland"
"SELLING_PRICE","SELLING_PRICE","SELLING PRICE","SELLING PRICE","SELLING PRICE","SELLING PRICE","SELLING PRICE","SELLING PRICE","VALID_FROM","VALID_TO","ENTY_CODE","MESC_CODE","SVCPT_CODE","METY_CODE",,,"NETW02","Northern"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U16","LP","DIAPHRAGM",,,"NETW03","Southern"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U25","LP","DIAPHRAGM",,,"NETW04","Wales and West"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U40","LP","DIAPHRAGM",,,"NETW05","North West"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U65","LP","DIAPHRAGM",,,"NETW06","West Midlands"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U100","LP","DIAPHRAGM",,,"NETW07","East of England"
0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,01/04/2012,,"INSTALL","U160","LP","DIAPHRAGM",,,"NETW08","London"
229.32,190.87,221.00,314.65,837.89,829.40,851.24,949.74,01/04/2012,,"INSTALL","U16","MP","DIAPHRAGM",,,,
235.38,190.87,221.00,314.65,837.89,829.40,851.24,949.74,01/04/2012,,"INSTALL","U25","MP","DIAPHRAGM",,,,
376.88,221.00,251.14,436.58,1053.41,1045.28,1066.20,1185.05,01/04/2012,,"INSTALL","U40","MP","DIAPHRAGM",,,,
787.83,502.28,562.56,639.79,1112.73,1103.91,1126.58,1255.29,01/04/2012,,"INSTALL","U65","MP","DIAPHRAGM",,,,
884.87,562.56,622.83,680.43,1231.37,1221.20,1247.34,1395.77,01/04/2012,,"INSTALL","U100","MP","DIAPHRAGM",,,,
937.54,622.83,683.11,680.43,1350.00,1338.48,1368.09,1536.24,01/04/2012,,"INSTALL","U160","MP","DIAPHRAGM",,,,
705.64,383.60,385.02,557.03,793.07,784.03,807.25,924.72,01/04/2012,,"INSTALL","40mm","LP","ROTARY",,,,
705.64,383.60,385.02,557.03,793.07,784.03,807.25,924.72,01/04/2012,,"INSTALL","50mm","LP","ROTARY",,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,"INSTALL","80mm","LP","ROTARY",,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,"INSTALL","100mm","LP","ROTARY",,,,
1001.17,463.42,465.32,761.52,1073.94,1067.01,1084.81,1185.90,01/04/2012,,"INSTALL","150mm","LP","ROTARY",,,,
,1736.77,1745.11,1559.61,,,,,01/04/2012,,"INSTALL","200mm","LP","ROTARY",,,,
,1736.77,1745.11,1816.53,,,,,01/04/2012,,"INSTALL","250mm","LP","ROTARY",,,,
1022.84,763.47,821.48,742.70,1227.99,1215.06,1248.32,1379.34,01/04/2012,,"INSTALL","40mm","MP","ROTARY",,,,
1022.84,763.47,821.48,742.70,1227.99,1215.06,1248.32,1379.34,01/04/2012,,"INSTALL","50mm","MP","ROTARY",,,,
1567.72,843.84,901.63,964.93,1484.85,1475.22,1499.97,1640.52,01/04/2012,,"INSTALL","80mm","MP","ROTARY",,,,
1965.55,964.38,1021.84,1361.90,2462.87,2452.57,2479.05,2629.46,01/04/2012,,"INSTALL","100mm","MP","ROTARY",,,,
2737.18,1490.40,1455.13,1798.07,,,,,01/04/2012,,"INSTALL","150mm","MP","ROTARY",,,,
,1527.34,1566.03,2054.99,,,,,01/04/2012,,"INSTALL","200mm","MP","ROTARY",,,,
,1582.95,1566.03,2311.91,,,,,01/04/2012,,"INSTALL","250mm","MP","ROTARY",,,,
184.14,184.14,184.14,184.14,184.14,184.14,184.14,184.14,01/04/2012,,"OFMAT","U16","LP","DIAPHRAGM",,,,
190.02,190.02,190.02,190.02,190.02,190.02,190.02,190.02,01/04/2012,,"OFMAT","U25","LP","DIAPHRAGM",,,,
272.83,272.83,272.83,272.83,272.83,272.83,272.83,272.83,01/04/2012,,"OFMAT","U40","LP","DIAPHRAGM",,,,
345.28,345.28,345.28,345.28,345.28,345.28,345.28,345.28,01/04/2012,,"OFMAT","U65","LP","DIAPHRAGM",,,,
427.88,427.88,427.88,427.88,427.88,427.88,427.88,427.88,01/04/2012,,"OFMAT","U100","LP","DIAPHRAGM",,,,
550.49,550.49,550.49,550.49,550.49,550.49,550.49,550.49,01/04/2012,,"OFMAT","U160","LP","DIAPHRAGM",,,,
127.16,246.44,276.50,233.36,,,,,01/04/2012,,"OFMAT","U16","MP","DIAPHRAGM",,,,
127.16,246.44,276.50,233.36,,,,,01/04/2012,,"OFMAT","U25","MP","DIAPHRAGM",,,,
246.92,282.51,312.56,395.93,,,,,01/04/2012,,"OFMAT","U40","MP","DIAPHRAGM",,,,
246.92,625.13,685.24,517.86,,,,,01/04/2012,,"OFMAT","U65","MP","DIAPHRAGM",,,,
319.68,697.26,757.37,558.51,,,,,01/04/2012,,"OFMAT","U100","MP","DIAPHRAGM",,,,
343.94,841.52,898.79,599.15,,,,,01/04/2012,,"OFMAT","U160","MP","DIAPHRAGM",,,,
462.19,392.48,393.94,639.55,610.32,604.46,619.53,786.28,01/04/2012,,"OFMAT","50mm","LP","ROTARY",,,,
774.49,472.29,474.24,843.00,925.31,919.07,935.13,1112.80,01/04/2012,,"OFMAT","80mm","LP","ROTARY",,,,
982.00,614.16,617.01,1083.19,1142.71,1134.39,1155.82,1392.88,01/04/2012,,"OFMAT","100mm","LP","ROTARY",,,,
1336.93,1178.47,1183.37,1195.66,,,,,01/04/2012,,"OFMAT","150mm","LP","ROTARY",,,,
,1742.91,1751.29,1308.13,,,,,01/04/2012,,"OFMAT","200mm","LP","ROTARY",,,,
,2700.01,2714.27,1476.85,,,,,01/04/2012,,"OFMAT","250mm","LP","ROTARY",,,,
510.71,641.16,701.27,721.08,,,,,01/04/2012,,"OFMAT","50mm","MP","ROTARY",,,,
771.44,681.23,741.34,924.29,,,,,01/04/2012,,"OFMAT","80mm","MP","ROTARY",,,,
982.48,761.37,821.48,1249.42,,,,,01/04/2012,,"OFMAT","100mm","MP","ROTARY",,,,
1425.95,1001.81,1061.92,1361.90,,,,,01/04/2012,,"OFMAT","150mm","MP","ROTARY",,,,
,1327.62,1369.21,1474.37,,,,,01/04/2012,,"OFMAT","200mm","MP","ROTARY",,,,
,1327.62,1369.21,1643.08,,,,,01/04/2012,,"OFMAT","250mm","MP","ROTARY",,,,
145.77,145.77,145.77,145.77,145.77,145.77,145.77,145.77,01/04/2012,,"EXCHANGE","U16","LP","DIAPHRAGM",,,,
146.52,146.52,146.52,146.52,146.52,146.52,146.52,146.52,01/04/2012,,"EXCHANGE","U25","LP","DIAPHRAGM",,,,
296.58,296.58,296.58,296.58,296.58,296.58,296.58,296.58,01/04/2012,,"EXCHANGE","U40","LP","DIAPHRAGM",,,,
381.49,381.49,381.49,381.49,381.49,381.49,381.49,381.49,01/04/2012,,"EXCHANGE","U65","LP","DIAPHRAGM",,,,
557.63,557.63,557.63,557.63,557.63,557.63,557.63,557.63,01/04/2012,,"EXCHANGE","U100","LP","DIAPHRAGM",,,,
557.64,557.64,557.64,557.64,557.64,557.64,557.64,557.64,01/04/2012,,"EXCHANGE","U160","LP","DIAPHRAGM",,,,
223.11,246.44,276.50,267.23,865.94,864.55,872.70,977.41,01/04/2012,,"EXCHANGE","U16","MP","DIAPHRAGM",,,,
223.11,246.44,276.50,436.58,865.94,864.55,872.70,977.41,01/04/2012,,"EXCHANGE","U25","MP","DIAPHRAGM",,,,
306.49,282.51,312.56,721.08,1063.92,1072.52,1078.03,1209.20,01/04/2012,,"EXCHANGE","U40","MP","DIAPHRAGM",,,,
534.78,625.13,685.24,822.68,1283.38,1289.49,1343.69,1518.26,01/04/2012,,"EXCHANGE","U65","MP","DIAPHRAGM",,,,
607.56,697.26,757.37,856.55,1402.02,1406.78,1458.41,1651.72,01/04/2012,,"EXCHANGE","U100","MP","DIAPHRAGM",,,,
631.82,841.52,898.79,998.83,1514.73,1518.19,1573.12,1785.17,01/04/2012,,"EXCHANGE","U160","MP","DIAPHRAGM",,,,
821.30,383.60,385.02,914.25,1057.97,1049.06,1072.00,1325.80,01/04/2012,,"EXCHANGE","40mm","LP","ROTARY",,,,
821.30,383.60,385.02,914.25,1057.97,1049.06,1072.00,1325.80,01/04/2012,,"EXCHANGE","50mm","LP","ROTARY",,,,
821.30,463.42,465.17,1111.10,1001.71,993.44,1014.73,1250.29,01/04/2012,,"EXCHANGE","80mm","LP","ROTARY",,,,
913.71,605.30,608.08,1223.78,1162.29,1152.19,1178.18,1465.79,01/04/2012,,"EXCHANGE","100mm","LP","ROTARY",,,,
1438.64,1172.33,1177.19,1364.37,,,,,01/04/2012,,"EXCHANGE","150mm","LP","ROTARY",,,,
,1736.77,1745.11,1308.13,,,,,01/04/2012,,"EXCHANGE","200mm","LP","ROTARY",,,,
,1736.77,1745.11,1476.85,,,,,01/04/2012,,"EXCHANGE","250mm","LP","ROTARY",,,,
1109.17,761.37,701.27,1005.57,,,,,01/04/2012,,"EXCHANGE","40mm","MP","ROTARY",,,,
1109.17,761.37,701.27,1005.57,,,,,01/04/2012,,"EXCHANGE","50mm","MP","ROTARY",,,,
1109.17,801.45,741.34,1277.54,,,,,01/04/2012,,"EXCHANGE","80mm","MP","ROTARY",,,,
1355.64,881.59,821.48,1390.02,,,,,01/04/2012,,"EXCHANGE","100mm","MP","ROTARY",,,,
2106.52,1122.02,1061.92,1530.61,,,,,01/04/2012,,"EXCHANGE","150mm","MP","ROTARY",,,,
,1327.62,1369.21,2205.46,,,,,01/04/2012,,"EXCHANGE","200mm","MP","ROTARY",,,,
,1327.62,1369.21,2289.82,,,,,01/04/2012,,"EXCHANGE","250mm","MP","ROTARY",,,,
142.63,142.63,142.63,142.63,142.63,142.63,142.63,142.63,01/04/2012,,"REMOVE","U16","LP","DIAPHRAGM",,,,
142.63,142.63,142.63,142.63,142.63,142.63,142.63,142.63,01/04/2012,,"REMOVE","U25","LP","DIAPHRAGM",,,,
214.56,214.56,214.56,214.56,214.56,214.56,214.56,214.56,01/04/2012,,"REMOVE","U40","LP","DIAPHRAGM",,,,
257.57,257.57,257.57,257.57,257.57,257.57,257.57,257.57,01/04/2012,,"REMOVE","U65","LP","DIAPHRAGM",,,,
409.50,409.50,409.50,409.50,409.50,409.50,409.50,409.50,01/04/2012,,"REMOVE","U100","LP","DIAPHRAGM",,,,
431.96,431.96,431.96,431.96,431.96,431.96,431.96,431.96,01/04/2012,,"REMOVE","U160","LP","DIAPHRAGM",,,,
225.70,140.64,170.78,194.20,,,,,01/04/2012,,"REMOVE","U16","MP","DIAPHRAGM",,,,
274.21,140.64,170.78,194.20,,,,,01/04/2012,,"REMOVE","U25","MP","DIAPHRAGM",,,,
448.05,140.64,170.78,314.65,,,,,01/04/2012,,"REMOVE","U40","MP","DIAPHRAGM",,,,
593.57,281.28,401.83,436.58,,,,,01/04/2012,,"REMOVE","U65","MP","DIAPHRAGM",,,,
653.51,281.28,401.83,477.22,,,,,01/04/2012,,"REMOVE","U100","MP","DIAPHRAGM",,,,
703.85,281.28,401.83,477.22,,,,,01/04/2012,,"REMOVE","U160","MP","DIAPHRAGM",,,,
452.09,259.47,260.11,355.15,,,,,01/04/2012,,"REMOVE","50mm","LP","ROTARY",,,,
767.40,259.47,260.11,598.99,,,,,01/04/2012,,"REMOVE","80mm","LP","ROTARY",,,,
859.70,436.82,438.55,775.74,,,,,01/04/2012,,"REMOVE","100mm","LP","ROTARY",,,,
1158.41,672.64,674.94,1027.49,,,,,01/04/2012,,"REMOVE","150mm","LP","ROTARY",,,,
,887.36,890.99,1155.96,,,,,01/04/2012,,"REMOVE","200mm","LP","ROTARY",,,,
,1378.19,1384.83,1284.42,,,,,01/04/2012,,"REMOVE","250mm","LP","ROTARY",,,,
539.90,401.83,462.10,395.93,,,,,01/04/2012,,"REMOVE","50mm","MP","ROTARY",,,,
794.90,401.83,462.10,680.43,,,,,01/04/2012,,"REMOVE","80mm","MP","ROTARY",,,,
942.58,522.37,582.65,862.30,,,,,01/04/2012,,"REMOVE","100mm","MP","ROTARY",,,,
1185.91,522.37,582.65,1119.22,,,,,01/04/2012,,"REMOVE","150mm","MP","ROTARY",,,,
,642.92,703.20,1247.69,,,,,01/04/2012,,"REMOVE","200mm","MP","ROTARY",,,,
,642.92,703.20,1376.14,,,,,01/04/2012,,"REMOVE","250mm","MP","ROTARY",,,,
452.09,259.47,260.11,355.15,,,,,01/04/2012,,"REMOVE","50mm","LP","TURBINE",,,,
767.40,259.47,260.11,598.99,,,,,01/04/2012,,"REMOVE","80mm","LP","TURBINE",,,,
859.70,436.82,438.55,775.74,,,,,01/04/2012,,"REMOVE","100mm","LP","TURBINE",,,,
1158.41,672.64,674.94,1027.49,,,,,01/04/2012,,"REMOVE","150mm","LP","TURBINE",,,,
,887.36,890.99,1155.96,,,,,01/04/2012,,"REMOVE","200mm","LP","TURBINE",,,,
,1378.19,1384.83,1284.42,,,,,01/04/2012,,"REMOVE","250mm","LP","TURBINE",,,,
539.90,401.83,462.10,395.93,,,,,01/04/2012,,"REMOVE","50mm","MP","TURBINE",,,,
794.90,401.83,462.10,680.43,,,,,01/04/2012,,"REMOVE","80mm","MP","TURBINE",,,,
942.58,522.37,582.65,862.30,,,,,01/04/2012,,"REMOVE","100mm","MP","TURBINE",,,,
1185.91,522.37,582.65,1119.22,,,,,01/04/2012,,"REMOVE","150mm","MP","TURBINE",,,,
,642.92,703.20,1247.69,,,,,01/04/2012,,"REMOVE","200mm","MP","TURBINE",,,,
,642.92,703.20,1376.14,,,,,01/04/2012,,"REMOVE","250mm","MP","TURBINE",,,,
1 SC001 - Scotland NTH01 - North STH01 - South WWE01 - Wales and West RDN01 - North West RDN01 - West Mids RDN01 - East RDN01 - London
2 NETW01 NETW02 NETW03 NETW04 NETW05 NETW06 NETW07 NETW08 NETW01 Scotland
3 SELLING_PRICE SELLING_PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE SELLING PRICE VALID_FROM VALID_TO ENTY_CODE MESC_CODE SVCPT_CODE METY_CODE NETW02 Northern
4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U16 LP DIAPHRAGM NETW03 Southern
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U25 LP DIAPHRAGM NETW04 Wales and West
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U40 LP DIAPHRAGM NETW05 North West
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U65 LP DIAPHRAGM NETW06 West Midlands
8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U100 LP DIAPHRAGM NETW07 East of England
9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 01/04/2012 INSTALL U160 LP DIAPHRAGM NETW08 London
10 229.32 190.87 221.00 314.65 837.89 829.40 851.24 949.74 01/04/2012 INSTALL U16 MP DIAPHRAGM
11 235.38 190.87 221.00 314.65 837.89 829.40 851.24 949.74 01/04/2012 INSTALL U25 MP DIAPHRAGM
12 376.88 221.00 251.14 436.58 1053.41 1045.28 1066.20 1185.05 01/04/2012 INSTALL U40 MP DIAPHRAGM
13 787.83 502.28 562.56 639.79 1112.73 1103.91 1126.58 1255.29 01/04/2012 INSTALL U65 MP DIAPHRAGM
14 884.87 562.56 622.83 680.43 1231.37 1221.20 1247.34 1395.77 01/04/2012 INSTALL U100 MP DIAPHRAGM
15 937.54 622.83 683.11 680.43 1350.00 1338.48 1368.09 1536.24 01/04/2012 INSTALL U160 MP DIAPHRAGM
16 705.64 383.60 385.02 557.03 793.07 784.03 807.25 924.72 01/04/2012 INSTALL 40mm LP ROTARY
17 705.64 383.60 385.02 557.03 793.07 784.03 807.25 924.72 01/04/2012 INSTALL 50mm LP ROTARY
18 1001.17 463.42 465.32 761.52 1073.94 1067.01 1084.81 1185.90 01/04/2012 INSTALL 80mm LP ROTARY
19 1001.17 463.42 465.32 761.52 1073.94 1067.01 1084.81 1185.90 01/04/2012 INSTALL 100mm LP ROTARY
20 1001.17 463.42 465.32 761.52 1073.94 1067.01 1084.81 1185.90 01/04/2012 INSTALL 150mm LP ROTARY
21 1736.77 1745.11 1559.61 01/04/2012 INSTALL 200mm LP ROTARY
22 1736.77 1745.11 1816.53 01/04/2012 INSTALL 250mm LP ROTARY
23 1022.84 763.47 821.48 742.70 1227.99 1215.06 1248.32 1379.34 01/04/2012 INSTALL 40mm MP ROTARY
24 1022.84 763.47 821.48 742.70 1227.99 1215.06 1248.32 1379.34 01/04/2012 INSTALL 50mm MP ROTARY
25 1567.72 843.84 901.63 964.93 1484.85 1475.22 1499.97 1640.52 01/04/2012 INSTALL 80mm MP ROTARY
26 1965.55 964.38 1021.84 1361.90 2462.87 2452.57 2479.05 2629.46 01/04/2012 INSTALL 100mm MP ROTARY
27 2737.18 1490.40 1455.13 1798.07 01/04/2012 INSTALL 150mm MP ROTARY
28 1527.34 1566.03 2054.99 01/04/2012 INSTALL 200mm MP ROTARY
29 1582.95 1566.03 2311.91 01/04/2012 INSTALL 250mm MP ROTARY
30 184.14 184.14 184.14 184.14 184.14 184.14 184.14 184.14 01/04/2012 OFMAT U16 LP DIAPHRAGM
31 190.02 190.02 190.02 190.02 190.02 190.02 190.02 190.02 01/04/2012 OFMAT U25 LP DIAPHRAGM
32 272.83 272.83 272.83 272.83 272.83 272.83 272.83 272.83 01/04/2012 OFMAT U40 LP DIAPHRAGM
33 345.28 345.28 345.28 345.28 345.28 345.28 345.28 345.28 01/04/2012 OFMAT U65 LP DIAPHRAGM
34 427.88 427.88 427.88 427.88 427.88 427.88 427.88 427.88 01/04/2012 OFMAT U100 LP DIAPHRAGM
35 550.49 550.49 550.49 550.49 550.49 550.49 550.49 550.49 01/04/2012 OFMAT U160 LP DIAPHRAGM
36 127.16 246.44 276.50 233.36 01/04/2012 OFMAT U16 MP DIAPHRAGM
37 127.16 246.44 276.50 233.36 01/04/2012 OFMAT U25 MP DIAPHRAGM
38 246.92 282.51 312.56 395.93 01/04/2012 OFMAT U40 MP DIAPHRAGM
39 246.92 625.13 685.24 517.86 01/04/2012 OFMAT U65 MP DIAPHRAGM
40 319.68 697.26 757.37 558.51 01/04/2012 OFMAT U100 MP DIAPHRAGM
41 343.94 841.52 898.79 599.15 01/04/2012 OFMAT U160 MP DIAPHRAGM
42 462.19 392.48 393.94 639.55 610.32 604.46 619.53 786.28 01/04/2012 OFMAT 50mm LP ROTARY
43 774.49 472.29 474.24 843.00 925.31 919.07 935.13 1112.80 01/04/2012 OFMAT 80mm LP ROTARY
44 982.00 614.16 617.01 1083.19 1142.71 1134.39 1155.82 1392.88 01/04/2012 OFMAT 100mm LP ROTARY
45 1336.93 1178.47 1183.37 1195.66 01/04/2012 OFMAT 150mm LP ROTARY
46 1742.91 1751.29 1308.13 01/04/2012 OFMAT 200mm LP ROTARY
47 2700.01 2714.27 1476.85 01/04/2012 OFMAT 250mm LP ROTARY
48 510.71 641.16 701.27 721.08 01/04/2012 OFMAT 50mm MP ROTARY
49 771.44 681.23 741.34 924.29 01/04/2012 OFMAT 80mm MP ROTARY
50 982.48 761.37 821.48 1249.42 01/04/2012 OFMAT 100mm MP ROTARY
51 1425.95 1001.81 1061.92 1361.90 01/04/2012 OFMAT 150mm MP ROTARY
52 1327.62 1369.21 1474.37 01/04/2012 OFMAT 200mm MP ROTARY
53 1327.62 1369.21 1643.08 01/04/2012 OFMAT 250mm MP ROTARY
54 145.77 145.77 145.77 145.77 145.77 145.77 145.77 145.77 01/04/2012 EXCHANGE U16 LP DIAPHRAGM
55 146.52 146.52 146.52 146.52 146.52 146.52 146.52 146.52 01/04/2012 EXCHANGE U25 LP DIAPHRAGM
56 296.58 296.58 296.58 296.58 296.58 296.58 296.58 296.58 01/04/2012 EXCHANGE U40 LP DIAPHRAGM
57 381.49 381.49 381.49 381.49 381.49 381.49 381.49 381.49 01/04/2012 EXCHANGE U65 LP DIAPHRAGM
58 557.63 557.63 557.63 557.63 557.63 557.63 557.63 557.63 01/04/2012 EXCHANGE U100 LP DIAPHRAGM
59 557.64 557.64 557.64 557.64 557.64 557.64 557.64 557.64 01/04/2012 EXCHANGE U160 LP DIAPHRAGM
60 223.11 246.44 276.50 267.23 865.94 864.55 872.70 977.41 01/04/2012 EXCHANGE U16 MP DIAPHRAGM
61 223.11 246.44 276.50 436.58 865.94 864.55 872.70 977.41 01/04/2012 EXCHANGE U25 MP DIAPHRAGM
62 306.49 282.51 312.56 721.08 1063.92 1072.52 1078.03 1209.20 01/04/2012 EXCHANGE U40 MP DIAPHRAGM
63 534.78 625.13 685.24 822.68 1283.38 1289.49 1343.69 1518.26 01/04/2012 EXCHANGE U65 MP DIAPHRAGM
64 607.56 697.26 757.37 856.55 1402.02 1406.78 1458.41 1651.72 01/04/2012 EXCHANGE U100 MP DIAPHRAGM
65 631.82 841.52 898.79 998.83 1514.73 1518.19 1573.12 1785.17 01/04/2012 EXCHANGE U160 MP DIAPHRAGM
66 821.30 383.60 385.02 914.25 1057.97 1049.06 1072.00 1325.80 01/04/2012 EXCHANGE 40mm LP ROTARY
67 821.30 383.60 385.02 914.25 1057.97 1049.06 1072.00 1325.80 01/04/2012 EXCHANGE 50mm LP ROTARY
68 821.30 463.42 465.17 1111.10 1001.71 993.44 1014.73 1250.29 01/04/2012 EXCHANGE 80mm LP ROTARY
69 913.71 605.30 608.08 1223.78 1162.29 1152.19 1178.18 1465.79 01/04/2012 EXCHANGE 100mm LP ROTARY
70 1438.64 1172.33 1177.19 1364.37 01/04/2012 EXCHANGE 150mm LP ROTARY
71 1736.77 1745.11 1308.13 01/04/2012 EXCHANGE 200mm LP ROTARY
72 1736.77 1745.11 1476.85 01/04/2012 EXCHANGE 250mm LP ROTARY
73 1109.17 761.37 701.27 1005.57 01/04/2012 EXCHANGE 40mm MP ROTARY
74 1109.17 761.37 701.27 1005.57 01/04/2012 EXCHANGE 50mm MP ROTARY
75 1109.17 801.45 741.34 1277.54 01/04/2012 EXCHANGE 80mm MP ROTARY
76 1355.64 881.59 821.48 1390.02 01/04/2012 EXCHANGE 100mm MP ROTARY
77 2106.52 1122.02 1061.92 1530.61 01/04/2012 EXCHANGE 150mm MP ROTARY
78 1327.62 1369.21 2205.46 01/04/2012 EXCHANGE 200mm MP ROTARY
79 1327.62 1369.21 2289.82 01/04/2012 EXCHANGE 250mm MP ROTARY
80 142.63 142.63 142.63 142.63 142.63 142.63 142.63 142.63 01/04/2012 REMOVE U16 LP DIAPHRAGM
81 142.63 142.63 142.63 142.63 142.63 142.63 142.63 142.63 01/04/2012 REMOVE U25 LP DIAPHRAGM
82 214.56 214.56 214.56 214.56 214.56 214.56 214.56 214.56 01/04/2012 REMOVE U40 LP DIAPHRAGM
83 257.57 257.57 257.57 257.57 257.57 257.57 257.57 257.57 01/04/2012 REMOVE U65 LP DIAPHRAGM
84 409.50 409.50 409.50 409.50 409.50 409.50 409.50 409.50 01/04/2012 REMOVE U100 LP DIAPHRAGM
85 431.96 431.96 431.96 431.96 431.96 431.96 431.96 431.96 01/04/2012 REMOVE U160 LP DIAPHRAGM
86 225.70 140.64 170.78 194.20 01/04/2012 REMOVE U16 MP DIAPHRAGM
87 274.21 140.64 170.78 194.20 01/04/2012 REMOVE U25 MP DIAPHRAGM
88 448.05 140.64 170.78 314.65 01/04/2012 REMOVE U40 MP DIAPHRAGM
89 593.57 281.28 401.83 436.58 01/04/2012 REMOVE U65 MP DIAPHRAGM
90 653.51 281.28 401.83 477.22 01/04/2012 REMOVE U100 MP DIAPHRAGM
91 703.85 281.28 401.83 477.22 01/04/2012 REMOVE U160 MP DIAPHRAGM
92 452.09 259.47 260.11 355.15 01/04/2012 REMOVE 50mm LP ROTARY
93 767.40 259.47 260.11 598.99 01/04/2012 REMOVE 80mm LP ROTARY
94 859.70 436.82 438.55 775.74 01/04/2012 REMOVE 100mm LP ROTARY
95 1158.41 672.64 674.94 1027.49 01/04/2012 REMOVE 150mm LP ROTARY
96 887.36 890.99 1155.96 01/04/2012 REMOVE 200mm LP ROTARY
97 1378.19 1384.83 1284.42 01/04/2012 REMOVE 250mm LP ROTARY
98 539.90 401.83 462.10 395.93 01/04/2012 REMOVE 50mm MP ROTARY
99 794.90 401.83 462.10 680.43 01/04/2012 REMOVE 80mm MP ROTARY
100 942.58 522.37 582.65 862.30 01/04/2012 REMOVE 100mm MP ROTARY
101 1185.91 522.37 582.65 1119.22 01/04/2012 REMOVE 150mm MP ROTARY
102 642.92 703.20 1247.69 01/04/2012 REMOVE 200mm MP ROTARY
103 642.92 703.20 1376.14 01/04/2012 REMOVE 250mm MP ROTARY
104 452.09 259.47 260.11 355.15 01/04/2012 REMOVE 50mm LP TURBINE
105 767.40 259.47 260.11 598.99 01/04/2012 REMOVE 80mm LP TURBINE
106 859.70 436.82 438.55 775.74 01/04/2012 REMOVE 100mm LP TURBINE
107 1158.41 672.64 674.94 1027.49 01/04/2012 REMOVE 150mm LP TURBINE
108 887.36 890.99 1155.96 01/04/2012 REMOVE 200mm LP TURBINE
109 1378.19 1384.83 1284.42 01/04/2012 REMOVE 250mm LP TURBINE
110 539.90 401.83 462.10 395.93 01/04/2012 REMOVE 50mm MP TURBINE
111 794.90 401.83 462.10 680.43 01/04/2012 REMOVE 80mm MP TURBINE
112 942.58 522.37 582.65 862.30 01/04/2012 REMOVE 100mm MP TURBINE
113 1185.91 522.37 582.65 1119.22 01/04/2012 REMOVE 150mm MP TURBINE
114 642.92 703.20 1247.69 01/04/2012 REMOVE 200mm MP TURBINE
115 642.92 703.20 1376.14 01/04/2012 REMOVE 250mm MP TURBINE

View File

@@ -1,194 +1,198 @@
,,,,,,,,,,,,
SELLING_PRICE,COST_PRICE,DELIVERY_COST,VALID_FROM,VALID_TO,COST_TYPE,MODU_CODE,HOU_CODE,BAS_CODE,ADIT_CODE,METY_CODE,MESC_CODE,ENTY_CODE
0.00,,0.00,01/04/2012,,MOCO,AD016S,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD016SW,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD025S,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD025SW,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD040S,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD065S,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD100S,,,,,,
0.00,,0.00,01/04/2012,,MOCO,AD160S,,,,,,
377.91,,27.50,01/04/2012,,MOCO,ARCMVV0025A,,,,,,
377.91,,27.50,01/04/2012,,MOCO,ARCMVV0025AW,,,,,,
459.23,,27.50,01/04/2012,,MOCO,ARCMVV0040AW,,,,,,
459.23,,27.50,01/04/2012,,MOCO,ARCMVV0040A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMHH0065A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMVV0065A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMVH0065A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMHV0065A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMHH0100A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMVV0100A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMVH0100A,,,,,,
1144.25,,60.50,01/04/2012,,MOCO,ARCMHV0100A,,,,,,
1412.97,,60.50,01/04/2012,,MOCO,ARCMVV0160A,,,,,,
1412.97,,60.50,01/04/2012,,MOCO,ARCMHH0160A,,,,,,
1412.97,,60.50,01/04/2012,,MOCO,ARCMVH0160A,,,,,,
1412.97,,60.50,01/04/2012,,MOCO,ARCMHV0160A,,,,,,
1446.08,,60.50,01/04/2012,,MOCO,ARCMVV0200A,,,,,,
1446.08,,60.50,01/04/2012,,MOCO,ARCMHH0200A,,,,,,
1446.08,,60.50,01/04/2012,,MOCO,ARCMVH0200A,,,,,,
1446.08,,60.50,01/04/2012,,MOCO,ARCMHV0200A,,,,,,
1463.39,,60.50,01/04/2012,,MOCO,ARCMVV0250A,,,,,,
1463.39,,60.50,01/04/2012,,MOCO,ARCMHH0250A,,,,,,
1463.39,,60.50,01/04/2012,,MOCO,ARCMVH0250A,,,,,,
1463.39,,60.50,01/04/2012,,MOCO,ARCMHV0250A,,,,,,
2617.55,,60.50,01/04/2012,,MOCO,ARVV0250AP,,,,,,
2617.55,,60.50,01/04/2012,,MOCO,ARHH0250AP,,,,,,
2617.55,,60.50,01/04/2012,,MOCO,ARVH0250AP,,,,,,
2617.55,,60.50,01/04/2012,,MOCO,ARHV0250AP,,,,,,
1843.34,,60.50,01/04/2012,,MOCO,ARVV0300A,,,,,,
1843.34,,60.50,01/04/2012,,MOCO,ARHH0300A,,,,,,
1843.34,,60.50,01/04/2012,,MOCO,ARVH0300A,,,,,,
1843.34,,60.50,01/04/2012,,MOCO,ARHV0300A,,,,,,
3584.81,,99.00,01/04/2012,,MOCO,ARVV0300AP,,,,,,
3584.81,,99.00,01/04/2012,,MOCO,ARHH0300AP,,,,,,
3584.81,,99.00,01/04/2012,,MOCO,ARVH0300AP,,,,,,
3584.81,,99.00,01/04/2012,,MOCO,ARHV0300AP,,,,,,
2313.14,,60.50,01/04/2012,,MOCO,ARVV0400A,,,,,,
2313.14,,60.50,01/04/2012,,MOCO,ARHH0400A,,,,,,
2313.14,,60.50,01/04/2012,,MOCO,ARVH0400A,,,,,,
2313.14,,60.50,01/04/2012,,MOCO,ARHV0400A,,,,,,
2899.79,,99.00,01/04/2012,,MOCO,ARVV0650A,,,,,,
2899.79,,99.00,01/04/2012,,MOCO,ARHH0650A,,,,,,
2899.79,,99.00,01/04/2012,,MOCO,ARVH0650A,,,,,,
2899.79,,99.00,01/04/2012,,MOCO,ARHV0650A,,,,,,
5861.72,,550.00,01/04/2012,,MOCO,ARVV0650AP,,,,,,
5861.72,,550.00,01/04/2012,,MOCO,ARHH0650AP,,,,,,
5861.72,,550.00,01/04/2012,,MOCO,ARVH0650AP,,,,,,
5861.72,,550.00,01/04/2012,,MOCO,ARHV0650AP,,,,,,
2984.16,,99.00,01/04/2012,,MOCO,ARVV1000A,,,,,,
2984.16,,99.00,01/04/2012,,MOCO,ARHH1000A,,,,,,
2984.16,,99.00,01/04/2012,,MOCO,ARVH1000A,,,,,,
2984.16,,99.00,01/04/2012,,MOCO,ARHV1000A,,,,,,
6519.03,,550.00,01/04/2012,,MOCO,ARVV1000AP,,,,,,
6519.03,,550.00,01/04/2012,,MOCO,ARHH1000AP,,,,,,
6519.03,,550.00,01/04/2012,,MOCO,ARVH1000AP,,,,,,
6519.03,,550.00,01/04/2012,,MOCO,ARHV1000AP,,,,,,
314.14,,92.40,01/04/2012,,MOCO,ASD016A,,,,,,
314.14,,92.40,01/04/2012,,MOCO,ASD016AW,,,,,,
437.34,,92.40,01/04/2012,,MOCO,ASD025A,,,,,,
595.21,,92.40,01/04/2012,,MOCO,ASD040A,,,,,,
1126.44,,92.40,01/04/2012,,MOCO,ASD065A,,,,,,
2517.10,,92.40,01/04/2012,,MOCO,ASD100A,,,,,,
2271.58,,92.40,01/04/2012,,MOCO,ASD160A,,,,,,
677.13,,92.40,01/04/2012,,MOCO,ASR0025A,,,,,,
733.74,,92.40,01/04/2012,,MOCO,ASR0040A,,,,,,
2603.78,,92.40,01/04/2012,,MOCO,ASR0100A,,,,,,
2988.50,,92.40,01/04/2012,,MOCO,ASR0160A,,,,,,
3356.58,,92.40,01/04/2012,,MOCO,ASR0200A,,,,,,
4714.75,,92.40,01/04/2012,,MOCO,ASR0250A,,,,,,
5453.07,,92.40,01/04/2012,,MOCO,ASR0300A,,,,,,
5453.07,,92.40,01/04/2012,,MOCO,ASR0400A,,,,,,
6445.43,,550.00,01/04/2012,,MOCO,ASR0650A,,,,,,
8088.34,,550.00,01/04/2012,,MOCO,ASR1000A,,,,,,
1765.50,,77.00,01/04/2012,,MOCO,ASR0025D,,,,,,
1765.50,,77.00,01/04/2012,,MOCO,ASR0040D,,,,,,
1765.50,,77.00,01/04/2012,,MOCO,ASR0065D,,,,,,
1765.50,,77.00,01/04/2012,,MOCO,ASR0100D,,,,,,
3586.00,,77.00,01/04/2012,,MOCO,ASR0160D,,,,,,
4757.50,,99.00,01/04/2012,,MOCO,ASR0250D,,,,,,
4845.50,,99.00,01/04/2012,,MOCO,ASR0310D,,,,,,
4845.50,,165.00,01/04/2012,,MOCO,ASR0450D,,,,,,
5857.50,,165.00,01/04/2012,,MOCO,ASR0450DP,,,,,,
7045.50,,209.00,01/04/2012,,MOCO,ASR0650D,,,,,,
8541.50,,209.00,01/04/2012,,MOCO,ASR1075D,,,,,,
10461.00,,275.00,01/04/2012,,MOCO,ASR1600D,,,,,,
14074.50,,495.00,01/04/2012,,MOCO,ASR2885D,,,,,,
481.05,,,01/04/2012,,AICO,,,,EMS,,,
400.00,,,01/04/2012,,AICO,,,,LIFTING GEAR,,,
968.00,,,01/04/2012,,BACO,,,RA0025LPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0025MPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0040LPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0040MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0065LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0100LPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0100MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0160LPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0160MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0200LPB,,,,
968.00,,,01/04/2012,,BACO,,,RA0200MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0250+LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0250LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0250MPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA0300+LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0300LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0300MPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA0400LPB,,,,
1573.00,,,01/04/2012,,BACO,,,RA0400MPB,,,,
2057.00,,,01/04/2012,,BACO,,,RA0650+LPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA0650LPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA0650MPB,,,,
2057.00,,,01/04/2012,,BACO,,,RA1000+LPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA1000LPB,,,,
1875.50,,,01/04/2012,,BACO,,,RA1000MPB,,,,
968.00,,,01/04/2012,,BACO,,,RD0025MPB,,,,
968.00,,,01/04/2012,,BACO,,,RD0040MPB,,,,
968.00,,,01/04/2012,,BACO,,,RD0065MPB,,,,
968.00,,,01/04/2012,,BACO,,,RD0100MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RD0160MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RD0250MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RD0310MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RD0450+MPB,,,,
1573.00,,,01/04/2012,,BACO,,,RD0450MPB,,,,
1875.50,,,01/04/2012,,BACO,,,RD0650MPB,,,,
1875.50,,,01/04/2012,,BACO,,,RD1075MPB,,,,
1875.50,,,01/04/2012,,BACO,,,RD1600MPB,,,,
2359.50,,,01/04/2012,,BACO,,,RD2885MPB,,,,
968.00,,,01/04/2012,,BACO,,,U016LPB,,,,
968.00,,,01/04/2012,,BACO,,,U016MPB,,,,
968.00,,,01/04/2012,,BACO,,,U025LPB,,,,
968.00,,,01/04/2012,,BACO,,,U025MPB,,,,
968.00,,,01/04/2012,,BACO,,,U040LPB,,,,
968.00,,,01/04/2012,,BACO,,,U040MPB,,,,
968.00,,,01/04/2012,,BACO,,,U065LPB,,,,
1573.00,,,01/04/2012,,BACO,,,U065MPB,,,,
1573.00,,,01/04/2012,,BACO,,,U100LPB,,,,
1573.00,,,01/04/2012,,BACO,,,U100MPB,,,,
1573.00,,,01/04/2012,,BACO,,,U160LPB,,,,
1573.00,,,01/04/2012,,BACO,,,U160MPB,,,,
294.96,,,01/04/2012,,HOCO,,GC2,,,,,
294.96,,,01/04/2012,,HOCO,,GC2FS,,,,,
360.78,,,01/04/2012,,HOCO,,GC2MP,,,,,
375.99,,,01/04/2012,,HOCO,,GC3,,,,,
465.18,,,01/04/2012,,HOCO,,GC4,,,,,
751.18,,,01/04/2012,,HOCO,,GC4+,,,,,
791.94,,,01/04/2012,,HOCO,,GC5,,,,,
1016.16,,,01/04/2012,,HOCO,,GC6LP,,,,,
1016.16,,,01/04/2012,,HOCO,,GC6MP,,,,,
1133.09,,,01/04/2012,,HOCO,,GC7LP,,,,,
1133.09,,,01/04/2012,,HOCO,,GC7MP,,,,,
1258.99,,,01/04/2012,,HOCO,,GC7+LP,,,,,
1258.99,,,01/04/2012,,HOCO,,GC7+MP,,,,,
2704.35,,,01/04/2012,,HOCO,,GC8LP/MP,,,,,
360.78,,,01/04/2012,,HOCO,,Gas Cab No 2 (Multi),,,,,
465.18,,,01/04/2012,,HOCO,,Gas Cab No 4,,,,,
1007.36,,,01/04/2012,,HOCO,,Gas Cab No 6,,,,,
3858.69,,,01/04/2012,,HOCO,,Custom1,,,,,
4245.89,,,01/04/2012,,HOCO,,Custom2,,,,,
4409.24,,,01/04/2012,,HOCO,,Custom3,,,,,
4093.43,,,01/04/2012,,HOCO,,Custom4,,,,,
4478.21,,,01/04/2012,,HOCO,,Custom5,,,,,
5290.12,,,01/04/2012,,HOCO,,Custom6,,,,,
3502.95,,,01/04/2012,,HOCO,,KP1,,,,,
3731.64,,,01/04/2012,,HOCO,,KP2,,,,,
4008.73,,,01/04/2012,,HOCO,,KP3,,,,,
4698.43,,,01/04/2012,,HOCO,,KP4,,,,,
4826.69,,,01/04/2012,,HOCO,,KP5,,,,,
294.96,,,01/04/2012,,HOCO,,Gas Cab No 2BB,,,,,
375.99,,,01/04/2012,,HOCO,,Gas Cab No 4BB25,,,,,
439.37,,,01/04/2012,,HOCO,,Gas Cab No 4BB40,,,,,
985.27,,,01/04/2012,,HOCO,,Gas Cab No 6BB100,,,,,
1124.22,,,01/04/2012,,HOCO,,Gas Cab No 6BB160,,,,,
294.96,,,01/04/2012,,HOCO,,GC2FSBB,,,,,
375.99,,,01/04/2012,,HOCO,,GC3BB,,,,,
375.99,,,01/04/2012,,HOCO,,GC4BB25,,,,,
439.37,,,01/04/2012,,HOCO,,GC4BB40,,,,,
791.94,,,01/04/2012,,HOCO,,GC5BB,,,,,
985.27,,,01/04/2012,,HOCO,,GC6BB100,,,,,
1124.22,,,01/04/2012,,HOCO,,GC6BB160,,,,,
294.96,,,01/04/2012,,HOCO,,GC2BB,,,,,
360.78,,,01/04/2012,,HOCO,,Gas Cab No 2MP,,,,,
5581.73,,,01/04/2012,,HOCO,,Custom7,,,,,
,,,,,AICO,,,,PURGING,Diaphragm,,ADVERSARIAL
,,,,,AICO,,,,PURGING,Diaphragm,,
,,,,,AICO,,,,PURGING,Diaphragm,,STD REMOVE
"SELLING_PRICE","COST_PRICE","DELIVERY_COST","VALID_FROM","VALID_TO","COST_TYPE","MODU_CODE","HOU_CODE","BAS_CODE","ADIT_CODE","METY_CODE","MESC_CODE","ENTY_CODE"
0.00,,0.00,01/04/2012,,"MOCO","AD016S",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD016SW",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD025S",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD025SW",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD040S",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD065S",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD100S",,,,,,
0.00,,0.00,01/04/2012,,"MOCO","AD160S",,,,,,
377.91,,27.50,01/04/2012,,"MOCO","ARCMVV0025A",,,,,,
377.91,,27.50,01/04/2012,,"MOCO","ARCMVV0025AW",,,,,,
459.23,,27.50,01/04/2012,,"MOCO","ARCMVV0040AW",,,,,,
459.23,,27.50,01/04/2012,,"MOCO","ARCMVV0040A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMHH0065A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMVV0065A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMVH0065A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMHV0065A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMHH0100A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMVV0100A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMVH0100A",,,,,,
1144.25,,60.50,01/04/2012,,"MOCO","ARCMHV0100A",,,,,,
1412.97,,60.50,01/04/2012,,"MOCO","ARCMVV0160A",,,,,,
1412.97,,60.50,01/04/2012,,"MOCO","ARCMHH0160A",,,,,,
1412.97,,60.50,01/04/2012,,"MOCO","ARCMVH0160A",,,,,,
1412.97,,60.50,01/04/2012,,"MOCO","ARCMHV0160A",,,,,,
1446.08,,60.50,01/04/2012,,"MOCO","ARCMVV0200A",,,,,,
1446.08,,60.50,01/04/2012,,"MOCO","ARCMHH0200A",,,,,,
1446.08,,60.50,01/04/2012,,"MOCO","ARCMVH0200A",,,,,,
1446.08,,60.50,01/04/2012,,"MOCO","ARCMHV0200A",,,,,,
1463.39,,60.50,01/04/2012,,"MOCO","ARCMVV0250A",,,,,,
1463.39,,60.50,01/04/2012,,"MOCO","ARCMHH0250A",,,,,,
1463.39,,60.50,01/04/2012,,"MOCO","ARCMVH0250A",,,,,,
1463.39,,60.50,01/04/2012,,"MOCO","ARCMHV0250A",,,,,,
2617.55,,60.50,01/04/2012,,"MOCO","ARVV0250AP",,,,,,
2617.55,,60.50,01/04/2012,,"MOCO","ARHH0250AP",,,,,,
2617.55,,60.50,01/04/2012,,"MOCO","ARVH0250AP",,,,,,
2617.55,,60.50,01/04/2012,,"MOCO","ARHV0250AP",,,,,,
1843.34,,60.50,01/04/2012,,"MOCO","ARVV0300A",,,,,,
1843.34,,60.50,01/04/2012,,"MOCO","ARHH0300A",,,,,,
1843.34,,60.50,01/04/2012,,"MOCO","ARVH0300A",,,,,,
1843.34,,60.50,01/04/2012,,"MOCO","ARHV0300A",,,,,,
3584.81,,99.00,01/04/2012,,"MOCO","ARVV0300AP",,,,,,
3584.81,,99.00,01/04/2012,,"MOCO","ARHH0300AP",,,,,,
3584.81,,99.00,01/04/2012,,"MOCO","ARVH0300AP",,,,,,
3584.81,,99.00,01/04/2012,,"MOCO","ARHV0300AP",,,,,,
2313.14,,60.50,01/04/2012,,"MOCO","ARVV0400A",,,,,,
2313.14,,60.50,01/04/2012,,"MOCO","ARHH0400A",,,,,,
2313.14,,60.50,01/04/2012,,"MOCO","ARVH0400A",,,,,,
2313.14,,60.50,01/04/2012,,"MOCO","ARHV0400A",,,,,,
2899.79,,99.00,01/04/2012,,"MOCO","ARVV0650A",,,,,,
2899.79,,99.00,01/04/2012,,"MOCO","ARHH0650A",,,,,,
2899.79,,99.00,01/04/2012,,"MOCO","ARVH0650A",,,,,,
2899.79,,99.00,01/04/2012,,"MOCO","ARHV0650A",,,,,,
5861.72,,550.00,01/04/2012,,"MOCO","ARVV0650AP",,,,,,
5861.72,,550.00,01/04/2012,,"MOCO","ARHH0650AP",,,,,,
5861.72,,550.00,01/04/2012,,"MOCO","ARVH0650AP",,,,,,
5861.72,,550.00,01/04/2012,,"MOCO","ARHV0650AP",,,,,,
2984.16,,99.00,01/04/2012,,"MOCO","ARVV1000A",,,,,,
2984.16,,99.00,01/04/2012,,"MOCO","ARHH1000A",,,,,,
2984.16,,99.00,01/04/2012,,"MOCO","ARVH1000A",,,,,,
2984.16,,99.00,01/04/2012,,"MOCO","ARHV1000A",,,,,,
6519.03,,550.00,01/04/2012,,"MOCO","ARVV1000AP",,,,,,
6519.03,,550.00,01/04/2012,,"MOCO","ARHH1000AP",,,,,,
6519.03,,550.00,01/04/2012,,"MOCO","ARVH1000AP",,,,,,
6519.03,,550.00,01/04/2012,,"MOCO","ARHV1000AP",,,,,,
314.14,,92.40,01/04/2012,,"MOCO","ASD016A",,,,,,
314.14,,92.40,01/04/2012,,"MOCO","ASD016AW",,,,,,
437.34,,92.40,01/04/2012,,"MOCO","ASD025A",,,,,,
595.21,,92.40,01/04/2012,,"MOCO","ASD040A",,,,,,
1126.44,,92.40,01/04/2012,,"MOCO","ASD065A",,,,,,
2517.10,,92.40,01/04/2012,,"MOCO","ASD100A",,,,,,
2271.58,,92.40,01/04/2012,,"MOCO","ASD160A",,,,,,
677.13,,92.40,01/04/2012,,"MOCO","ASR0025A",,,,,,
733.74,,92.40,01/04/2012,,"MOCO","ASR0040A",,,,,,
2603.78,,92.40,01/04/2012,,"MOCO","ASR0100A",,,,,,
2988.50,,92.40,01/04/2012,,"MOCO","ASR0160A",,,,,,
3356.58,,92.40,01/04/2012,,"MOCO","ASR0200A",,,,,,
4714.75,,92.40,01/04/2012,,"MOCO","ASR0250A",,,,,,
5453.07,,92.40,01/04/2012,,"MOCO","ASR0300A",,,,,,
5453.07,,92.40,01/04/2012,,"MOCO","ASR0400A",,,,,,
6445.43,,550.00,01/04/2012,,"MOCO","ASR0650A",,,,,,
8088.34,,550.00,01/04/2012,,"MOCO","ASR1000A",,,,,,
1765.50,,77.00,01/04/2012,,"MOCO","ASR0025D",,,,,,
1765.50,,77.00,01/04/2012,,"MOCO","ASR0040D",,,,,,
1765.50,,77.00,01/04/2012,,"MOCO","ASR0065D",,,,,,
1765.50,,77.00,01/04/2012,,"MOCO","ASR0100D",,,,,,
3586.00,,77.00,01/04/2012,,"MOCO","ASR0160D",,,,,,
4757.50,,99.00,01/04/2012,,"MOCO","ASR0250D",,,,,,
4845.50,,99.00,01/04/2012,,"MOCO","ASR0310D",,,,,,
4845.50,,165.00,01/04/2012,,"MOCO","ASR0450D",,,,,,
5857.50,,165.00,01/04/2012,,"MOCO","ASR0450DP",,,,,,
7045.50,,209.00,01/04/2012,,"MOCO","ASR0650D",,,,,,
8541.50,,209.00,01/04/2012,,"MOCO","ASR1075D",,,,,,
10461.00,,275.00,01/04/2012,,"MOCO","ASR1600D",,,,,,
14074.50,,495.00,01/04/2012,,"MOCO","ASR2885D",,,,,,
481.05,,,01/04/2012,,"AICO",,,,"EMS",,,
400.00,,,01/04/2012,,"AICO",,,,"LIFTING GEAR",,,
0.00,,,01/04/2012,,"AICO",,,,"PURGING","Diaphragm",,"REMOVE"
0.00,,,01/04/2012,,"AICO",,,,"AMR",,,
666.69,,,01/04/2012,,"AICO",,,,"CONVERTER INSTALL",,,
224.04,,,01/04/2012,,"AICO",,,,"CONVERTER REMOVE",,,
968.00,,,01/04/2012,,"BACO",,,"RA0025LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0025MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0040LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0040MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0065LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0100LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0100MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0160LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0160MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0200LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RA0200MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0250+LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0250LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0250MPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA0300+LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0300LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0300MPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA0400LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RA0400MPB",,,,
2057.00,,,01/04/2012,,"BACO",,,"RA0650+LPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA0650LPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA0650MPB",,,,
2057.00,,,01/04/2012,,"BACO",,,"RA1000+LPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA1000LPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RA1000MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RD0025MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RD0040MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RD0065MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"RD0100MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RD0160MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RD0250MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RD0310MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RD0450+MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"RD0450MPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RD0650MPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RD1075MPB",,,,
1875.50,,,01/04/2012,,"BACO",,,"RD1600MPB",,,,
2359.50,,,01/04/2012,,"BACO",,,"RD2885MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U016LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U016MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U025LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U025MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U040LPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U040MPB",,,,
968.00,,,01/04/2012,,"BACO",,,"U065LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"U065MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"U100LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"U100MPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"U160LPB",,,,
1573.00,,,01/04/2012,,"BACO",,,"U160MPB",,,,
294.96,,,01/04/2012,,"HOCO",,"GC2",,,,,
294.96,,,01/04/2012,,"HOCO",,"GC2FS",,,,,
360.78,,,01/04/2012,,"HOCO",,"GC2MP",,,,,
375.99,,,01/04/2012,,"HOCO",,"GC3",,,,,
465.18,,,01/04/2012,,"HOCO",,"GC4",,,,,
751.18,,,01/04/2012,,"HOCO",,"GC4+",,,,,
791.94,,,01/04/2012,,"HOCO",,"GC5",,,,,
1016.16,,,01/04/2012,,"HOCO",,"GC6LP",,,,,
1016.16,,,01/04/2012,,"HOCO",,"GC6MP",,,,,
1133.09,,,01/04/2012,,"HOCO",,"GC7LP",,,,,
1133.09,,,01/04/2012,,"HOCO",,"GC7MP",,,,,
1258.99,,,01/04/2012,,"HOCO",,"GC7+LP",,,,,
1258.99,,,01/04/2012,,"HOCO",,"GC7+MP",,,,,
2704.35,,,01/04/2012,,"HOCO",,"GC8LP/MP",,,,,
360.78,,,01/04/2012,,"HOCO",,"Gas Cab No 2 (Multi)",,,,,
465.18,,,01/04/2012,,"HOCO",,"Gas Cab No 4",,,,,
1007.36,,,01/04/2012,,"HOCO",,"Gas Cab No 6",,,,,
3858.69,,,01/04/2012,,"HOCO",,"Custom1",,,,,
4245.89,,,01/04/2012,,"HOCO",,"Custom2",,,,,
4409.24,,,01/04/2012,,"HOCO",,"Custom3",,,,,
4093.43,,,01/04/2012,,"HOCO",,"Custom4",,,,,
4478.21,,,01/04/2012,,"HOCO",,"Custom5",,,,,
5290.12,,,01/04/2012,,"HOCO",,"Custom6",,,,,
3502.95,,,01/04/2012,,"HOCO",,"KP1",,,,,
3731.64,,,01/04/2012,,"HOCO",,"KP2",,,,,
4008.73,,,01/04/2012,,"HOCO",,"KP3",,,,,
4698.43,,,01/04/2012,,"HOCO",,"KP4",,,,,
4826.69,,,01/04/2012,,"HOCO",,"KP5",,,,,
294.96,,,01/04/2012,,"HOCO",,"Gas Cab No 2BB",,,,,
375.99,,,01/04/2012,,"HOCO",,"Gas Cab No 4BB25",,,,,
439.37,,,01/04/2012,,"HOCO",,"Gas Cab No 4BB40",,,,,
985.27,,,01/04/2012,,"HOCO",,"Gas Cab No 6BB100",,,,,
1183.27,,,01/04/2012,,"HOCO",,"Gas Cab No 6BB160",,,,,
294.96,,,01/04/2012,,"HOCO",,"GC2FSBB",,,,,
375.99,,,01/04/2012,,"HOCO",,"GC3BB",,,,,
375.99,,,01/04/2012,,"HOCO",,"GC4BB25",,,,,
439.37,,,01/04/2012,,"HOCO",,"GC4BB40",,,,,
791.94,,,01/04/2012,,"HOCO",,"GC5BB",,,,,
985.27,,,01/04/2012,,"HOCO",,"GC6BB100",,,,,
1183.27,,,01/04/2012,,"HOCO",,"GC6BB160",,,,,
294.96,,,01/04/2012,,"HOCO",,"GC2BB",,,,,
360.78,,,01/04/2012,,"HOCO",,"Gas Cab No 2MP",,,,,
5581.73,,,01/04/2012,,"HOCO",,"Custom7",,,,,
,,,,,"AICO",,,,"PURGING","Diaphragm",,"ADVERSARIAL"
,,,,,"AICO",,,,"PURGING","Diaphragm",,
,,,,,"AICO",,,,"PURGING","Diaphragm",,"STD REMOVE"
1
2 SELLING_PRICE COST_PRICE DELIVERY_COST VALID_FROM VALID_TO COST_TYPE MODU_CODE HOU_CODE BAS_CODE ADIT_CODE METY_CODE MESC_CODE ENTY_CODE
3 0.00 0.00 01/04/2012 MOCO AD016S
4 0.00 0.00 01/04/2012 MOCO AD016SW
5 0.00 0.00 01/04/2012 MOCO AD025S
6 0.00 0.00 01/04/2012 MOCO AD025SW
7 0.00 0.00 01/04/2012 MOCO AD040S
8 0.00 0.00 01/04/2012 MOCO AD065S
9 0.00 0.00 01/04/2012 MOCO AD100S
10 0.00 0.00 01/04/2012 MOCO AD160S
11 377.91 27.50 01/04/2012 MOCO ARCMVV0025A
12 377.91 27.50 01/04/2012 MOCO ARCMVV0025AW
13 459.23 27.50 01/04/2012 MOCO ARCMVV0040AW
14 459.23 27.50 01/04/2012 MOCO ARCMVV0040A
15 1144.25 60.50 01/04/2012 MOCO ARCMHH0065A
16 1144.25 60.50 01/04/2012 MOCO ARCMVV0065A
17 1144.25 60.50 01/04/2012 MOCO ARCMVH0065A
18 1144.25 60.50 01/04/2012 MOCO ARCMHV0065A
19 1144.25 60.50 01/04/2012 MOCO ARCMHH0100A
20 1144.25 60.50 01/04/2012 MOCO ARCMVV0100A
21 1144.25 60.50 01/04/2012 MOCO ARCMVH0100A
22 1144.25 60.50 01/04/2012 MOCO ARCMHV0100A
23 1412.97 60.50 01/04/2012 MOCO ARCMVV0160A
24 1412.97 60.50 01/04/2012 MOCO ARCMHH0160A
25 1412.97 60.50 01/04/2012 MOCO ARCMVH0160A
26 1412.97 60.50 01/04/2012 MOCO ARCMHV0160A
27 1446.08 60.50 01/04/2012 MOCO ARCMVV0200A
28 1446.08 60.50 01/04/2012 MOCO ARCMHH0200A
29 1446.08 60.50 01/04/2012 MOCO ARCMVH0200A
30 1446.08 60.50 01/04/2012 MOCO ARCMHV0200A
31 1463.39 60.50 01/04/2012 MOCO ARCMVV0250A
32 1463.39 60.50 01/04/2012 MOCO ARCMHH0250A
33 1463.39 60.50 01/04/2012 MOCO ARCMVH0250A
34 1463.39 60.50 01/04/2012 MOCO ARCMHV0250A
35 2617.55 60.50 01/04/2012 MOCO ARVV0250AP
36 2617.55 60.50 01/04/2012 MOCO ARHH0250AP
37 2617.55 60.50 01/04/2012 MOCO ARVH0250AP
38 2617.55 60.50 01/04/2012 MOCO ARHV0250AP
39 1843.34 60.50 01/04/2012 MOCO ARVV0300A
40 1843.34 60.50 01/04/2012 MOCO ARHH0300A
41 1843.34 60.50 01/04/2012 MOCO ARVH0300A
42 1843.34 60.50 01/04/2012 MOCO ARHV0300A
43 3584.81 99.00 01/04/2012 MOCO ARVV0300AP
44 3584.81 99.00 01/04/2012 MOCO ARHH0300AP
45 3584.81 99.00 01/04/2012 MOCO ARVH0300AP
46 3584.81 99.00 01/04/2012 MOCO ARHV0300AP
47 2313.14 60.50 01/04/2012 MOCO ARVV0400A
48 2313.14 60.50 01/04/2012 MOCO ARHH0400A
49 2313.14 60.50 01/04/2012 MOCO ARVH0400A
50 2313.14 60.50 01/04/2012 MOCO ARHV0400A
51 2899.79 99.00 01/04/2012 MOCO ARVV0650A
52 2899.79 99.00 01/04/2012 MOCO ARHH0650A
53 2899.79 99.00 01/04/2012 MOCO ARVH0650A
54 2899.79 99.00 01/04/2012 MOCO ARHV0650A
55 5861.72 550.00 01/04/2012 MOCO ARVV0650AP
56 5861.72 550.00 01/04/2012 MOCO ARHH0650AP
57 5861.72 550.00 01/04/2012 MOCO ARVH0650AP
58 5861.72 550.00 01/04/2012 MOCO ARHV0650AP
59 2984.16 99.00 01/04/2012 MOCO ARVV1000A
60 2984.16 99.00 01/04/2012 MOCO ARHH1000A
61 2984.16 99.00 01/04/2012 MOCO ARVH1000A
62 2984.16 99.00 01/04/2012 MOCO ARHV1000A
63 6519.03 550.00 01/04/2012 MOCO ARVV1000AP
64 6519.03 550.00 01/04/2012 MOCO ARHH1000AP
65 6519.03 550.00 01/04/2012 MOCO ARVH1000AP
66 6519.03 550.00 01/04/2012 MOCO ARHV1000AP
67 314.14 92.40 01/04/2012 MOCO ASD016A
68 314.14 92.40 01/04/2012 MOCO ASD016AW
69 437.34 92.40 01/04/2012 MOCO ASD025A
70 595.21 92.40 01/04/2012 MOCO ASD040A
71 1126.44 92.40 01/04/2012 MOCO ASD065A
72 2517.10 92.40 01/04/2012 MOCO ASD100A
73 2271.58 92.40 01/04/2012 MOCO ASD160A
74 677.13 92.40 01/04/2012 MOCO ASR0025A
75 733.74 92.40 01/04/2012 MOCO ASR0040A
76 2603.78 92.40 01/04/2012 MOCO ASR0100A
77 2988.50 92.40 01/04/2012 MOCO ASR0160A
78 3356.58 92.40 01/04/2012 MOCO ASR0200A
79 4714.75 92.40 01/04/2012 MOCO ASR0250A
80 5453.07 92.40 01/04/2012 MOCO ASR0300A
81 5453.07 92.40 01/04/2012 MOCO ASR0400A
82 6445.43 550.00 01/04/2012 MOCO ASR0650A
83 8088.34 550.00 01/04/2012 MOCO ASR1000A
84 1765.50 77.00 01/04/2012 MOCO ASR0025D
85 1765.50 77.00 01/04/2012 MOCO ASR0040D
86 1765.50 77.00 01/04/2012 MOCO ASR0065D
87 1765.50 77.00 01/04/2012 MOCO ASR0100D
88 3586.00 77.00 01/04/2012 MOCO ASR0160D
89 4757.50 99.00 01/04/2012 MOCO ASR0250D
90 4845.50 99.00 01/04/2012 MOCO ASR0310D
91 4845.50 165.00 01/04/2012 MOCO ASR0450D
92 5857.50 165.00 01/04/2012 MOCO ASR0450DP
93 7045.50 209.00 01/04/2012 MOCO ASR0650D
94 8541.50 209.00 01/04/2012 MOCO ASR1075D
95 10461.00 275.00 01/04/2012 MOCO ASR1600D
96 14074.50 495.00 01/04/2012 MOCO ASR2885D
97 481.05 01/04/2012 AICO EMS
98 400.00 01/04/2012 AICO LIFTING GEAR
99 968.00 0.00 01/04/2012 BACO AICO RA0025LPB PURGING Diaphragm REMOVE
100 968.00 0.00 01/04/2012 BACO AICO RA0025MPB AMR
101 968.00 666.69 01/04/2012 BACO AICO RA0040LPB CONVERTER INSTALL
102 968.00 224.04 01/04/2012 BACO AICO RA0040MPB CONVERTER REMOVE
103 1573.00 968.00 01/04/2012 BACO RA0065LPB RA0025LPB
104 1573.00 968.00 01/04/2012 BACO RA0100LPB RA0025MPB
105 968.00 01/04/2012 BACO RA0100MPB RA0040LPB
106 1573.00 968.00 01/04/2012 BACO RA0160LPB RA0040MPB
107 968.00 1573.00 01/04/2012 BACO RA0160MPB RA0065LPB
108 1573.00 01/04/2012 BACO RA0200LPB RA0100LPB
109 968.00 01/04/2012 BACO RA0200MPB RA0100MPB
110 1573.00 01/04/2012 BACO RA0250+LPB RA0160LPB
111 1573.00 968.00 01/04/2012 BACO RA0250LPB RA0160MPB
112 1573.00 01/04/2012 BACO RA0250MPB RA0200LPB
113 1875.50 968.00 01/04/2012 BACO RA0300+LPB RA0200MPB
114 1573.00 01/04/2012 BACO RA0300LPB RA0250+LPB
115 1573.00 01/04/2012 BACO RA0300MPB RA0250LPB
116 1875.50 1573.00 01/04/2012 BACO RA0400LPB RA0250MPB
117 1573.00 1875.50 01/04/2012 BACO RA0400MPB RA0300+LPB
118 2057.00 1573.00 01/04/2012 BACO RA0650+LPB RA0300LPB
119 1875.50 1573.00 01/04/2012 BACO RA0650LPB RA0300MPB
120 1875.50 01/04/2012 BACO RA0650MPB RA0400LPB
121 2057.00 1573.00 01/04/2012 BACO RA1000+LPB RA0400MPB
122 1875.50 2057.00 01/04/2012 BACO RA1000LPB RA0650+LPB
123 1875.50 01/04/2012 BACO RA1000MPB RA0650LPB
124 968.00 1875.50 01/04/2012 BACO RD0025MPB RA0650MPB
125 968.00 2057.00 01/04/2012 BACO RD0040MPB RA1000+LPB
126 968.00 1875.50 01/04/2012 BACO RD0065MPB RA1000LPB
127 968.00 1875.50 01/04/2012 BACO RD0100MPB RA1000MPB
128 1573.00 968.00 01/04/2012 BACO RD0160MPB RD0025MPB
129 1573.00 968.00 01/04/2012 BACO RD0250MPB RD0040MPB
130 1573.00 968.00 01/04/2012 BACO RD0310MPB RD0065MPB
131 1573.00 968.00 01/04/2012 BACO RD0450+MPB RD0100MPB
132 1573.00 01/04/2012 BACO RD0450MPB RD0160MPB
133 1875.50 1573.00 01/04/2012 BACO RD0650MPB RD0250MPB
134 1875.50 1573.00 01/04/2012 BACO RD1075MPB RD0310MPB
135 1875.50 1573.00 01/04/2012 BACO RD1600MPB RD0450+MPB
136 2359.50 1573.00 01/04/2012 BACO RD2885MPB RD0450MPB
137 968.00 1875.50 01/04/2012 BACO U016LPB RD0650MPB
138 968.00 1875.50 01/04/2012 BACO U016MPB RD1075MPB
139 968.00 1875.50 01/04/2012 BACO U025LPB RD1600MPB
140 968.00 2359.50 01/04/2012 BACO U025MPB RD2885MPB
141 968.00 01/04/2012 BACO U040LPB U016LPB
142 968.00 01/04/2012 BACO U040MPB U016MPB
143 968.00 01/04/2012 BACO U065LPB U025LPB
144 1573.00 968.00 01/04/2012 BACO U065MPB U025MPB
145 1573.00 968.00 01/04/2012 BACO U100LPB U040LPB
146 1573.00 968.00 01/04/2012 BACO U100MPB U040MPB
147 1573.00 968.00 01/04/2012 BACO U160LPB U065LPB
148 1573.00 01/04/2012 BACO U160MPB U065MPB
149 294.96 1573.00 01/04/2012 HOCO BACO GC2 U100LPB
150 294.96 1573.00 01/04/2012 HOCO BACO GC2FS U100MPB
151 360.78 1573.00 01/04/2012 HOCO BACO GC2MP U160LPB
152 375.99 1573.00 01/04/2012 HOCO BACO GC3 U160MPB
153 465.18 294.96 01/04/2012 HOCO GC4 GC2
154 751.18 294.96 01/04/2012 HOCO GC4+ GC2FS
155 791.94 360.78 01/04/2012 HOCO GC5 GC2MP
156 1016.16 375.99 01/04/2012 HOCO GC6LP GC3
157 1016.16 465.18 01/04/2012 HOCO GC6MP GC4
158 1133.09 751.18 01/04/2012 HOCO GC7LP GC4+
159 1133.09 791.94 01/04/2012 HOCO GC7MP GC5
160 1258.99 1016.16 01/04/2012 HOCO GC7+LP GC6LP
161 1258.99 1016.16 01/04/2012 HOCO GC7+MP GC6MP
162 2704.35 1133.09 01/04/2012 HOCO GC8LP/MP GC7LP
163 360.78 1133.09 01/04/2012 HOCO Gas Cab No 2 (Multi) GC7MP
164 465.18 1258.99 01/04/2012 HOCO Gas Cab No 4 GC7+LP
165 1007.36 1258.99 01/04/2012 HOCO Gas Cab No 6 GC7+MP
166 3858.69 2704.35 01/04/2012 HOCO Custom1 GC8LP/MP
167 4245.89 360.78 01/04/2012 HOCO Custom2 Gas Cab No 2 (Multi)
168 4409.24 465.18 01/04/2012 HOCO Custom3 Gas Cab No 4
169 4093.43 1007.36 01/04/2012 HOCO Custom4 Gas Cab No 6
170 4478.21 3858.69 01/04/2012 HOCO Custom5 Custom1
171 5290.12 4245.89 01/04/2012 HOCO Custom6 Custom2
172 3502.95 4409.24 01/04/2012 HOCO KP1 Custom3
173 3731.64 4093.43 01/04/2012 HOCO KP2 Custom4
174 4008.73 4478.21 01/04/2012 HOCO KP3 Custom5
175 4698.43 5290.12 01/04/2012 HOCO KP4 Custom6
176 4826.69 3502.95 01/04/2012 HOCO KP5 KP1
177 294.96 3731.64 01/04/2012 HOCO Gas Cab No 2BB KP2
178 375.99 4008.73 01/04/2012 HOCO Gas Cab No 4BB25 KP3
179 439.37 4698.43 01/04/2012 HOCO Gas Cab No 4BB40 KP4
180 985.27 4826.69 01/04/2012 HOCO Gas Cab No 6BB100 KP5
181 1124.22 294.96 01/04/2012 HOCO Gas Cab No 6BB160 Gas Cab No 2BB
182 294.96 375.99 01/04/2012 HOCO GC2FSBB Gas Cab No 4BB25
183 375.99 439.37 01/04/2012 HOCO GC3BB Gas Cab No 4BB40
184 375.99 985.27 01/04/2012 HOCO GC4BB25 Gas Cab No 6BB100
185 439.37 1183.27 01/04/2012 HOCO GC4BB40 Gas Cab No 6BB160
186 791.94 294.96 01/04/2012 HOCO GC5BB GC2FSBB
187 985.27 375.99 01/04/2012 HOCO GC6BB100 GC3BB
188 1124.22 375.99 01/04/2012 HOCO GC6BB160 GC4BB25
189 294.96 439.37 01/04/2012 HOCO GC2BB GC4BB40
190 360.78 791.94 01/04/2012 HOCO Gas Cab No 2MP GC5BB
191 5581.73 985.27 01/04/2012 HOCO Custom7 GC6BB100
192 1183.27 01/04/2012 AICO HOCO GC6BB160 PURGING Diaphragm ADVERSARIAL
193 294.96 01/04/2012 AICO HOCO GC2BB PURGING Diaphragm
194 360.78 01/04/2012 AICO HOCO Gas Cab No 2MP PURGING Diaphragm STD REMOVE
195 5581.73 01/04/2012 HOCO Custom7
196 AICO PURGING Diaphragm ADVERSARIAL
197 AICO PURGING Diaphragm
198 AICO PURGING Diaphragm STD REMOVE